Requests Ref Matl Listed in Encl for Operator/Senior Operator Licensing Exams,By 860522,in Order to Meet Schedule.Exams Scheduled for Wk of 860623.List of Exam Requirements Also Encl
ML20154K808
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/06/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
References
NUDOCS 8603110319
Download: ML20154K808 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ .

e e MAR 00'1M6 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. D. C. Hintz Manager Nuclear Power Post Office Box 19002 Green Bay, WI 54307-9002

Dear Mr. Hintz:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. R.Zube, Kewaunee Simulator Supervisor, and Mr. T. Reidinger, Operator Licensing Examiner, arrangen;ents were made for the administration of examinations at the Kewaunee Nuclear Pcwer Plant.

The written and oral examinations are scheduled for the week of June 23, 1986.

In order for us to meet this schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1 " Reference Material Requirements for Operator / Senior Operator Licensing Examinations" by May 22, 1986. Any delay in receiving this material will result in a delay in administering the examinations. Our examinations are scheduled far in advance with considerable planning to best utilize our limited examiner manpower and to meet the examination dates requested by the various facilities.

Therefore, missing the May 22, 1986, deadline, even by a few days, will likely result in a long delay since it may not be possible to reschedule examinations at other facilities. Mr. R. Zube has been advised of our reference material requirements, the number of reference material sets that are required, and the r.xaminers' names and addresses where each set is to be mailed.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written exatinations. Enclosure 2,

! " Administration of Operator / Senior Operator. Licensing Written Examinations,"

describes our requirements for conducting these examinations. Mr. R. Zube has also been informed of these requirements.

I All operator and senior license applications should normally be submitted at least 60 days prior to the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has been determined. If the applications are not received at least 30 days prior to the examination dates it is likely that a postponement will be necessery.

i PDR ADOCM O m se0311o319 860306 POR v i t ggp

Wisconsin Public Service 2 W 0 610%

Corporation This request for information was approved by the Office of Menagement and Budget under Clearance Number 3150-0101, which expires June 30, 1986. >

Coninents on burden and duplication may be directed to the Office of Management  !

and Budget, Reports Management Room 3208, New Executive Office Building, l

l Washington, D.C. 20503. l Thank you for your consideration in this matter. If you have any questions  !

regarding the examination procedures and requirements, please contact l Mr. T. Burdick at 312-790-5559.

Sincerely. l

\;

ORIGINAL SIGNED BY LUIS A. REYES  !

[

l Luis A. Reyes, Chief J l

l Operations Branch l l Enclosures

  • i 1. Reference Material Requirements i
for Operator / Senior Operator l

' Licensing Examination i

[ 2. Administration of Operator l Licensing Written i Examinations cc w/ enclosures:

C. R. Steinhardt, P'..nt Manager ,

F. Stanaszak, Plant g Trainin DCS/RSB(gManager RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Jchn J. Duffy, Chief i Boiler Section Ness Flores, Chairperson Wisconsin Public Service Coninission

! cc w/o enclosures:

f M. B. Fairtile, Project L- Manager, NRR B. Boger, Branch Chief, OLB

]

l RIII RII RI I  ;

7M Reidinger/mab 4cMi len ey 03/06/86 6 e _ ._ _ . _ _ . . - . . . -

ENCLOSURE 1 Reference Material Requirements for Operator / Senior Operator Licensing Examinations Note: Ry uired Material is indicated by an "X" opp,o, site the item.

_X_ 1. Procedure Index (alphabetical by subject)

X 2. All administrative Procedures (as applicable to reactor operation orsafety)

_X_ 3. All Integrated Plant Procedures. (Normal or General Operating Procedures)

_X_ 4. Emergency Procedures (Emergency Instructions, Abnormal .or Special Procedures)

_X_ 5. Standing Orders (Important orders which are safety related and may supersede the regular procedures)

X 6. Fuel Handling and Core Loading Procedures, (Initial Core Loading Procedure,whenappropriate)

_X_ 7. AnnunciatorProcedures(alarmprocedures,includingsetpoints)

_X_ 8. Radiation Protection Manual (Radiation Control Manual or Procedures)

_X_ 9. Emergency Plan Implementing Procedures

_X _ 10. Technical Specifications (up to date)

-~

X 11. Lesson Plans (Training Manuals, Plant Orientation Manual, System Descriptions, Reactor Theory, Thermodynamics, etc.)

_X_ 12. System Operating Procedures

_X_ 13. Piping and Instrumentation Diagree , electrical single line diagrams. or flow diagrans

> _X_ 14. Technical Data Book, and/or plant curve information as used by

[ operators X 15. Questions and Answers that Licensee has prepared (Voluntary by j Licensee)

! X 16. Malfunction and Initial Condition Material for Simulator (if f applicable)

X 17. List of Training Simulator Scenarios utilized by the June 1986 Class

_X_ 18. LERs - 1986, Night Order Book, Standing Orders, EN L __

1 2

All of the above reference material should be approved, final issues, and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable except for cold license examinations. All procedures and reference material should be bound or in the form as used by the control room operators, with appropriate indexes or tables of contents so that they can be used efficiently. 1 If a cold-license plant has not finalized some of the material, the chief examiner is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.

1 I

l l

ENCLOSURE 2 Administration of Reactor / Senior Reactor Operator Licensing Written Examinaticns Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure exam integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, nodels, and/or other training materials shall be present in the examination room.
3. Suitable arrangements are to be made by the facility if the candidates are to have lunch, coffee, etc. These arrangements shall comply with Item 1 above. These arrangements will be reviewed by the examiner and/or proctor.
4. A copy of the written examination and answer key shall be given to the utility training department after the last candidate has turned in his completed examination. The utility will then have until the end of the exam week to provide coments and supporting docunentation to suggest changes or corrections to the examination and answer key. The utility may provide these comments in writing to the Chief Examiner before he leaves the site or forward them to the Operator Licensing Section Chief in the appropriate regional office.
5. The licensee will provide pads of 8-1/2 x 11" lined paper in uncpened packages for each candidate's use in completing the examination. The exaniner will distribute these pads to the candidutes. All reference raterial needed to conplete the examination will be furnished by the examincr. Candidates can bring pens, pencils, calculators or slide rules into the examination room and no other equipment or reference material is allowed.
6. Only black ink or dark pencils should be used for writing answers to questions.