[PRELIMINARYNOTIFICATIONOFEVENTORUNUSUALOCCURRENCEPNO-OSP-87-13 REVISED L
PER MR. KEPP ER 1This preliminary notification constitutes EARLY notice of events of POSSIBLE xh safety or pelipJ qtprest p,ignificance. The information is as initially i
received wi'thout Wriffellion or evaluation, and is basically all that is known d
by the Region 11 staff on this date.
. FACILITY: Tennessee Valley Authority Licensee Emergency Classification:
Sequoyah Unit 2 Notification of Unusual Event Docket No. 50-328 Alert Site Area Emergency General-Emergency X Not Applicable
SUBJECT:
NON NUCLEAR HEATUP OF SEQUOYAH UNIT 2 TVA has indicated to the Office of Special Projects (OSP) its desire to conduct a non-nuclear heat-up (to Modes 4 and 3 Hot Shutdown and Hot Standby) of Sequoyah Unit 2 before the restart of the plant. Although there is fuel in the core, this non-nuclear heatup would use the plant's Reactor Coolant Pumps as
-the source of heat. Accordingly, the reactor will remain _subcriti_ cal. This preliminary heatup would allow for the performance of required hot operational testing of both primary and secondary. plant systems, early identification of
" cold layup" related equipment problems, and would enable operations personnel to get familiar with hot cperations again. The plant would remain-hot for a specified period and then return to cold shutdown (Mode 5) to complete all remaining restart work. TVA is preparing to conduct valve lineups and is r
discussing'with the staff the work which must-be completed before heatup. The 0SP staff has informed TVA that it will require compliance with all applicable-1
-Technical Specifications during the heat-up unless appropriate exemptions are
.obtained. Also, the staff will require TVA to femally document the basis to
. justify their compliance with the TSs. The stari will issue an SER prior to-heatup; -The major issue delaying heatup-is the repair of about 90 pipe hangers.
TVA anticipates that this work will be completed by the end of November with-heatup in December.
~
g This PN is being issued for infomation purposes only.
Contact:
q I
1 J. Donohew. 492-7292 l
F. McCoy, 242-5525 l
DISTRIBUTION H 5treet MNBB Phillips LEW W111ste Mail Chaiman Zech IDU-NRR OSP NM55 XDRIDMB
- Conn. Roberts PA 01A RES D0T: Trans Only Comm. Asselstine MPA AEOD Applicable State Comm.:Bernthal ES NRF Conn. Carr OGC Air Rights INPO SECY NRR ACRS CA Regions:
R' Licensee:
]NN, (Reactor Licenses)
Applicable Pesident Site 97y10g49871113 PMO-OSP-87-013 PDR
_ _ _ _ _ _