Monthly Operating Rept for Oct 1996 for Songs,Unit 3
ML20138M388
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/31/1996
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20138M347 List:
References
NUDOCS 9702250374
Download: ML20138M388 (1)


Text

m _ _ _ . . _ _ , _ . . - .__..m._ __..._m . - - -_ . . - _ . . _ . _ _ ...m . _ . _ _ . .

NRC MONTHLY OPERATING REPORT ,

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3

-i DOCKET NO: 50-362 .

UNIT NAME: SONGS - 3 DATE: February 14, 1997 l COMPLETED BY: C. E. Williams ,

TELEPHONE: (714) 368-6707  ;

OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station, Unit 3
2. Reporting Period: October 1996
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWE): 1127 I
5. Design Electrical Rating (Net MWE): 1080 ,
6. Maximum Dependable Capacity (Gross MWE) : 1127  ;
7. Maximum Dependable Capacity (Net MWE): 1080
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWE) : NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 745.00 7,320.00 110,328.00 1 ". . Number Of Hours Reactor Was Critical 480.50 6,891.48 88,828.18
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 467.40 6,850.67 87,070.31
15. Unit Reserve Shutdown Hours l

0.00 0.00 0.00

16. Gross Thermal Energy Generated (MWH) 1,515,524.98 22,776,486.91 281,275,986.31
17. Gross Electrical Energy Generated (MWH) 512,133.00 7,673,653.00 95,433,123.00
18. Net Electrical Energy Generated (MWH) 481,023.78 7,272,685.21 90,212,048.77
19. Unit Service Factor 62.74% 93.59% 78.92%  !
20. Unit Availability Factor 62.74% 93.59% 78.92% ,
21. Unit Capacity Factor (Using MDC Net) 59.78% 91.99% 75.71%
22. Unit Capacity Factor (Using DER Net) 59.78% 91.99% 75.71%
23. Unit Forced Outage Rate 0.00% 0.00% 5.18%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling shutdown, April 5, 1997, 70 days

25. If Shutdown At End of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation) : Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1 t 9702250374'970218 ,

PDR ADOCK 05000361 R PDR

- _ - _ _ - - - - _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _ _ _ - _ _ - _ - - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . - - _ _ _ - - _ - _ _ _ _ _ - _ . _ _ - _ _ _ _ - - -