_.
j; 4M.IHI NN 0 At H ORNl4 1
1 EDISON w msouur mrm y - c.
,,.n, November 10,1997 U. S. Nuclear Regulatory Commission Document Control Desk 4
- Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50 362 Monthly Operating Reports for October 1997 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Opera'.ing Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Month ly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for t'ach unit. Enclosures 1 and 2 provide the October 1997 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.
If you have any questions, please contact Mr. C. E. Williams at (714) 368-6707.
Sincerely,
<1/0 rg
. y Gregory T. Gibson Manager, Compliance I
Enclosures cc:
E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 t*
t-g h61 R
pm
, If l'.O.ibs128 San Clemente, CA 9?t3744)t'll!
. i.'
i l
t i
I NRC Monthly Operating Report, October 1997 San Onofre Nuclear Generating Station, Unit 2 3
5
t USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS 2 L
UNIT 2 Date:
November 10,1997 October 1997 Completed by: C. E. Williams Telephone:
(714) 368 S7M Pege 1 of 3 OPERATING DATA REPORT 1~
Design Electrical Reting (Not MWe) 1070:
2 Maximum Dependable Capacity (Gross MWe) 1127 l3 Mealmum Dependable Cepeelty (Not MWe) -
1070-This Month Yr to-Date Cumulative 4-Numberof Hours in Period
-745 7,296'
~ 124,537 '
S Number of Hours Reactor Was Critical 745 4,801 96,206 6'
Hours Generator On-line' 745; 4,733' 94,580 7
Unit Reserve Shutdown Hours 0.0 0.0 0.0 8
Not Electrical Energy Generated (MWh) -
J 813,2961 5,023,149 99,614,233 y-e g
y
,,r-e-
w-
-,w+,
y
USNRC MONTHLY OPERATING REPORT Docket No:
50 361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS 2 UNIT 2 Date:
November 10,1997 October 1997 Completed by: C. E. Williams L
Telephone:
(714) 368-6707 Page 2 of 3 l
UNIT SHUTDOWNS AND POWER REDUCTIONS Number N/A Date N/A Type (1)1 N/A.
Duration (1)
N/A Reason (2)?
N/A Method of shutting down reactor (3)
N/A LER Not N/A:
System Code (4)
N/A Component Code (6)-
'N/A-Cause and corrective action to prevent recurrence N/A (1) F Forced S-Scheduled (2) Roanon' A-Equiprnent Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examinatka F.Adm6nestrettve G-Operatonal Enor (Explain)
H Other (Explain)
(3) Method.
1-Manuel 2-Manual Scram 3-Automatic Scram 4-Continuatui from Previous Month S.Roducten in the Average Deity Power Level of more than 20% from the prevous day 6-Other (Explain)
(4) lEEE Std 805-1964 (5) IEEE Std 803A 1983 l
l
t USNRC MONTHLY OPERATING REPORT Docket No:
50 361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS +2 UNIT 2 Date:
November 10,1997 October 1997 Completed by: C. E. Williams Telephone:
(714) 3684707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 10/1/97:
0001)
Mode 1, 99.7% reactor power,1.143 MWe,~162.6 EFPD M
Commenced reactor down power to 80% to perform circulating water heat 10/24/97 2330 treat.
10/26/97-01301 Unit et 80% reactor power,850 MWe.
10/25/97 1150 Commenced unit power ramp to 100%
1845J Unit.et-99.9% reactor power,1152 MWe, '
10/26/97 0200 All clocks adjusted b6;.4 one hour to conform with Pacific Standard Time.
10/31/97 24000 Mode 1,99.7% roedor power,1163 MWe,193.4 EFPD -
.-_~ _ -i i
i b
g t
i I
i i
NRC Monthly Operating Report, October 1997 i
San Onofre Nuclear Generating Station, Unit 3 1
i i
i e.--,
.-w
.-...,_...y-,
s' USNRC MONTHLY OPERATING REPORT Docket No:
50 362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS 3 UNIT 3 Date:
November 10,1997 October 1997 Completed by; C. E. Williams Telephone:
(714) 368-6707 Page 1 of 3 OPERATING DATA REPORT 1
Design EleoWool Rating (Not MWo) :
.1080 2
Maximum Dependable Capacity (Gross MWe) 1127
,3-Maximum Dependat,le Cepeelty (Not MWe) -
F -1000 This Month Yr to Date Cumulative 4-Number of Hours in Period 746 7,298 1119,088 4
Number of Hours Reactor Was Critical 745 5,045 95,338 6' -
Hours Generator On line-745-c 4,894 93,428 6
Unit Reserve Shutdown Hours 0.0 0.0 0.0 7i Not Electrical Energy Generated (MWh) -
811,754
'5,222,139-97,000,150 i
l
..- ~
i i
USNRC MONTHLY OPERATING REPORT Docket No:
50-362 l
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS 3 UNIT 3 Date:
November 10,1997 October 1997 Completed by: C. E. Williams Telephone:
(714) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number N/A i
Date N/A
~
Type (1);
.. N/A :
Duration (Hours)
N/A l
Reason (2) 5N/A-Method of shutting down reactor (3)
N/A LER No.-
.N/A System Code (4)
N/A Component Code (5)
- N/A Cause and corrective action to prevent recurrence N/A (1) F Forced S Scheduled (2) Reason:
A.Equenent Failure (Explem)
B-Memtenance or iest C-RefuehnD D Regulatory Restrleton E Operator Trem6ng & Uc*nte Examinston F Adnmetratrve G-operstonal Error (Expiem)
H-other (Expieen)
(3) *Asthod 1-Manuel 244enuel Scram 3-Automate Scram 4Contmuston from Previous Month 6-Reductkm in the Average Deity Power Level of more than 20% from the previous day 6-other (Erpiem)
(4) IEEE Std 8051964 (5) IEEE Std 803A 1963 L[
~ _
=
USNRC MONTHLY OPERATING REPORT Docket No:
50 362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS 3 UNIT 3 Date:
November 10,1997 October 1997 Completed by: C. E. Williams Telephone:
(714) 368-6707 Page 3 of 3 1
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event
- 104147:
0001-Mode 14100% reactor power.1140 MWe, 70.3 EFPD :
Commenced reactor down power to 80% to perform circuleting water 10/04/97 0310 heat treat.
0520 Unit at 80%ienctor power,870 MWo.'
1445 Commenced unit power ramp to 100%.
1810:
Unit at 100% reactor power,1136 MWe 10/26/97 0200 All clocks adjusted back one hour to conform with Pacific Standard Time.
-10/3147 2400 Mode 1,99,8% fonctor power l1141 MWe,101.1 EFPD.-