Forwards Insp Rept 50-382/97-13 on 970602-04.Two Apparent Violations Identified & Being Considered for Escalated EA
ML20141A223
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/13/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20141A226 List:
References
50-382-97-13, EA-97-278, NUDOCS 9706200182
Download: ML20141A223 (5)


See also: IR 05000382/1997013

Text

P. .

' l

.

!p* LE!vg UNITE 3 STATES

$ ' *te NUCLEAR REGULATORY COMMISSION

j

'

$ $

  • e REGloN IV

O i

s

611 RYAN PLAZA DRIVE, SulTE 400

%*,,e*,o[ AR LINGTON. TEXAS 760118064

June 13, 1997

EA 97-278

Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

i

SUBJECT: NRC INSPECTION REPORT 50-382/97-13

Dear Mr. Dugger: 1

An NRC inspection was conducted June 2-6,1997, of activities associated with your

Waterford Steam Electric Station, Unit 3, reactor facility. The enclosed report presents

the scope and results of that inspection.

Based oa the results of this inspection, two apparent violations were identified and are i

1

bemg considered for escalated enforcement action in accordance with the " General

Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy),

NUREG-1600. The apparent violations discussed in the enclosed report are the failure to:

(1) maintain containment isolation valves operable in accordance with Technical

Specification.3.6.3, and (2) perform a safety evaluation to assess operating the plant in a

condition other than described in the Updated Final Safety Analysis Report. Accordingly,

no Notice of Violation is presently being issued for these inspection findings. In addition,

please be advised that the number and characterization of apparent violations described in

the enclosed inspection report may change as a result of further NRC review.

A predecisional enforcement conference to discuss these apparent violations has been

scheduled for 1:00 p.m. (CDT) on July 29,1997. The decision to hold a predecisional

enforcement conference does not mean that the NRC has determined that a violation has

occurred or that enforcement action will be taken. This conference is being held to obtain

information to enab;e the NRC to make an enforcement decision, such as a common

understanding of the facts, root causes, missed opportunities to identify the apparent

violation sooner, corrective actions, significance of the issues, and the need for lasting and

effective corrective action. In particular, we expect you to address information in your

licensing basis used to establish your position that these containment "olation valves do

not have a closed safety function in addition, this is an opportunity for you to point out

any errors in our inspection report and for you to provide any information concerning your

perspectives on. (1) the severity of the violations, (2) the application of the factors that

the NRC considers when it deterrnines the amount of a civil penalty that may be assessed

I!lllWil!llllillElllll!DilOHill (

gg62gg

G

gg2 ' '

-

_ _ . , __ _ - - - - - - - - - -

r, .

..

Entergy Operations, Inc. -2-

,

in accordance with Section VI.B.2 of the Enforcement Policy, and (3) any other application ,

of the Enforcement Policy to'this case, including the exercise of discretion in accordatice '

with Section Vll. l

You will be advised by separate correspondence of the resvits of our deliberations on this  ;

matter. No response regarding these apparent violations is required at this time.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter  ;

1

and its enclosure will be placed in the NRC Public Document Room (PDR).  !

,

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you. .

Sincerely,  !

%A Q ~

Thomas P. Gwynn, Director -

i

,

Division of Reactor Projects

Docket No.: 50-382

License No.: NPF-38

Enclosure: -

NRC Inspection Report

50-382/97-13

(

cc w/ enclosure: ,

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995 l

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205 i

r I

l

,

c- ,

.

l

.

. i

l

Entergy Operations, Inc. -3- i

i

General Manager, Plant Operations

Waterford 3 SES ,

Entergy Operations, Ir.c.

P.O. Box B l

,

Killona, Louisiana 70066  !

'

Manager - Licensing Manager

Waterford 3 SES .

Entergy Operations, Inc. i

P.O. Box B  :

'

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

t

Director, Nuclear Safety & '

Regulatory Affairs

Waterford 3 SES l

Entergy Operations, Inc.

P.O. Box B  !

Killona, Louisiana 70066  !

'

William H. Spell, Administrator .

Louisiana Radiation Protection Division

P.O. Box 8?.135

Baton Rouge, Louisiana 70884-2135

'

Parish President  !

'

St. Charles Parish

P.O. Box 302

Hahnville, Louisiana 70057

Mr. William A. Cross

Bethesda Licensing Office

3 Metro Center

Suite 610 .

Bethesda, Maryland 20814

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005 3502

., _ _ _ . . - - . - - - _ _ _ .

__

,

.

.

d *\

Entergy Operations, Inc. -4-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE0lli

bec distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB

Branch Chief (DRP/D) MIS System

Project Engineer (DRP/D) RIV File

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Enforcement Officer

Regional Counsel

J. Lieberman, OE (MS: 7-H5)

OE: EA File, (MS: 7-H5)

DOCUMENT NAME: R:\_WAT\WT713RP.GEW

To receive copy of document, indicate in box: "C" = Copy without n ures "E" = Copy with enclosures "N" = No copy

RIV:PE:DRP/D C:DRP/D D:DRP K

GEWerner PHHarrell TPGwynn F

6/ /97 6/ /97 6/$/97

'

OFFIC:AL 3ECORD COPY

sSW

,

06/16/97 08:48 R IU US tRC FTS 002

i i

I

$

i  !  !

. i

. jl l  !

'

'

i  !

Ebtergy Operations, Inc. -4-!

j i I

'

i

i  !

>

,

'

t

!

E Mail report to T. Boyce (THB)  !

. E Mail report,to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

l I

bec to DCD (IE01)  ;

bec distrib. by RIV: ' '

Regional Administrator Resident inspector

DRP Director DRS-PSB

Dranch Chief (DRP/D) MIS System

Project Engineer (DRP/D) RIV File

Branch Chief (DRP/TSS) Leah Tremp{er (OC/LFDCB, MS:

TWFN 9E10)

Enforcement. Officer

.

j

Regional Counsel l

'

J, Lieberman, OE (MS: 7-H5) '

OE: EA File,'(MS: 7-HS)

l

!

!

l

!

'

,

t

n

DOCUMENT NAME: R:\ WAT\WT713RP.GEW

To e copy cw docum.ne, b in hos: i ,. copy weeut enee.ure. r copy wnn encio.un. pr' No em

~

lRIVRE:q{tP/D l C:DRP/D 1)JJ D:DRP. l l l

lGEMpk PHMrrW/ TPGwynn

l0$#7 6/g g y 6/ /97

/ OFFIC Al REGORD COPY

.

. .