PNO-OSP-87-005:on 870608,JG Keppler & Ofc of Special Projects Met W/Sa White & TVA Representatives Re Contents & Implementation of Independent Design Verification for Plant.Nrc & Contractor Will Perform Integrated Design Insp
ML20214W406
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/09/1987
From: Donohew J, Rotella T
NRC OFFICE OF SPECIAL PROJECTS
To:
References
PNO-OSP-87-005, PNO-OSP-87-5, NUDOCS 8706160008
Download: ML20214W406 (1)


Text

. . , - . - - .. . _ _ -

--______7

- PRELIMINARY NOTIFICATION OF EVENT OR-UNUSUAL: OCCURRENCE PNO-OSP-87-05 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Office of Special Projects on this date.

FACILITY: Licensee Emergency Classification:

Tennessee Valley Authority Notification of Unusual Event Sequoyah Units 1 & 2 Alert Docket Nos. 50-327/50-328 Site Area Emergency

. Soddy-Daisy, Tennessee General Emergency X Not Applicable

SUBJECT:

SUMMARY

OF HIGHLIGHTS OF MEETING BETWEEN NRC AND TVA REGARDING AN INDEPENDENT DESIGN VERIFICATION INSPECTION On June 8,1987, Mr. J. G. Keppler and the Office of Special Projects (0SP) staff met with Mr. S. A. White and.TVA representatives to discuss the contents and implementation of an independent design / construction verification for Sequoyah. The independent verification was the subject of a June 2,1987 letter to Mr. S. A. White from Mr. J. G. Keppler. The letter stated TVA engineering and design efforts to date have not included a vertical review through one or more safety systems that would include significant aspects of i the interactions and interfaces'throughout design, engineering, and construc-tion. Mr. Keppler indicated in the letter that an independent design / cons 1ruc-tion verification-of at least one safety system should be conducted to provide 4 additional assurance that all major design and construction problems have been identified and resolved prior to Sequoyah Unit 2 restart.

During the meeting, TVA asserted that a verification conducted by.its Engineering Assurance organization would provide the requisite degree of independence and could be conducted faster than if TVA was required to hire an independent contractor to perfonn the verification. However, Mr. Keppler

  • decided that the verification should be conducted by either an independent contractor or the NRC. Since TVA indicated.it was unable at that time to commit to hire a contractor, it was determined that the NRC with contractor assistance would perform an Integrated Design Inspection (IDI). The IDI will be conducted by the NRC on the Essential Raw Cooling Water System at Sequoyah Unit 2.

Also discussed during the meeting were the missing civil engineering calcula-tions. Mr. Keppler informed TVA that to the extent practical all 5,000 missing calculations should be regenerated prior to the restart of Sequoyah Unit 2.

This information is current as of 5:00 p.m. (EDT) on June 9, 1987.

Contact:

8706160000 870609 T. Rotella, 492-8199 PDR 18E J. Donohew, 492-7292 PNO-OSP-07-OO5 PDR 1

DISTRIBUTION:

H Street MNBB Phillips E/W Willste Mail Chairman Zech EFO- NRR 657 NMss AURTDM8 Com. Roberts PA OIA RES DOT: Trans Only Com. Asselstine MPA AE00 Applicable State Com. Bernthal ES NRR-Com. Carr 0GC Air Rights INP0 SECY NRR ACRS CA Regions:

fpli POR Licensee: '

.(ReactorLicenses)

-)

a k

' Applicable Resident Site  ;

_ . _ _ . __. - _. - - . . _ . ___ . - . .