ML20127D695

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp
ML20127D695
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/13/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9301190012
Download: ML20127D695 (3)


Text

" - - _ _ _ _ _ _ _ - _ _ _ . _ _ . .

UNtit D ST AT E S

/g8"ICoq$g NUCLEAR REGULATORY COMMISSION HColoN IV i

fI CI o,

[h*( [

t' 011 RY AN PL AZA DRIVE, $Ulf E 400 AR LINGT ON, T E X A$ 760118064

"' JAN I 31993 fl0TICE OF SIGrilflCAlli LICEllSLE MEETil1G flame of Licensee: TV Llectric flame of f acility: Comanche Peak Steam Electric Station Unit 2 Docket tio.: 50-446 -_

Date and Time January 22, 1993 of Meeting: 9 a.m. (CST) location of Meeting: Comanche Peak Steam Electric Station Personnel Processing Center Glen Rose, Texas Purpose of Meeting: Public exit meeting to discuss the results of the Operational Readiness Assessment Team inspection f4RC Attendees: J. Milhoan, Regional Administrator J. Roe, Director, Division of Reactor Projects-Ill, IV, V, Office of tiuclear Reactor Regulation (f4RR)

M. Virgilio, Assistant Director for Regions IV and V, 11RR C. Rossi, Director, Division of Reactor Inspection and Licensee Performance, 11RR S. Black, Director, Project Directorate IV-2, 11RR E. Imbro, Chief, Special Inspection Branch, 11RR P. Koltay, Team Leader, Special Inspection Branch,11RR B. Holian, Senior Project Manager, f4RR D. Chamberlain, Deputy Director, Division of Reactor Safety D. Graves, Senior Resident inspector, Unit 2, Division of Reactor Projects (DRP)

T. Gwynn, Deputy Director, DRP R. Latta, Resident inspector, Unit 2, DRP L. Yandell, Chief, Project Section B, DRP Licensee Attendees: W. Taylor, Executive Vice President, Production H. Bruner, Senior Vice President W. Cahill, Group Vice President, fluclear Engineering and Operations J. Donahue, Operations Manager, Unit 2 S. Harrison, Manager, Project Overview T. Hope, Unit 2 Licensing Manager J. Kelley, Plant Manager D. Kross. Operations Manager, Unit 2 D. Moore, Manager, Operations Transition 9301190012 930113 PDR ADOCK 05000446 G PDR

TV Electric C. Rau, Project Manager, Unit 2 R. Walker, Manager of Regulatory Aff airs for fluclear Engineering Organization NOTE:

(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made known by COB on January 20 via telephone call to L. Yandell (817/860-8182).

(2) This meeting is open to attendance by members of the general public.

G ,/ ,m Approved B : -- A / /~

/

.g Al'BTWYeadi,~Nrect Division of Reac r ro YT/ [gt s i

e I

a- - . . _ . , . . . . ._

,5 /

TV Electric JAN I 31993 Distribution:

J. H. Sniezek, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21)

T. E. Murley, D/NRR (MS 1201)

W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 1209)

J. Lieberman, D/0E (MS 7H5)

L. J. Chandler, OGC (MS 1S818)

OED0 RIV Coordinator (M5 17G21)

L. R. Plisco, LPEB/NRR (MS 10A19)

J. M. Montgomery, DRA G. f. Sanborn, E0 C. A. Hackney, RSLO J. Gilliland, PAO, RIV NRC Attendees RA Secretary Division Secretary (DRP, DRS)

DMB IE45 A. Mattila J50026 l

l l

PAh[b RSLO D:DRP LAYandell;d JTGillilhnd I ABBeach RIV:C:DRP/Bff 1/(1/93 g 1/g/93 CAHackney 1/ /93 1/l3/93 Il0