PNO-II-85-080:on 850821,orderly Shutdown Directed by TVA Due to Independent Contractor Concerns That Documentation Inadequate for Environ Qualification of Electrical Equipment.State of Tn Informed
ML20134M418
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/21/1985
From: Verrelli D, Weise S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-85-080, PNO-II-85-80, NUDOCS 8509040115
Download: ML20134M418 (1)


..

i August 21, 1985 l

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-II-85-80 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or i l public interest significance. The information is as initially received without verifi-cation or evaluation, and is basically all that is known by the Region II staff on this date.

FACILITY: Tennessee Valley Authority Licensee Emergency Classification:

Sequoyah Units 1 and 2 Notification of Unusual Event

, Docket Nos. 50-327 and 50-328 Alert Soddy-Daisy, Tennessee Site Area Emergency General Emergency X Not Applicable

SUBJECT:

SHUTDOWN GREATER THAN 48 HOURS TVA's Manager of Power and Engineering informed the Regional Administrator today that he has directed the orderly shutdown of Sequoyah Units 1 and 2. He is taking this action as the result of an independent contractor's concerns that the documentation may be inadequate for environmental qualification of electrical equipment at all TVA sites, as well as concerns about certain technical issues. The Sequoyah units are currently the

, only TVA plants in operation.

Preliminary plans by TVA are for Sequoyah Unit 2 to be taken out of service today and to proceed to cold shutdown. Unit I will be taken out of service once Unit 2 is in a stable shutdown condition.

TVA plans to announce the shutdowns today. Region II is prepared to respond to inquiries.

The State of Tennessee has been informed.

This information is current as of 3:45 p.m. (EDT) today.

Contact:

S. Weise, RII 242-5535 D. M. Verre111, RII 242-5526 DISTRIBUTION: sf Phillips 4.$*EW4p Willste d'M H. Street 4 43 MNBBh MAIL:

Chairman Palladino ED0 NRR IE NMSS ADM:DMB Comm. Roberts PA OIA RES DOT: Trans Only Comm. Asselstine MPA AE00 Applicable State Comm. Bernthal ELD .

Comm. Zech Air Rights i'9 INPO4.gp_

SECY SP NSAC ACRS' CA 8 (ls Y *

.N I ([ 9.'O PDR Regions: SA N6: M i'*

Licensee: Tl95 (Reactor Licensees)

Applicable Resident Site 4

Ri*n P essa PNO-II-85-OOO PDR~

y 1 g-o(t

- . - _ _ - _ ..