...m NRC MONTHLY OPERATING REPORT L
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3
-i DOCKET NO:
50-362 UNIT NAME:
SONGS - 3
[
DATE:
February 14, 1997 l
l COMPLETED BY:
C.
E. Williams TELEPHONE:
(714) 368-6707 OPERATING STATUS 1.
Unit Name:
San Onofre Nuclear Generating Station, Unit 3 2.
Reporting Period:
October 1996
- 3. Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross MWE):
1127 I
5.
Design Electrical Rating (Net MWE):
1080 6.
Maximum Dependable Capacity (Gross MWE) :
1127 7.
Maximum Dependable Capacity (Net MWE):
1080 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWE) :
NA
- 10. Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.00 7,320.00 110,328.00 1 ".. Number Of Hours Reactor Was Critical 480.50 6,891.48 88,828.18
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 467.40 6,850.67 87,070.31 l
l
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1,515,524.98 22,776,486.91 281,275,986.31
- 17. Gross Electrical Energy Generated (MWH) 512,133.00 7,673,653.00 95,433,123.00
- 18. Net Electrical Energy Generated (MWH) 481,023.78 7,272,685.21 90,212,048.77
- 19. Unit Service Factor 62.74%
93.59%
78.92%
- 20. Unit Availability Factor 62.74%
93.59%
78.92%
- 21. Unit Capacity Factor (Using MDC Net) 59.78%
91.99%
75.71%
- 22. Unit Capacity Factor (Using DER Net) 59.78%
91.99%
75.71%
- 23. Unit Forced Outage Rate 0.00%
0.00%
5.18%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling shutdown, April 5, 1997, 70 days
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior To Commercial Operation) :
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA I
1 t