ML20206U551

From kanterella
Jump to navigation Jump to search
Summary of Technical Review Team 850325 Feedback Interview W/Alleger SRT-A-1 Re Concerns AQ-121 & 122.Alleger Concerns Based on Lack of Familiarity w/non-ASME Procedures
ML20206U551
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/15/1985
From: Poslusny C
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
Shared Package
ML19284C882 List: ... further results
References
FOIA-85-59 NUDOCS 8607110022
Download: ML20206U551 (2)


Text

y1 n

/} (

o um%,t ,

UNITED STATES NUCLEAR REGULATORY COMMISSION I

{ WASHINGTON, D. C. 20555

\...../ g APR 151985 i Docket No.: B0-445/446 MEMORANDUM FOR: Vincent S. Noonan, Director Comanche Peak Project FROM: Chet Poslusny, Program Coordinator Comanche Peak Project

SUBJECT:

FEEDBACK REPORT TO ALLEGER SRT A-1 On March 25, 1985, the TRT held a feedback telephone interview with alleger SRT A-1. The feedback was done by telephone rather than in person as agreed to with the alleger because it was a relatively general issue based on concer'ns which the individual raised with the Special Inspection Team, and was not a direct allegation.

The alleger's concerns (AQ-121, 122) were that program controls for non-ASME areas were less structured than for those areas constructed according to ASME codes; and that QA has been deficient because of lack of support of QC in the past.

The TRT found that the non-ASME program does indeed have a quality program and procedures which are being followed and concluded that the alleger's concerns were based on lack of familiarity with non-ASME procedures. Alleger SRT A-1 understood the findings and stated that he had no further concerns related to ASME vs. non-ASME work.

Y Chet Poslusny, Pro ram Coordinator Comanche Peak Project l cc: D. Eisenhut B. Hayes J. Youngblood M. Kline l

l l

8607110022 860624 PDR FOIA

=

h9" GARDE 85-59 PDR i

I b' N

pe t/ .

$ff$>']

1 APR 151985 Docket No.: 50-445/446 MEMORANDUM FOR: Vincent S. Noonan, Director Comanche Peak Project FROM: Chet Poslusny, Program Coordinator Comanche Peak Project

SUBJECT:

FEEDBACK REPORT TO ALLEGER SRT A-1 On March 25, 1985, the TRT held a feedback telephone interview with alleger SRT A-1. The feedback was done by telephone rather thar, in person as agreed to with the alleger because it was a relatively general issue based on concerns which the individual raised with the Special Inspection Team, and was not a direct allegation.

The alleger's concerns (AQ-121, 122) were that program controls for non-ASME areas were less structured than for those areas constructed according to ASME codes; and that QA has been deficient because of lack of support of QC in the past.

The TRT found that the non-ASME program does indeed have a quality program and procedures which are being followed and concluded that the alleger's concerns were based on lack of familiarity with non-ASME procedures. Alleger SRT A-1 understood the findings and stated that he had no further concerns related to ASME vs. non-ASME work.

Chet Poslusny, Program Coordinator Comanche Peak Project cc: D. Eisenhut B. Hayes l J. Youngblood M. Kline OFC :CPP 7 p  :  :  :  :  :  :

....:.___: .3 ______:____________:____________: ___________:____________:____________:___________

! NAME :CPosFusny  :  :  :  :  :  :

_____: ____f._____:____________:____________:____________:____________:____________:___________

DATE : 0 //)/85  :  :  :  :  :  :

0FFICIAL RECORD COPY l

_. _ _ _ _