ML20151R994

From kanterella
Revision as of 23:12, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-498/88-20 & 50-499/88-20 on 880321-25.No Violations or Deviations Noted
ML20151R994
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/21/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20151R998 List:
References
NUDOCS 8804280148
Download: ML20151R994 (2)


See also: IR 05000498/1988020

Text

.

_ _ .

-

.

J ..

'

[ [,' .

In Reply Refer To:

Dockets: 50-498/88-20

50-499/88-20

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President,- Nuclear

P.O. Box 1700

Houston, Texas 77001

!

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. Kelley, T. O. McKernon,

and accompanying NRC personnel of this office during the period March 21-25,

1988, of activities authorized by NRC Operating License NPF-71 and Construction

Permit CPPR-129 for the South Texas Project, Units 1 and 2, and to the

discussion of our findings with Mr. G. L. Parkey and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspecti9n included followup on previoue inspection

findings, review of preoperational test procedures, review of elet,trical

l

construction procedures, and rniew of coroleted electrical construction work,

i Within these areas, the inspection consisted of selective examination of

l procedures and representative records, interviews with personnel, and

! otsarvations by the NRC inspectors. The inspection findings are documented in

l the enclosed inspection report.

During this inspection, no violations or deviations were identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

l Original Signed By

1 B. Beach

L. J. Callan, Director

Division of Reactor Projects

!

'

Enclosure:

Appendix - NRC Inspection Report

50-498/88-20

50-499/88-20

cc w/ enclosure: (seenextpage)

l

  • previously concurred jh

p

  • RIV:TPS:RI *RI *

C:TPS *D:DRS *C:PSD D: [Reconcur

DLKelley/tw TOMcKernon WC$eidle JLMilhoan GLConstable LJ anhCSoidle

/ /88 / /88 / /88 / /88 / /88 q/fD/88 '/d /88

870428014e 880421 Ik

i

PDR ADOCK 05000498

O DCD

,

I

, m.-, -- . y-.-, ., ,

, .

-

-

, ,

.

-Houston Lighting & Power Company -2-

cc w/er. closure:

Houston Lighting & Power Company

ATTN: M. A. McBurnett, Manager

Operations Support Licensing '

P.O. Box 289

Wadsworth, Texas 77483

Pouston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700

Houston, Texas 77001

'

Houston Lighting & Power Company

ATTN: S. L. Rosen

i P.O. Box 289

Wadsworth, Texas 77483

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P,0. Box 2121

! Corpus Christi Texas 78403

c.ity Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

, City of Austin ilectric Utility

l ATTN: R. J. Miner, Chief Operating

l Officer

721 Barton Springs Road

Austin, Texas 78704 i

,

Texas Radiation Control Program Director

bec to DMB (1601) i

bec distrib by RIV: I

  • DRP *RRI-0PS

R. D. Martin, RA *DRS

  • Section Chief (DRP/D) *RPSB-DRSS
  • MIS System *RIV File j

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *D. Hunnicutt

  • P. Xadambi, NRR Project Manager *TSS

D. Powers *D. Kelley i

W. C. Seidle *J. Clausner

  • W. Hodges, NRR Project
  • T. McKernon

l *w/766

I