ML20128K321

From kanterella
Revision as of 00:38, 8 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-302/85-21 on 850426-0524 & Notices of Violation & Deviation
ML20128K321
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/21/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20128K328 List:
References
NUDOCS 8507100542
Download: ML20128K321 (1)


See also: IR 05000302/1985021

Text

%, OMciaJ

,, e-

JUN 21 1985

.

Florida Power Corporation

ATTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. H-2

St. Petersburg, FL 33733

Gentlemen:

SUBJECT: REPORT N0. 50-302/85-21

On April 26 - May 24,1985, NRC inspected activities authorized by NRC Operating

License No. DPR-72 for your Crystal River facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments and other activities appeared to deviate from a commitment to the NRC. The

deviation, with pertinent references and elements to be included in your

response, is presented in the enclosed Hotice of Deviation.

The violation described in the enclosed Notice of Violation is similar to a

violation contained in a Notice of Violation sent to you with our letter dated

- April 11,1985, and is also similar to a violation described in NRC Inspection

Report No. 50-302/85-11 (but not cited) sent to you with our letter dated

April 23,1985. We note in your letter dated June 6,1985, that you have

responded to the Notice of Violation sent to you with our letter dated April 11,

1985 (violation 85-08-07) and that this response also addresses the violations

discussed in this report and in NRC Inspection Report No. 50-302/85-11. We are

presently evaluating this response, therefore, no additional response to this

violation is required.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

/S/~ David M. Verrell;

L Roger D. Walker, Director

Division of Reactor Projects

Enclosures: (See page 2)

\\

f 6 Of

l