Text
P.
.
'
.
!p* LE!vg
UNITE 3 STATES
$
' *t
NUCLEAR REGULATORY COMMISSION
j
e
'
$
$
REGloN IV
e
i
O
%*,,e*,o[
s
611 RYAN PLAZA DRIVE, SulTE 400
June 13, 1997
EA 97-278
Charles M. Dugger, Vice President
Operations - Waterford 3
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
i
SUBJECT: NRC INSPECTION REPORT 50-382/97-13
Dear Mr. Dugger:
An NRC inspection was conducted June 2-6,1997, of activities associated with your
Waterford Steam Electric Station, Unit 3, reactor facility. The enclosed report presents
the scope and results of that inspection.
Based oa the results of this inspection, two apparent violations were identified and are
i
bemg considered for escalated enforcement action in accordance with the " General
1
Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy),
NUREG-1600. The apparent violations discussed in the enclosed report are the failure to:
(1) maintain containment isolation valves operable in accordance with Technical
Specification.3.6.3, and (2) perform a safety evaluation to assess operating the plant in a
condition other than described in the Updated Final Safety Analysis Report. Accordingly,
no Notice of Violation is presently being issued for these inspection findings. In addition,
please be advised that the number and characterization of apparent violations described in
the enclosed inspection report may change as a result of further NRC review.
A predecisional enforcement conference to discuss these apparent violations has been
scheduled for 1:00 p.m. (CDT) on July 29,1997. The decision to hold a predecisional
enforcement conference does not mean that the NRC has determined that a violation has
occurred or that enforcement action will be taken. This conference is being held to obtain
information to enab;e the NRC to make an enforcement decision, such as a common
understanding of the facts, root causes, missed opportunities to identify the apparent
violation sooner, corrective actions, significance of the issues, and the need for lasting and
effective corrective action. In particular, we expect you to address information in your
licensing basis used to establish your position that these containment "olation valves do
not have a closed safety function in addition, this is an opportunity for you to point out
any errors in our inspection report and for you to provide any information concerning your
perspectives on. (1) the severity of the violations, (2) the application of the factors that
the NRC considers when it deterrnines the amount of a civil penalty that may be assessed
I!lllWil!llllillElllll!DilOHill
(
gg62gg gg2
'
'
G
-
_ _ . , __
_
- - - - -
-
- - - -
r,
.
..
Entergy Operations, Inc.
-2-
,
in accordance with Section VI.B.2 of the Enforcement Policy, and (3) any other application
of the Enforcement Policy to'this case, including the exercise of discretion in accordatice
,
'
with Section Vll.
l
You will be advised by separate correspondence of the resvits of our deliberations on this
matter. No response regarding these apparent violations is required at this time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
!
1
,
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
.
Sincerely,
!
%A
Q
~
Thomas P. Gwynn, Director
-
i
Division of Reactor Projects
,
Docket No.: 50-382
License No.: NPF-38
Enclosure:
-
NRC Inspection Report
50-382/97-13
(
cc w/ enclosure:
,
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
l
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
i
I
r
l
,
l
c-
.
,
i
.
.
l
Entergy Operations, Inc.
-3-
i
i
General Manager, Plant Operations
Waterford 3 SES
,
Entergy Operations, Ir.c.
P.O. Box B
,
Killona, Louisiana 70066
!'
Manager - Licensing Manager
Waterford 3 SES
.
Entergy Operations, Inc.
i
P.O. Box B
'
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
t
Director, Nuclear Safety &
'
Regulatory Affairs
Waterford 3 SES
l
Entergy Operations, Inc.
P.O. Box B
!
Killona, Louisiana 70066
!
'
William H. Spell, Administrator
.
Louisiana Radiation Protection Division
P.O. Box 8?.135
Baton Rouge, Louisiana 70884-2135
Parish President
!
'
'
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
.
Bethesda, Maryland 20814
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005 3502
.-
_-_
., _
_ _ . . - - . - - - _ _ _
.
__
,
.
.
d *\\
Entergy Operations, Inc.
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE0lli
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Enforcement Officer
Regional Counsel
J. Lieberman, OE (MS: 7-H5)
OE: EA File, (MS: 7-H5)
DOCUMENT NAME: R:\\_WAT\\WT713RP.GEW
To receive copy of document, indicate in box: "C" = Copy without
n
ures "E" = Copy with enclosures "N" = No copy
RIV:PE:DRP/D
C:DRP/D
D:DRP
K
GEWerner
PHHarrell
TPGwynn F
6/ /97
6/ /97
6/$/97
'
OFFIC:AL 3ECORD COPY
sSW
06/16/97
08:48
R IU US tRC FTS
002
I
,
i
i
$
i
!
!
i
.
. jl
l
!
'
i
!
'
Ebtergy Operations, Inc.
-4-!
j
i
I
'
i
i
!
>
,
!
'
t
E Mail report to T. Boyce (THB)
!
E Mail report,to NRR Event Tracking System (IPAS)
.
E Mail report to Document Control Desk (DOCDESK)
l
I
bec to DCD (IE01)
'
'
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Dranch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
Leah Tremp{er (OC/LFDCB, MS:
RIV File
Branch Chief (DRP/TSS)
TWFN 9E10)
Enforcement. Officer
j
.
Regional Counsel
l
'
J, Lieberman, OE (MS: 7-H5)
'
OE: EA File,'(MS: 7-HS)
l
!
!
l
!
'
,
t
n
DOCUMENT NAME: R:\\ WAT\\WT713RP.GEW
To e copy cw docum.ne, b in hos: i . copy weeut enee.ure. r copy wnn encio.un. pr' No em
~
,
lRIVRE:q{tP/D l
C:DRP/D
1)JJ D:DRP.
l
l
l
lGEMpk
PHMrrW/
TPGwynn
l0$#7
6/gg y
6/ /97
/
OFFIC Al REGORD COPY
.
.
.