Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current IssuesML20211H444 |
Person / Time |
---|
Site: |
Palo Verde, Grand Gulf, Cooper, Arkansas Nuclear, River Bend, Diablo Canyon, Callaway, San Onofre, Comanche Peak, Fort Calhoun |
---|
Issue date: |
08/27/1999 |
---|
From: |
Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
To: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
References |
---|
NUDOCS 9909020090 |
Download: ML20211H444 (15) |
|
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217M6061999-10-20020 October 1999 Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs ML20217J2381999-10-13013 October 1999 Informs That Attached Questions Transmitted by Fax on 991013 to J Rainsberry of Southern California Corp to Prepare for Upcoming Telephone Call ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20212G3791999-09-24024 September 1999 Notification of 991006-07 Meeting with Industry in San Clemente,California to Discuss Technical Issues Re Industry Development of Submittals for risk-informed Technical Specification Improvements IR 05000416/19990021999-09-10010 September 1999 Notification of Significant Licensee Meeting with Entergy Operations,Inc on 991018 to Discuss Listed Topics Identified in NRC Insp Repts 50-416/99-02,99-03 & 99-06 ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211J5591999-09-0101 September 1999 Informs That Application Date in First Line of Attached Ltr Issued 990823 Corrected to Read 990625, Not 1997. Requests That Corrected Copy Be Submitted to H Ray ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20211H0431999-08-0909 August 1999 Submits Comments on San Onofre Response to NRC Request for Addl Info on risk-informed IST Program ML20210J9721999-08-0202 August 1999 Notification of 990817 Meeting with Util in Rockville,Md to Discuss Util Radiological Consequences Improvement Program Implementation,Program Impact on Util Response to GL 99-02 & Alternate Course of Action to Requirements Discussed in GL ML20210G4671999-07-30030 July 1999 Forwards Draft rept,NUREG/CR-xxxx,Vol x,INEEL/EXT-99-00373, High-Pressure Safety Injection Sys Reliability,1987-1997 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209F6111999-07-12012 July 1999 Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196J5661999-07-0101 July 1999 Notification of 990714 Meeting with OPPD & CE in Rockville, Maryland to Discuss Staff Concerns with OPPD PTLR Submittal & CEOG Topical Rept CE NPSD-683 ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20196F7641999-06-23023 June 1999 Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20196B5291999-06-15015 June 1999 Notification of Significant Licensee Meeting with Util on 990715 Re Introduction of New Members of Midamerican Energy Co Senior Mgt to NRC Region IV Managers ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20195H7251999-06-11011 June 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam,Submittal for Retake Exam Administered on 990416 ML20195H6031999-06-11011 June 1999 Forwards Exam Repts 50-361/99-301 & 50-362/99-301 Administered at Facility on 990416,with as Given Written Exam Attached ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20207F1141999-06-0404 June 1999 Notification of Significant Licensee Meeting with Util on 990628 to Discuss Emergency Preparedness Program Status & Planned Changes ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G4241999-06-0202 June 1999 Notification of 990630 Meeting with Util in Fort Calhoun, Nebraska to Discuss Miscellaneous Management Topics & Plant Status ML20207D3251999-05-28028 May 1999 Notification of 990617 Meeting with Util in Blair,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Fort Calhoun Station ML20207E6241999-05-28028 May 1999 Notification of 990622 Meeting with Util in Auburn,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Cooper Nuclear Station ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205Q4491999-04-19019 April 1999 Forwards Viewgraphs of 990419 Telcon Re SG Eddy Current Insp Results Obtained During Imminent Refueling Outage ML20205R6021999-04-16016 April 1999 Notification of 990506 Mgt Meeting with Util in Arlington,Tx to Discuss Rev 3 to Cooper Engineering Improvement Strategy & Implementation of Cooper C/A Program ML20205N8821999-04-15015 April 1999 Forwards Questions Transmitted by Fax on 990415 to J Rainsberry of SCE & Request for Conference Call to Be Scheduled with Staff to Discuss SG Eddy Current Insp Results Obtained During Imminent Refueling Outage ML20205N5991999-04-14014 April 1999 Forwards Questions That Were Transmitted by Fax on 990414 to J Rainsberry of Southern California Corp,In Preparation for Upcoming Telcon on Recirculation Signal/Emergency Feedwater Actuation Signal While Channel in Tripped Condition ML20205M0111999-04-13013 April 1999 Forwards Questions to Be Discussed in Upcoming Telcon on GL 95-07.Questions Transmitted by Fax on 990413 to J Rrainsberry of SCE ML20205N1741999-04-12012 April 1999 Notification of Revised Licensee Meeting with Util on 990419 to Discuss Results of PPR Completed 990211.New Location of Meeting Will Be in Visiting Inspector room,2nd Floor at Fort Calhoun Station,Admin Bldg,Fort Calhoun,Ne 1999-09-24
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217M6061999-10-20020 October 1999 Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs ML20217J2381999-10-13013 October 1999 Informs That Attached Questions Transmitted by Fax on 991013 to J Rainsberry of Southern California Corp to Prepare for Upcoming Telephone Call ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20212G3791999-09-24024 September 1999 Notification of 991006-07 Meeting with Industry in San Clemente,California to Discuss Technical Issues Re Industry Development of Submittals for risk-informed Technical Specification Improvements IR 05000416/19990021999-09-10010 September 1999 Notification of Significant Licensee Meeting with Entergy Operations,Inc on 991018 to Discuss Listed Topics Identified in NRC Insp Repts 50-416/99-02,99-03 & 99-06 ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211J5591999-09-0101 September 1999 Informs That Application Date in First Line of Attached Ltr Issued 990823 Corrected to Read 990625, Not 1997. Requests That Corrected Copy Be Submitted to H Ray ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20211H0431999-08-0909 August 1999 Submits Comments on San Onofre Response to NRC Request for Addl Info on risk-informed IST Program ML20210J9721999-08-0202 August 1999 Notification of 990817 Meeting with Util in Rockville,Md to Discuss Util Radiological Consequences Improvement Program Implementation,Program Impact on Util Response to GL 99-02 & Alternate Course of Action to Requirements Discussed in GL ML20210G4671999-07-30030 July 1999 Forwards Draft rept,NUREG/CR-xxxx,Vol x,INEEL/EXT-99-00373, High-Pressure Safety Injection Sys Reliability,1987-1997 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209F6111999-07-12012 July 1999 Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196J5661999-07-0101 July 1999 Notification of 990714 Meeting with OPPD & CE in Rockville, Maryland to Discuss Staff Concerns with OPPD PTLR Submittal & CEOG Topical Rept CE NPSD-683 ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20196F7641999-06-23023 June 1999 Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment ML20196B5291999-06-15015 June 1999 Notification of Significant Licensee Meeting with Util on 990715 Re Introduction of New Members of Midamerican Energy Co Senior Mgt to NRC Region IV Managers ML20195H6031999-06-11011 June 1999 Forwards Exam Repts 50-361/99-301 & 50-362/99-301 Administered at Facility on 990416,with as Given Written Exam Attached ML20195H7251999-06-11011 June 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam,Submittal for Retake Exam Administered on 990416 ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20207F1141999-06-0404 June 1999 Notification of Significant Licensee Meeting with Util on 990628 to Discuss Emergency Preparedness Program Status & Planned Changes ML20207G4241999-06-0202 June 1999 Notification of 990630 Meeting with Util in Fort Calhoun, Nebraska to Discuss Miscellaneous Management Topics & Plant Status ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207D3251999-05-28028 May 1999 Notification of 990617 Meeting with Util in Blair,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Fort Calhoun Station ML20207E6241999-05-28028 May 1999 Notification of 990622 Meeting with Util in Auburn,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Cooper Nuclear Station ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205Q4491999-04-19019 April 1999 Forwards Viewgraphs of 990419 Telcon Re SG Eddy Current Insp Results Obtained During Imminent Refueling Outage ML20205R6021999-04-16016 April 1999 Notification of 990506 Mgt Meeting with Util in Arlington,Tx to Discuss Rev 3 to Cooper Engineering Improvement Strategy & Implementation of Cooper C/A Program ML20205N8821999-04-15015 April 1999 Forwards Questions Transmitted by Fax on 990415 to J Rainsberry of SCE & Request for Conference Call to Be Scheduled with Staff to Discuss SG Eddy Current Insp Results Obtained During Imminent Refueling Outage ML20205N5991999-04-14014 April 1999 Forwards Questions That Were Transmitted by Fax on 990414 to J Rainsberry of Southern California Corp,In Preparation for Upcoming Telcon on Recirculation Signal/Emergency Feedwater Actuation Signal While Channel in Tripped Condition ML20205M0111999-04-13013 April 1999 Forwards Questions to Be Discussed in Upcoming Telcon on GL 95-07.Questions Transmitted by Fax on 990413 to J Rrainsberry of SCE ML20205N1741999-04-12012 April 1999 Notification of Revised Licensee Meeting with Util on 990419 to Discuss Results of PPR Completed 990211.New Location of Meeting Will Be in Visiting Inspector room,2nd Floor at Fort Calhoun Station,Admin Bldg,Fort Calhoun,Ne 1999-09-24
[Table view] |
Text
.
9 .
.p# "%g UNITED STATES y t NUCLEAR REGULATORY COMMISSION l 5 f REGloN IV
[ 611 RYAN PLAZA DRIVE, sulTE 400 gj ARUNGToN, TEXAS 76011-8064 AUG 2 7 1999 NOTICE OF SIGNIFICANT MEETING THIS WORKSHOP IS OPEN TO THE PUBLIC Name of Licensee: Arizona Public Service Company Energy Northwest Entergy Operations, Inc.
Nebraska Public Power District Omaha Public Power District Pacific Gas and Electric Company STP Nuclear Operating Company Southern California Edison Company TU Electric Union Electric Company Wolf Creek Nuclear Operating Corporation Date and Time September 16,1999 - 9:30 a.m. to 5:30 p.m.
of Meeting: September 17,1999 - 7:45 a.m. to 2:00 p.m.
Location of Meeting: Wyndham Hotel (formerly the Arlington Marriott) 1500 Convention Center Dr. East Arlington,TX 76011 (817) 261-8200 Purpose of Meeting: The American Nuclear Society, in conjunction with the NRC, will conduct a Utility-NRC Interface Workshop in Arlington, Texas, on September 16-17,1999. The purpose of this workshop is to improve the utility and NRC understanding of industry and regulatory perspectives on current issues. The workshop will provide an environment for candid discussion and exchange of ideas and concerns through working group sessions in the areas of: (1) regulatory interface during events, (2) inspection reports and inspection impact, (3) the NRC enforcement policy, (4) baseline inspection program pilot program experience, (5) application of risk insights in plant operations, and (6) senior executive management interactions with NRC. The broader I aspects of regulatory interface issues will be discussed in keynote presentations by Greta J. Dieus, Chairman, USNRC; William Cottle, President and CEO, South Texas Project; and Sam Collins, Director, Office of Nuclear Reactor Regulation, USNRC. The General Co-Chairmen for the workshop are Ellis Merschoff, Regional Administrator, Region IV, and William Cottle of South Texas Project. The workshop is open for public observation.
~
9909020090 990827 PDR ADOCK 05000206 P PDR L
' s All Region IV Licensees NRC Attendees: Greta J. Dicus, Chairman, NRC Frank Miraglia, Deputy Executive Director for Reactor Programs Sam Collins, Director, Office of Nuclear Reactor Regulation Ellis Merschoff, Regional Administrator, NRC Region IV Other NRC staff from Region IV and Headquarters Licensee Attendees: . William Cottle, President and Chief Executive Officer, South Texas Project Earl Nye, President and Chief Executive Officer, TXU Electric Other Region IV utility representatiws NOTE: Please contact me at (817) 860-8226 (e-mail:-TPG @ NRC.aov). if you have any questions regarding this worksh
. Approved -
. (As '
/.
Thomas P. G n /
Deputy Regiona in strator
All Region IV Licen ees cc:
C. Randy Hutchinson, Vice President Otto L. Maynard, President and Operations Chief Executive Officer Arlansas Nuclear One Wolf Creek Nuclear Operating Corporation J. H. Swailes, Vice President of Mr. J. V. Parrish (Mail Drop 1023)
Nuclear Energy Chief Executive Officer Nebraska Public Power District Energy Northwest Mr. C. L. Terry, Sr. VP & Executive Vice President Principal Nuclear Officer & Chief Operating Officer TU Electric Entergy Operations, Inc.
Gany L. Randolph, Vice President and Vice President Chief Nuclear Officer Operations Support Union Electric Company Entergy Operations, Inc.
Gregory M. Rueger, Senior Vice President Manager, Washington Nuclear Operations and General Manager ABB Combustion Engineering Nuc Power Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company County Judge of Pope County Russellville, Arkansas S. K. Gambhir, Division Manager Nuclear Operations David D. Sne!Iings, Jr., Director Omaha Public Power District Arkansas Div Radiation Control and Emergency Management William A. Eaton, Vice President Operations Arkansas Department of Health Entergy Operations, Inc.
Manager Gregg R. Overbeck, Senior Vice Framatome Technologies President, Nuclear Rockville, Maryland Arizona Public Service Company OES Coordinator ,
Randal K. Edington, Vice President, Pope County Operations Russellville, Arkansas Entergy Operations, Inc.
ES Coordinator Harold B. Ray, Executive Vice President Yell County Courthouse Southern Califomia Edison Co. Dardenelle, Arkansas William T. Cottle, President and ES Coordinator Chief Executive Officer Johnson County OES STP Nuclear Operating Company Clarksville, Arkansas Charles M. Dugger, Vice President ES Coordinator Operations - Waterford 3 Logan County OES Entergy Operations, Inc. Paris, Arkansas J
All Region IV Licensees 1
)
ES Coordinator G. R. Horn, Senior Vice President Conway County of Energy Supply Morriiton, Arkansas Nebraska Public Power District Mayor, City of Danville John R. McPhail, General Counsel Danville, Arkansas Nebraska Public Power District Mayor, City of Paris B. L. Houston, Nuclear Licensing Paris, Arkansas and Safety Manager Nebraska Public Power District Mayor, City of Clarksville Clarksville, Arkansas Dr. William D. Leech ;
MidAmerican Energy Mayor, City of Dardanelle -
Dardanelle, Arkansas Mr. Ron Stoddard Lincoln Electric System Mayor, City of Dover Dover, Arkansas Michael J. Linder, Director NE Department of Environmental Quality Mayor, City of Atkins Atkins, Arkansas Chairman Nemaha County Board of Commissioners Mayor, City of Russellville Auburn, Nebraska Russellville, Arkansas Cheryl K. Rogers, Program Manager Mayor, City of London Nebraska Health & Human Sevics System London, Arkansas R. A. Kucera, Director Mayor, City of Morriiton of Intergovernmental Cooperation Morrilton, Arkansas Missouri Department of Natural Resources Judge, Yell County Jerry Uhlmann, Director Danville, Arkansas Missouri State Emergency Mgmnt Agency County Judge Vick L. Cooper, Chief Morrilton, Arkansas Kansas Department of Health and Environment County Judge Clarksville, Arkansas Presiding Commissioner Atchison County County Judge Rock Port, Missouri Paris, Arkansas Sheriff Federal Emergency Management Agency Atchison County Sheriff's Office R. L. ' Buddy" Young, Regional Director Rock Port, Missouri Region IV, Federal Center Sheriff ;
Auburn. Nebraska I
)
All Region IV Licensees Robert Leopold Public Utility Commission Nebraska Health and Human Services Austin, Texas Daniel K. McGhee Professional Nuclear Consulting, Inc.
Iowa Department of Public Health Derwood, Maryland Gary McNutt, Deputy Director, John O'Neill, Esq.
Missouri Radiation Control Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Roger D. Walker Washington, D.C.
TU Electric H. D. Bono, Supervising Engineer Juanita Ellis Quality Assurance Regulatory Support President - CASE Union Electric Company George L. Edgar, Esq. Manager- Electric Department Morgan, Lewis & Bockius Missouri Public Service Commission Washington, D.C. Jefferson City, Missouri G. R. Bynog, Program Manager / Dan 1. Bolef, President Chief Inspector Kay Drey, Representative Texas Dept of Licensing & Regulation Board of Directors Coalition for the Environment County Judge University City, Missouri Glen Rose, Texas Lee Fritz, Presiding Commissioner Chief, Bureau of Radiation Control Callaway County Court House Texas Department of Health Fulton, Missouri John L. Howard, Director Alan C. Passwater, Manager l Environmental & Natural Resources Policy Licensing and Fuels Office of the Governor AmerenUE St. Louis, Missouri Sheriff Glen Rose, Texas J. V. Laux, Manager, QA ,
Union Electric Company i Mayor of Glen Rose Glen Rose, Texas Mayor of Chamois Chamois, Missouri
- The Honorable Don Cleveland Granbury, Texas Presiding Commissioner Linn, Missouri R. L. Jeanis Granbury, Texas ' Emergency Preparedness Coordinator Mayor Linn, Missouri Granbury, Texas
m All Region IV Licensees Osage County Sheriff Mayorof Rhineland Linn, Missouri Rhineland, Missouri Public Administrator Assistant Emergency Director Chamois, Missouri Rhineland, Missouri Emergency Preparedness Eastern Associate Commissioner Coordinator Fulton, Missouri Fulton, Missouri Western Associate Commissioner Callaway County Sheriff Fulton, Missouri Fulton, Missouri Dr. Richard Ferguson Presiding Commissioner -
Sierra Club California Montgomery City, Missouri Nancy Culver Director of Emergency Services San Luis Obispo Mothers for Peace Montgomery City, Missouri Chairman {
Montgomery County Sheriff San Luis Obispo County Board of Montgomery City, Missouri Supervisors Presiding Commissioner Truman Burns \Mr. Robert Kinosian {
Hermann, Missouri California Public Utilities Commission Emergency Preparedness Coordinator Robert R. Wellington, Esq.
Hermann, Missouri Legal Counsel Diablo Canyon Independent Safety Cmte Gasconade County Sheriff Hermann, Missouri Steve Hsu Radiologic Health Branch .
Gasconade County Public Administrator CA State Department of Health Services Owensville, Missouri Christopher J. Warner, Esq. i Mayor of Fulton Pacific Gas and Electric Company l Fulton, Missouri David H. Oatley, Vice President Chief of Police Diablo Canyon Operations and Plant Fulton, Missouri Managing Editor Fulton City Administrator Telegram-Tribune Fulton, Missouri San Luis Obispo, California l Mayor, City of Morrison County Administrative Officer ;
Morrison, Missouri San Luis Obispo County Board of Supervisors Mayor, City of Mokane Mokane, Missouri l
All Region IV Licensees Robert A. Laurie, Commissioner Emergency Management Coordinator California Energy Commission Pottawattamie County Council Bluffs, Iowa Ed Bailey, Chief State Department of Health Services Chairman, Pottawattamie County Board of Supervisors Mark T. Frans, Manager Council Bluffs, Iowa Omaha Public Power District Civil Defense Director James W. Chase Blair, Nebraska Fort Calhoun Station Sheriff J. M. Solymossy, Manager - Fort Calhoun Washington County Courthouse Station -
Blair, Nebraska i Omaha Public Power District -
President !
Perry D. Robinson, Esq. Blair City Council Winston & Strawn Blair, Nebraska l
Chairman Mayor, City of Blair Washington County Board of Supervisors Blair, Nebraska '
Blair, Nebraska Mayor, City of Fort Calhoun )
Sheriff Fort Calhoun, Nebraska Douglas County, Omaha, Nebraska l
President )
Chairman Fort Calhoun City Council ;
Douglas County Board of Commissioners Fort Calhoun, Nebraska Omaha, Nebraska l Civil Defense Director l Director Region 5/6 Douglas County E M Fremont, Nebraska Omaha, Nebraska John A. Miller, Regional Director Civil Defense Director FEMA, Region Vil Logan, Iowa Chief, Bureau of Energy Efficiency, Sheriff Auditing, and Research Harrison County, Logan, Iowa lowa Department of Commerce Chairman, Harrison County Board of Donald A. Flater, Chief Supervsiors lowa Department of Public Health Logan, Iowa Wise, Carter, Child & Caraway Mayor, City of Missouri Valley Jackson, Mississippi 39205 Missouri Valley, Iowa
All Region IV Licensees ~ Sam Mabry, Director Vice President, District 4 Mississippi Department of Natural Claibome County Board Resources of Supervisors Jackson, Mississippi Hermanville, Mississippi President, District 1 Claiborne County Tax Claiborne County Board of Supervisors Assesson/ Collector Port Gibson, Mississippi Port Gibson, Mississippi General Manager Director Grand Gulf Nuclear Station Port Gibson/Claibome County Entergy Operations, Inc. Civil Defense Council Port Gibson, Mississippi The Honorable Richard Leyoub Attomey General Claiborne County Election State of Louisiana Commissioner, District 1 Lorman, Mississippi Office of the Governor State of Mississippi Mayor Jackson, Mississippi . Town of Port Gibson Port Gibson, Mississippi Mike Moore, Attorney General Frank Spencer, Asst. Attorney General James E. Maher, Director State of Mississippi Mississippi Emergency Mgmnt Agency Jackson, Mississippi Dr. F. E. Thompson, Jr.
State Board of Health Mayor Jackson, Mississippi City of St. Joseph St. Joseph, Louisiana Robert W. Goff, Program Director Mississippi Dept. of Health Edwin Preis, Mayor Jackson, Mississippi City of Newellton Newellton, Louisiana Director, Nuclear Safety and Regulatory Affairs Rick Foster, Director Entergy Operations, Inc. Tensas Office of Emergency Preparedness St. Joseph, Louisiana Vice President, Operations Entergy Operations, Inc. Ronald Wascom, Administrator Department of Environmental Quality Supervisor, District 2 Baton Rouge, Louisiana Claiborne County Port Gibson, Mississippi Federal Emergency Management Agency, Region IV Supervisor, District 5 - Atlanta, Georgia Claiborne County Port Gibson, Mississippi
l All Region IV Ucensees Steve Olea Director- Nuclear Safety Arizona Corporation Commission Entergy Operations, Inc.
Douglas K. Porter, Senior Counsel Wise, Carter, Child & Caraway Southern California Edison Company Jackson, Mississippi l Chairman Mark J. Wetterhahn, Esq. i Maricopa County Board of Supervisors Winston & Strawn I Phoenix, Arizona Washington, D.C.
Aubrey V. Godwin, Director Manager - Licensing ;
Arizona Radiation Regulatory Agency Entergy Operations, Inc. '
Phoenix, Arizona H. Anne Plettinger s Angela K. Krainik, Director Baton Rouge, Louisiana Regulatory Affairs Arizona Public Service Company President West Feliciana Parish Police Jury John C. Horne, Vice President, St. Francisville, Louisiana Power Generation El Paso Electric Company President Pointe Coupe Parish Police Jury Terry Bassham, Esq. New Roads, Louisiana General Counsel El Paso Electric Company President East Feliciana Parish Police Jury John W. Schumann Clinton, Louisiana Southern California Public Power Authority )
Parish President David Summers West Baton Rouge Parish Counsel Public Service Company of New Mexico Port Allen, Louisiana Jarlath Curran Mayor-President Southern California Edison Company Office of the Mayor-President Baton Rouge, Louisiana Robert Henry Salt River Project Chairman, Board of Supervisors Scottsdale, Arizona San Diego, California Harry E. Border Alan R. Watts, Esq.
State of Arizona Woodruff, Spradlin & Smart Orange, Califomia General Manager River Bend Station Sherwin Harris, Resource Project Manager St. Francisville, Louisiana Public Utilities Department i Riverside, California '
All Region IV Licensees R. W. Krieger, Vice President D. G. Tees /R. L. Balcom Southem California Edison Company Houston Lighting & Power Company Stephen A. Woods, Senior Health Physicist Jon C. Wood California Department of Health Services Matthews & Branscomb San Antonio, Texas Michael R. Olson San Diego Gas & Electric Company Jack R. Newman, Esq.
Morgan, Lewis & Bockius Mayor Washington, D.C.
San Clemente, California G. E. Vaughn/C. A. Johnson Chief Administrator Central Power & Light Company San Diego County .
San Diego, California INPO Atlanta, Georgia Mayor San Juan Capistrano, California Judge, MataDorda County Bay City, Texas City Manager San Juan Capistrano, California Mayor, City of Bay City Bay City, Texas City Manager San Clemente, Califomia Mayor, City of Palacios Palacios, Texas Mayor Dana Point, California James Mitchell, Sheriff Matagorda County City Manager Bay City, Texas Dana Point, Califomia General Manager, Plant Operations T. H. Cloninger, Vice President Entergy Operations, Inc.
Engineering & Technical Services STP Nuclear Operating Company Manager - Licensing Manager J Entergy Operations, Inc.
S. M. Head, Supervisor, Licensing Quality & Licensing Department Chairman STP Nuclear Operating Company Louisiana Public Service Commission Wadsworth, Texas Director, Nuclear Safety & Regulatory A. Ramirez/C. M. Canady Affairs Electric Utility Department Entergy Operations, Inc.
Austin, Texas Parish President M. T. Hardt/W. C. Gunst St. Charles Parish City Public Service Board Hahnville, Louisiana San Antonio, Texas
All Region IV Licensees President Jay Silberg, Esq.
St. John the Baptist Shaw, Pittman, Potts & Trowbridge Laplace, Louisiana Washington. D.C.
Assistant Director Supervisor Licensing Office of Emergency Preparedness Wolf Creek Nuclear Operating Corp.
Baton Rouge, Louisiana Burlington, Kansas Chairman Chief Engineer Energy Facility Site Evaluation Council Utilities Division Olympia, Washington Kansas Corporation Commission Mr. Rodney L Webring Office of the Governor Vice President, Operations Support /PIO State of Kansas Energy Northwest Attorney General Mr. Greg O. Smith, VP, Generation Judicial Center Energy Northwest Topeka, Kansas Mr. D. W. Coleman, Mgr, Regulatory Affairs County Clerk Energy Northwest Burlington, Kansas Mr. Albert E. Mouncer, General Counsel Frank Moussa Energy Northwest Kansas Division of Emergency Preparedness Mr. Paul inserra, Manager, Licensing Energy Northwest Coffey County Commissioners Burlington, Kansas Bob Nichols Office of the Governor Coffey County Emergency Olympia, Washington Preparedness Coordinator Burlington, Kansas John L. Erickson, Director Division of Radiation Protection Mayor, City of Burlington Department of Health - Burlington, Kansas Olympia, Washington Mayor, City of LeRoy Max E. Benitz, Jr., Chairman LeRoy, Kansas Goard of Benton County Commissioners Prosser, Washington Mayor, City of New Strawn New Strawn, Kansas Sue Miller, Chair Board of Franklin County Comrnissioners Mayor, City of Waverly Pasco, Washington Waverly, Kansas Chief Operating Officer Wolf Creek Nuclear Operating Corp.
Burlington, Kansas
?
All Region IV Licensees . Sheriff -
Allen County Emergency Preparednesa Coordinator
' lola, Kansas Lyon County Emergency-Preparedness Coordinator ..
- Emporia, Kansas Anderson County Emergency
- Preparedness Coordinator Gamett, Kansas
All Region IV Licensees AUG 27 1999 bec:
DMB (IE 45)
OEDO RIV Coordinator (16E15)
ORA File RIV File E-Mail To:
- ( ) NRC Auendees PMNS Mtg Announcement Coordinator PAB DEDR FJM A/D/NRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR
()
OEMAll All Project Managers, NRR D/OE SEB1 S. Bogle
()
CAH All Senior Resident inspectors C. Hackney, RSLO GFS G. Sanborn, EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAO, DLF, LJB1 DRP Division CLG, LMB,NLH DRS Division CMS, JAK, NSL DNMS Division PDP Dean Papa LPL P.Longdo i
DOCUMENT NAME: R:\ANS9-99MN.TSS To receive copy of document, Indicate in box: *C" = Copy without enclosures *E' = Copy with enclosures *N' = No copy ,
RIV:C:DRP/TSS D:DRP* PAO $ RSLO % ORA P' j LAYandell KEBrockman BWHenderson CAHiickney TPGwynn i T i 8/)er/99 W 8/23/99 8/ $/99 8A 699 8/ 4 /99
- previously conc arred OFFICIAL RECORD COPY l
PREVOUSCONCURRENCEPAGE All Region IV Licensees bec:
DMB (IE 45)
OEDO RIV Coordinator (16E15)
ORA File RIV File E-Mail To:
() NRC Auendees PMNS Mtg Announcement Coordinator PAB DEDR FJM A/D/NRR BWS . Acting, ADT/NRR BAB2 Acting ADP/NRR .
()
OEMAIL Project Manager, NRR -
D/OE SEB1 S. Bogle
( ). Resident inspector CAH C. Hackney, RSLO GFS G. Sanborn, EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT, DLF, LJB1 DRP Division CLG, LMB, NLH DRS Division CMS, JAK, NSL DNMS Division PDP Dean Papa LPL- P.Longdo DOCUMENTNAME: R:\ANS9-99MN.TSS To reoolve copy of document, Indicate in box: *c" = Copy without enclosures *E' = Copy w'th enclosures 'N" = No copy RIV:C:DRP/TSS D.DRP _ - PAO RSLO DRA LAYandell KEBrockrnaff/ / ) BWHenderson CAHackney TPGwynn 8/9999 F] 8/!N99 8/ /99 8/ /99 8/ /99
/ OFFICIAL RECORD COPY
. ?.
All Region IV Licensees ggg271999 bec:
MW85Ib OEDO RIV Coordinator (16E15)
ORA File RIV File E-Mail To:
() NRC Auendees PMNS Mtg Announcement Coordinator PAB DEDR FJM A/D/NRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR
() All Project Managers, NRR OEMAll D/OE SEB1 S. Bogle
()
CAH All Senior Resident inspectors C. Hackney, RSLO GFS G. Sanborn, EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAO, DLF, LJB1 DRP Division CLG, LMB, NLH DRS Division CMS, JAK, NSL DNMS Division PDP Dean Papa LPL P.Longdo DOCUMENT NAME: R:\ANS9-99MN.TSS To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C:DRP/TSS D:DRP* PAO $_ RSLO % DRA F_
LAYandel( KEBrockman BWHenderson CAHackney TPGwynn / I 8@/99 W 8/23/99 8/ $/99 BA 699 8/ 8 /99
- previously concJrred OFFICIAL RECORD COPY j
- r. -%5