ML20206U603
Jump to navigation
Jump to search
| ML20206U603 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/27/1985 |
| From: | Zudans J NRC |
| To: | |
| Shared Package | |
| ML19284C882 | List:
|
| References | |
| FOIA-85-59 NUDOCS 8607110037 | |
| Download: ML20206U603 (1) | |
Text
{{#Wiki_filter:A-3/ Telecon with Alleger A-31: 1 ' .x. 1/27/85 (1130 EST), I contacted alleger A-31 in order to arrange a feedback interview to discuss his concerns about the construction of the Comanche Peak Nuclear Power Plant. Alleger A-31 told me he would be willing to meet with us in Ft. Lauderdale, FL. I told him I would contact him the week of 1/28 to confirm a time and date.
- 7e
,5; '. } g m .d. n l l F0lA-85-59 wa-GARDE 85-59 PDR =}}