Monthly Operating Rept for Dec 1996 for Songs,Unit 3
ML20138M417
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/31/1996
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20138M347 List:
References
NUDOCS 9702250381
Download: ML20138M417 (1)


Text

-

NRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 3  ;

' DOCKET NO: 50-362 ,.

. t UNIT NAME: SONGS - 3 DATE: February 14, 1997 j' [

COMPLETED BY: C. E. Williams -

TELEPHONE: (714) 368-6707 - t OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station, Unit 3 i
2. Reporting Period: December 1996 [
3. Licensed Thermal Power (MWt) : 3390
4. Nameplate Rating (Gross MWE): 1127 j
5. Design Electrical Rating (Net MWE) : 1080 )
6. Maximum Dependable Capacity (Gross MWE) : 1127 [
7. Maximum Dependable Capacity (Net MWE) : 1080
8. If Changes Occur In Capacity Ratings (Items Number 3.Through 7)  ;

Since Last Report, Give Reasons: NA

9. Power Level.To Which Restricted, If Any (Net MWE): NA i
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 8,784.00 111,792.00 l
12. Number Of Hours Reactor Was Critical 744.00 ,

8,355.48 90,292.18 t

13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 ,
14. Hours Generator On-Line 744.00 8,314.67 88,534.31 l l
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2,497,044.24 27,639,982.80 286,139,482.20 [
17. Gross Electrical Energy Generated (FDM) 846,630.00 9,321,737.50 97,081,207.50 ,
18. Net Electrical Energy Generated (MWH) 804,454.74 8,838,647.32 91,778,010.88 [;
19. Unit Service Factor 100.00% 94.66% 79.20%
20. Unit Availability Factor 100.00% 94.66% 79.20%  !
21. Unit Capacity Factor (Using MDC Net) 100.12% 93.17% 76.02% i
22. Unit Capacity Factor (Using DER Net) 100.12% 93.17% 76.02% i
23. Unit Forced Outage Rate 0.00% 0.00% 5.10%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
  • Refueling shutdown, April 5, 1997, 70 days
25. If Shutdown At End of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved ,

INITIAL CRITICALITY NA NA  !

INITIAL ELECTRICITY NA NA I COMMERCIAL .iRATION NA NA t l

1 Nk kDO Ob i e .__, ,

_ _ _ _ . .__ .- ___ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ __ _ . ___ _ . . _ _ _ . _ _ _ . _ _ - .