ML20127C486
| ML20127C486 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/11/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9301140231 | |
| Download: ML20127C486 (2) | |
Text
. - _.
g>R AFog UNITE D STATES h,
NUCLEAR REGULATORY COMMISSION
+
nEolON IV
^8 611 nY AN PLAZ A OntVE,KUlf E 400 AH LINoTON, T EX AS 76011 8064 JAN I i 1993 NOTICE OF SIGNIFICANI LICENSEE MEETING Name of Licensee:
10 Electric Name of Facility:
Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 Docket No.:
50-445; 50-446 Date and Time January 15, 1993 of Meeting:
2 p.m. (CST) location of Meeting:
Region IV office, Division of Reactor Projects conference room Purpose of Meeting:
Public management meating to discuss CPSES temporary modification program NRC Attendees:
J. Milhoan, Regional Administrator A. Beach, Director, Division of Reactor Projects (DRP)
T. Gwynn, Deputy Director, DRP D, Chamberlain, Deputy Director, Division of Reactor Safety W. Jones, Senior Resident Inspector, Unit 1, DRP L. Yandell,-Chief, Project Section B, DRP T. Reis, Project Engineer, Project Section 8, DRP ticensee Attendees:
W. Cahill, Group Vice President, Nuclear Engineering and Operations L. Terry, Vice President, Engineering J. Kelley, Vice President / Plant Manager R. Walker, Manager of Regulato.ry Affairs for Nuclear Engineering Organization NOTE:
(1)
Attendance by NRC personnel at the NRC/ licensee meeting should be made known by-COB on January 14 via telephone call to L. Yandell (817/860-8182).
(2)
This meeting is open to attendance by members of the general public.
Y/
Approved By:
M.
.J' 3
-/
- 4. Bill Beach, p,rsctof i
Division of ReaMor P jects F800PI 9301140231 930111 l
PDR ADOCK 05000445
[
h f,/
j P
10 Electric Distribution:
J. H. Snlezek, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 12D1)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 1209)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, CGC (MS 15B18)
T. Bergman, Project Manager, NRR (MS 13H15)
- 8. Holian, Project Manager, NRk (MS 13H15)
OEDO RIV Coordinatar (MS 17G21)
L. R. Plisco, LPEB/NRR (MS 10A19)
J. M. Montgomery, DRA
- 0. F. Sanborn, E0 C. A. Hackney, RSLO J. Gilliland, PAO, RIV NRC Attendees RA Secretary Division Secretary (DRP, DRS)
DMB IE45 A. Mattila PAQs ' p?[
(3:
h
/
RIV:C:DRP RSLO' e D RP nP LAYandell JTGilliland CAHackney TPGwynn. -ABBeach 1/;j/93
/
1/)l/93 1/it/93 1/ (( /93 1/tf/93 l
l i