o um%,t UNITED STATES NUCLEAR REGULATORY COMMISSION I
{
WASHINGTON, D. C. 20555
\\...../
g APR 151985 i
Docket No.:
B0-445/446 MEMORANDUM FOR:
Vincent S. Noonan, Director Comanche Peak Project FROM:
Chet Poslusny, Program Coordinator Comanche Peak Project
SUBJECT:
FEEDBACK REPORT TO ALLEGER SRT A-1 On March 25, 1985, the TRT held a feedback telephone interview with alleger SRT A-1.
The feedback was done by telephone rather than in person as agreed to with the alleger because it was a relatively general issue based on concer'ns which the individual raised with the Special Inspection Team, and was not a direct allegation.
The alleger's concerns (AQ-121, 122) were that program controls for non-ASME areas were less structured than for those areas constructed according to ASME codes; and that QA has been deficient because of lack of support of QC in the past.
The TRT found that the non-ASME program does indeed have a quality program and procedures which are being followed and concluded that the alleger's concerns were based on lack of familiarity with non-ASME procedures. Alleger SRT A-1 understood the findings and stated that he had no further concerns related to ASME vs. non-ASME work.
Y Chet Poslusny, Pro ram Coordinator Comanche Peak Project l
cc:
D. Eisenhut B. Hayes J. Youngblood M. Kline l
l l
8607110022 860624 h
=
b' N
GARDE 85-59 PDR I
/
pe t
$ff$>']
1 APR 151985 Docket No.:
50-445/446 MEMORANDUM FOR:
Vincent S. Noonan, Director Comanche Peak Project FROM:
Chet Poslusny, Program Coordinator Comanche Peak Project
SUBJECT:
FEEDBACK REPORT TO ALLEGER SRT A-1 On March 25, 1985, the TRT held a feedback telephone interview with alleger SRT A-1.
The feedback was done by telephone rather thar, in person as agreed to with the alleger because it was a relatively general issue based on concerns which the individual raised with the Special Inspection Team, and was not a direct allegation.
The alleger's concerns (AQ-121, 122) were that program controls for non-ASME areas were less structured than for those areas constructed according to ASME codes; and that QA has been deficient because of lack of support of QC in the past.
The TRT found that the non-ASME program does indeed have a quality program and procedures which are being followed and concluded that the alleger's concerns were based on lack of familiarity with non-ASME procedures. Alleger SRT A-1 understood the findings and stated that he had no further concerns related to ASME vs. non-ASME work.
Chet Poslusny, Program Coordinator Comanche Peak Project cc:
D. Eisenhut l
B. Hayes J. Youngblood M. Kline OFC :CPP p
7 3
! NAME :CPosFusny
____f._____:____________:____________:____________:____________:____________:___________
DATE : 0 //)/85 0FFICIAL RECORD COPY l