Partially Withheld Memo Discussing Telcon W/Util Mgt Re Technical Review Team (Trt) Interview W/Allegers.Util Attempting to Interfere W/Trt Insp of Allegation.Advice Re Changes to Procedures to Address Issue Requested
ML20206U506
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/16/1984
From: Tang R
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML19284C882 List: ... further results
References
FOIA-85-59 NUDOCS 8607100508
Download: ML20206U506 (2)


Text

-

h 80\' 16 M MEMORANDUM FOR: Vincent S. Noonan Project Director for Comanche Peak FROM: R.C. Tang Gomanche Peak Technical Review Team

SUBJECT:

TELEPHONE CALL FROM TUGC0 MANAGEMENT i RE: TRT INTERVIEW WITH ALLEGERS At approximately 11:30 am on 11/12/84 (yeteran's Day), I received a phone call at home throuch the NRC operator. T identified himself as

' of Comanche Peak.

the Brown & Root manager at t e omanche Peak site. I have me with once onsite to discuss TUGC0 personnel exit interviews, and recognizea his voice.

said that he had with him in his office ~ He said that the TRT had tried to contact for interview and that had gone to him since he had not been able to return the phone calls. '

asked me when and where the interview 5;ould be held. I told him tnat there was an opening at 7:30 pm on 11/15/84 at the Granbury Inn Conference Room. The response was given to him in good faith since he was re resentin TUGC0 management when he called me. M then said that would go to the interview with his asked if h meant l he TUGC0 attorney. He said no, it would be. attorney, asked me for the names of other individuals w om the TRT had contacted. He said that "they would come to us anyway. ... we 'are only trying to help..." I told him that it would be the individuals' choice to report the TRT contacts to the utility management, but as a general policy, we do not disclose such information to the utility management.

Knowing that orks the day shift, called him up at 10:30 pm EST

! on the same'da . I asked to veri ad told me was ind gownwishes, said that he did go to and to a him about the TRT's contacts with him, but he denied any TUGC0 policy or procedure requiring him to do so. I asked him why he thought

^

is a coatirigs QC inspector at CPSES. I called a.t,,,, 3

-1/

7 T:o p.m. EST on 11/S/84 and was told by M h R begas _bmepc.Q but would call me back in 15 minutes. I gave him th~ CQpefato.rideh hy'ci 1;5.)

number and asked him to call back collect. He never$re l

FolA-85-5

$ 71 g 8 860624 DO NOT DISCLOSE g GARDE 85-59 PDR p k \.

3

) NOV 16 1984 it was necessary to bring an attorney, he did not answer. He said that TRT calls him in the evenings "during his free time". I said that this is done to protect the individual's identity. I asked him if he would prefer to be contacted or interviewed onsite, he said no. I told him someone from TRT would call him on 11/13 or 11/14 at 6:30 pm CST to confirm the interview.

This appears to be a case of the utility management attempting to interfere with the TRT ongoing inspections / investigations of allegations. I intend to revise the TRT procedure to address this issue. Please advise.

R.C. Tang Comanche Peak -

Technical Review Team cc: D. Eise:ihut, NRR/DL

/

C :TRT  :  :  :  :  :  :

\ME :RCT g:pf  :  :  :  :  :  :

____: ___7_______:____________: ___________:____________.____________.. __________.___________

ETE :11//L/84  :  :  :  :  :  :

OFFICIAL RECORD COPY

.