ML20126E091
ML20126E091 | |
Person / Time | |
---|---|
Site: | Davis Besse, Palisades, Big Rock Point File:Consumers Energy icon.png |
Issue date: | 05/16/1974 |
From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Youngdahl R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML20126E096 | List: |
References | |
NUDOCS 8101100850 | |
Download: ML20126E091 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20058H6411990-11-0909 November 1990
[Table view]Forwards Final SALP Rept 50-346/90-01 Covering Mar 1989 to June 1990 ML20058G8921990-11-0707 November 1990 Forwards Insp Repts 50-155/90-20 & 50-255/90-20 on 900925-28 & 1015-19.Violations Noted ML20058G2461990-11-0202 November 1990 Forwards Safety Insp Rept 50-155/90-17 on 900904-1015 & Notice of Violation ML20058F7331990-10-31031 October 1990 Forwards List of Unimplemented Gsis,Per Generic Ltr 90-04 ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant ML20058D6771990-10-25025 October 1990 Forwards Exemption Request for Reactor Operators Selected for NRC Requalification Exam ML20058F4811990-10-24024 October 1990 Forwards Safety Insp Rept 50-346/90-16 on 900814-1009.No Violations Noted ML20058A7671990-10-22022 October 1990 Advises That Review of 900816 Response to NRC Bulletin 90-001 Re Loss of Fill Oil in Rosemount Transmitter Ongoing ML20062C6811990-10-18018 October 1990 Forwards Safeguards Insp Rept 50-346/90-19 on 900924-28.No Violations Noted ML20059N6661990-10-0909 October 1990 Forwards Correction to SER Re Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements.W/O Encl ML20059N0081990-09-28028 September 1990 Forwards Insp Rept 50-155/90-10 on 900723-27 & 0806-10 & Notice of Violation IR 05000346/19900091990-09-26026 September 1990 Forwards Insp Repts 50-346/90-09,50-346/90-12 & 50-346/90-13 on 900417-0717 & Notice of Violation ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059L4771990-09-18018 September 1990 Forwards Safety Insp Rept 50-155/90-13 on 900724-0903. Noncited Violation Noted ML20059L6041990-09-14014 September 1990 Confirms 901002 Meeting at Plant Site to Present Initial SALP 8 Rept for Facility ML20059J2511990-09-13013 September 1990 Forwards Safety Insp Rept 50-346/90-17 on 900827-31.No Violations Noted ML20059J3091990-09-10010 September 1990 Forwards Exemption from 10CFR55.45(b)(2)(ii) Re Use of Simulation Facility,Per 900404 Request.Util Request to Delay Submittal of Description of Performance Tests & Results Until 910526 Granted ML20059G1431990-09-0404 September 1990 Forwards Safety Insp Rept 50-346/90-15 on 900701-0813. Violation Noted But Not Cited.Util Implemented Corrective Actions as Result of Violation & Will Be Examined During Future NRC Insps ML20059G5461990-09-0404 September 1990 Discusses 900816 Site Visit Re Const Activities Requiring Security Force Compensatory Measures & Security Plan ML20059F2531990-08-31031 August 1990 Forwards Safety Evaluation Supporting Util 891229 Request to Dispose of Dredged Discharge Canal Sediment from Facility ML20059C6111990-08-27027 August 1990 Forwards Safety Insp Rept 50-155/90-15 on 900814-16.No Violations Noted ML20059B7771990-08-22022 August 1990 Advises That Util Commitment to Install Two New Recorders That Provide Containment Temp Indication on Front Panel During 1990 Refueling Outage,Acceptable ML20056B2701990-08-20020 August 1990 Forwards Safety Evaluation Granting 900710 Request for Relief from ASME Code for Class 3 Piping in Svc Water Sys. Request Granted Until Next Scheduled Outage Exceeding 30 Days But No Later than Dec 1991 ML20056B5191990-08-17017 August 1990 Forwards Final SALP Rept 50-155/90-01 & Revised Pages to SALP Rept.Overall Performance Did Not Decline,Per 900716 Meeting.Nrc Overstated Concern W/Radiological Controls Functional Area in Initial Rept & Cover Ltr ML20059A1661990-08-16016 August 1990 Forwards Safety Insp Rept 50-155/90-14 on 900730-0803.No Violations Noted ML20059A1741990-08-16016 August 1990 Informs That NRC NDE Mobile Lab Will Conduct Independent NDE Exams at Plant on 900924-1005.Selected Sys for Exam Listed on Encl ML20059A7571990-08-16016 August 1990 Advises That Response to Bulletin 90-001, Transmitters Mfg by Rosemount, Complete,Per ML20059A3721990-08-14014 August 1990 Ack Receipt of Informing NRC of Change in Completion Date Re on-the-job Training Procedure,Per LER 90-002 ML20059A6821990-08-13013 August 1990 Forwards Safety Insp Rept 50-346/90-09 on 900417-0717. Violations Noted But Not Cited.Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Action Based on Findings of Insp ML20059A6631990-08-10010 August 1990 Forwards Enforcement Conference Rept 50-346/90-14 on 900601 & 900717 Telcon Re Violations Noted in Insp Repts 50-346/90-09 & 50-346/90-12 ML20059A6721990-08-10010 August 1990 Forwards Safety Insp Rept 50-346/90-13 on 900605-30 & 0709. Violation Noted But Not Cited ML20059A7161990-08-0808 August 1990 Provides Comments on 900105 Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance. Util Should Provide Description of Methodology for Periodic Verification of motor-operated Valve Switch Settings ML20058N2211990-08-0707 August 1990 Forwards Safety Insp Rept 50-155/90-12 on 900612-0723.No Violations Noted ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML20055J2761990-07-24024 July 1990 Confirms 900731 Meeting in Region III Ofc to Discuss Util Response to Violation Re Instrumented Insp Techniques ML20055J4351990-07-23023 July 1990 Ack Receipt of 900702 Transmittal of Rev 26 to Physical Security Plan.Estimated Start & Completion Dates for Each Mod Project & Compensatory Measures Requested within 30 Days After Receipt of Ltr ML20055G7301990-07-20020 July 1990 Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation on 901018 & Wk of 901105 ML20055G6621990-07-20020 July 1990 Forwards Safety Insp Rept 50-346/90-10 on 900430-0518.No Violations Noted ML20055G2881990-07-16016 July 1990 Advises of fitness-for-duty Insp Scheduled for Wk of 900925- 28 at Plant.Written Policies & Procedures Will Be Reviewed as Part of Insp Process ML20055G3051990-07-13013 July 1990 Confirms 900718 Tour of Plant & Mgt Meeting to Discuss Sixth Refueling Outage & Other Items of Mutual Interest ML20055G5051990-07-11011 July 1990 Advises That 900511 Rev 95 to Chapters 2,5,6,7,8 & Apps D, M & P for Plant Emergency Plan Consistent w/10CFR50.54(q) & Acceptable.Position of on-call Technical Adviser Should Be Inserted in Table 1 of Chapter 5 ML20055F2271990-07-0606 July 1990 Forwards Physical Security Insp Rept 50-255/90-16 on 900618- 22 & 25.No Violations Identified ML20055F2231990-07-0606 July 1990 Ack Receipt of Containing Scope & Objectives for 1990 Emergency Plan Exercise Scheduled on 900919 ML20055F1661990-07-0606 July 1990 Forwards Initial SALP Rept 50-155/90-01 for Jan 1989 - Apr 1990,prior to 900716 Scheduled Meeting.Two Areas of Improvement & No Areas of Decline Identified Since Last SALP Rept ML20055D7011990-07-0202 July 1990 Confirms Plans Re 900716 Meeting W/Util in Charlevoix,Mi to Present Initial SALP 9 Rept for Plant 1990-09-04 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G0621999-06-0404 June 1999 Forwards Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513.Violations Identified & Licensee Being Provided Opportunity to Either Respond to Violations within 30 Days or Inform NRC That LER Rept Already Contain Info Requested ML20207D1151999-05-27027 May 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Reorganization,Division of Licensing Project Management Created ML20207B8161999-05-25025 May 1999 Confirms Discussion Between Members of Staffs to Have Mgt Meeting on 990608 in Oak Harbor,Oh to Discuss Recent Performance at Davis-Besse as Described in Plant Performance Review ML20207B3141999-05-24024 May 1999 Informs That in September 1998,Region III Received Revision 20 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Rev Submitted Under Provisions of 10CFR50.54(q) ML20206T0881999-05-18018 May 1999 Confirms 990517 Telcon Between Lindsey & M Bielby Re Arrangements Made for Administration of Licensing Exam at Facility for Week of 990913 ML20206N5311999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Aj Mendiola Will Be Section Chief for Davis-Besse Npp.Organization Chart Encl ML20206P0921999-05-0707 May 1999 Responds to Discussing Impact That Delays to Wesflex Sys Approval Would Have on Big Rock Point Decommissioning Cost & Schedule ML20206H2291999-05-0707 May 1999 Forwards Proposed Change to Plant,Unit 1,TS Bases Section 2.2.1, Limiting Safety Sys Settings - Reactor Protection Sys Instrumentation Setpoints - Rc Pressure - Low,High & Pressure Temp ML20206H1011999-05-0404 May 1999 Forwards Safety Evaluation for Exemption from Certain Physical Protection Requirements.Enclosure Contains Safeguards Info & Being Withheld ML20206E3721999-04-29029 April 1999 Informs That Based on Licensee Determinations That Changes in Rev 1 Do Not Decrease Effectiveness of Defueled EP & That Plan Continues to Meet Applicable Stds of 10CFR50.47(b) & Requirements of App E to Part 50,NRC Approval Not Required ML20206B8171999-04-27027 April 1999 Forwards Insp Rept 50-346/99-05 on 990405-09.No Violations Noted.Purpose of Insp Was to Examine on-line Maint Risk Assessment Program Recently Implemented in Response to Maint Work Control Weaknesses ML20206B7381999-04-26026 April 1999 Forwards Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted.Activities in Areas of Facility Mgt & Control,Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined ML20205E3471999-03-29029 March 1999 Informs That USNRC Granted Encl Exemption from Certain Requirements of 10CFR73,to Allow Implementation of Safeguards Contingency Plan Reflecting Permanent Shutdown & Defueled Condition of Brpnp in Response to ML20205G5681999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990202 to Develop Integrated Understanding of Safety Performance. Overall Performance of Plant Acceptable.Plant Issues Matrix & Insp Plan Encl ML20204F4611999-03-19019 March 1999 Forwards Insp Rept 50-155/99-01 on 990113-0225.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20207G1701999-03-0505 March 1999 Forwards Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted ML20207D4351999-02-25025 February 1999 Forwards Insp Rept 50-346/99-02 on 990202-05.No Violations Noted.Examples of Deficiencies with Station Procedures, Similar to Those Identified Through Staff self-assessments & in Previous NRC Insps,Were Noted IR 05000346/19960141999-02-17017 February 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/96-14 on 970225.Ack That Due to Plant Events,There Has Been Delay in Completion of C/As for Violation 50-346/96-14c ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203C8971999-02-0808 February 1999 Informs That NRR Contracted with PNNL to Evaluate Storage of Spent Fuel at Number of Decomissioning Nuclear Power Facilities.Forwards Request for Info Re Spent Fuel Storage at Big Rock NPP 1999-09-07 |
Text
l
\
l i
May 16, 1974
,/
Consuswrs Power Compsey pocket , 50 AYTN: R. C. Youngdahl Docke t .65 Executive Vice President i i
212 West Michissa Avenue Jackson, Michigan 49701 Gentlemen:
I I as enclosing for your information a copy of an anonymess letter we received relating to your Big Rock Point and Palisades reactors. Also included is a copy of a memorandum we have prepared for our file l concerning this anonymous letter. Copies of the letter and memorandum l l
are being placed in the ARC Public Docuneet Rows la Washington, D.C., l Charlevoix, Michigan and Kalamaseo, Michigan.
If you have say questions concerning this letter, pleast let me know. 1
)
Stacerely yours, l James c. Keppler l Kegional Director l Enclosures As stated f
bec: J. G. Davis, D/DF0 RO Files JIR Central Files PDE
, Local Pint l
1 l
l W/0 // O O 7 5'O /