ML20058C545

From kanterella
Jump to navigation Jump to search
Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026
ML20058C545
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 11/22/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9312020481
Download: ML20058C545 (3)


Text

_

f UNITED STATES

(

g MCtiq

. j h, d g

h NUCLEAR REGULATORY COMMISSION l

.j j

i REGION IV

/[

611 RYAN PLAZA DRIVE, SUITE 400 g' -v4 b ARLINGTCN, TEXAS 76011-8064 j

o *****

fD/ 2 21993 l

l NOTICE OF SIGNIFICANT LICENSEE MEETING l

l Name of Licensee:

TU Electric l

Name of Facility:

Comanche Peak Steam Electric Station, Unit 1 l

Docket No..

50-445 Date and Time December 2, 1993 of Meeting:

1 p.m. (CST)

Loce. tion of Meeting: Region IV Training Conference Room Purpose of Meeting:

Enforcement conference regarding the reactor coolant spill inside containment on October 26, 1993 NRC Attencees:

J. Milhoan, Regional Administrator l

A. Beach, Director, Division of Reactor Projects (DRP)

T. Gwynn, Deputy Director, DRP G. F. Sanborn, Enforcement Officer L. Yandell, Chief, Project Section B, DRP D. Powers, Chief, Maintenance Section, Division of Reactor Safety T. Reis, Project Engineer, DRP D. Graves, Senior Resident inspector, DRP j

K. Kennedy, Resident Inspector, DRP T. A. Bergman. Project Manager, Project Directorate IV-2, Office of Nuclear Reactor Regulation j

Licensee Attendees:

W. M. Taylor, Executive Vice President W. J. Cahill, Group Vice President, Nuclear Engineering and Operations i

C. L. Terry, Vice President of Nuclear Operations R. D. Walker, Manager of Regulatory Affairs j

J. W. Donahue, Manager, Operations NOTE:

(1) Attendance by other NRC personnel at this meeting should be made known by COB on December 1 via telephone call to Larry Yandell (817/860-8182).

(2)

Due to the nature of the subject matter, this meeting is not open to attendance by members of the general public.

Approved BY A.

i

Beach, 9f g ac or Projects

/f?

?

'8aPck 8

U O

TU Electric NOV 2 2 l933 Distribution:

tDMB;(IEf45)!'

J. H. Sniezek, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21)

T. E. Murley, D/NRR (MS 12D1)

W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 12D9)

J. Lieberman, D/0E (MS 7H5)

L. J. Chandler, OGC (MS 15818)

OEDO RIV Coordinator (MS 17G21)

J. M. Montgomery, DRA C. A. Hackney, RSLO J. Gilliland, PAO, RIV NRC Attendees RA Secretary Carol Gordon Division Secretary (DRP)

L. S. Ousley RIV File l

1 i

l 4

i Yl()/l/$'

i j

TU Electric -

NOV' 2 21993 l

r Distribution:

DMB (IE 45)

J. H. Sniezek, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21).

T. E. Murley, D/NRR (MS 12DI) l W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 12D9)

'i J. Lieberman, D/0E (MS 7H5)

L. J. Chandler, OGC (MS 15B18)

OEDO RIV Coordinator (MS 17G21) l J. M. Montgomery, DRA C. A. Hackney, RSLO j

J. Gilliland, PAO, RIV NRC Attendees l

RA Secretary

~

l Carol Gordon i

Division Secretary (DRP) j L. S. Ousley t

RIV File

-l r

1 i

l i

r

^i

_l l

a l

~