ML20087G624

From kanterella
Revision as of 07:24, 14 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1983
ML20087G624
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/30/1983
From: Morris C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20087G540 List:
References
NUDOCS 8403200082
Download: ML20087G624 (3)


Text

1 NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT NAME SONGS - 2 3 DATE 12/15/83 (as I revised 3/15/84)

COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station, Unit 2
2. Reporting Period: 1 November 1933 through 30 November 1983
3. Licensed Thermal Power (MWt): 3,390
4. Nameplate Rating (Gross MWe): _1,127
5. Design Electrical Rating (Net MWe): 1,070
6. Maximum Dependable Capacity (Gross MWe): 1,127
7. Maximum Dependable Capacity (Net MWe): 1,070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 2761 2761
12. Number Of Hours Reactor Was Critical 331.0 2305.3 2305.3
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 331.0 2287.1 2287.1
15. Unit Reserve Shutdown Hours 0 0 0
15. Gross Thermal Energy Generated (MWH) 1,113,802 7,608,130 7,608,130
17. Gross Electrical Energy Generated (MWH) 377,015 2,605,302 2,605,302
18. Net Electrical Energy Generated (MWH) 355,435 2,491,292 2,491,292
19. Unit Service Factor 46.0 82.8 82.8
20. Unit Availability Factor 46.0 82.8 82.8
21. Unit Capacity Factor (Using MDC Net) 46.1 84.3 84.3
22. Unit Capacity Fac. tor (Using DER Net) 46.1 84.3 84.3
23. Unit Forced Outage Rate 2.2 4.2 4.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA

=

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 15 December 1983
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 0403200082 840315 PDR ADOCK 05000361 R PDR

. - - .--s , , -,r--

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-361 UNIT SONGS - 2 DATE 12/15/83 (as revised 3/15/84)

COMPLETED BY C. A. Morris TELEPHONE (71a) 492-7700 Ext. 56264 MONTH: November 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1096.71 17 0 2 1103.48 18 6 3 1100.35 19 0 4 1094.13 20 0 5 1079.58 21 0 6 1090.33 22 0

~

7 1110.00 23 ____ 0 8 995.00 24 0 9 1072.92 25 0 10 1095.83 26 0 11 1105.48 27 0 12 1096.00 28 0 13 1100.67 29 0 14 844.23 30 0 15 0 31 NA 16 0 0565u e

_-. . ..~ m _ _ _ _ . .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-361 UNIT NAME SONGS - 2 REPORT MONTH NOVEMBER, 1983 DATE 12/15/83 (as revised 3/15/84) 4 COMPLETED BY C. A. Morris TELEPHONE ( 7?4) 492-7700 Ext. 56264 x

Method of Shutting Du ra t ion Down LER Systcm Component Cause & Corrective -

1 . 2 3 4 - 5 ' Action to .

No. Date Type (Hours) Reason Reactor No. Code Code Prevent Recurrence >

'25 831114 F 16 G 2 83-151 RB VALVEX Reactor manually tripped due to pressurizer pressure and level decreases, af ter an operator erroneously opened emergoney bora tion va lve 2HV-9247. The operator was counseled.

S 373 F i4A ' NA NA NA 18-Month Surveillance Outage.

4 1 .

2 3 4 F-F o rced Reason: .

. Method: Exhibit F- Instructions S-Scheduled - A-Equipment Fa i lure ( Expla in) 1-Manual for Preparation of Data B-Ma intenance or . Test 2-Manua l Sc ram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File D-Regulatory Restriction 4-Con t i r,ua t i on f rom (NUREG 0161)

E-Operator Training & License Examination Previous Month F-Adm in i st ra t ive 5-Reduction of 20% 5 G-Ope ra t iona l Error ( Expla in) or greater in the Exhibit H-Same Source H-Othe r ( Expla in) . past-24 hours 0565u 6-Other ( Explain) i i

i c_ __ _ - _ _ . . ,