i NRC Monthly Operating Report, May 1997 San Onofre Nuclear Generating Station, Unit 2 9706190402 970616 PDR ADOCK 05000361 R
. _ - ~.
USNRC MONTilLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 I
UNIT 2 Date:
June 1997 May 1997 Completed by:
C. E. Williams Telephone:
(714) 368-6707 Page1of3 1
\\
l OPERATING DATA REPORT 1
Design Electrical Rating (Net MWe) 1070 l
2 Maximum Dependable Capacity (Gross MWe) 1127
.3 -.
Maximum Dependable Capacity - (Net MWe) <
'1070 i
l This Month Yr-to-Date Cumulative 4
Number of Hours Reactor Was Critical -
744-.
1,5179
- 92,922; l
5 Hours Generator On-line 744 1,462 91,309 6.
Unit Reserve Shutdown Hours.
- 0.0:.
0.01
- 0.0 ;
l 7
Net Electrical Energy Generated (MWh) 810,960 1,535,028 96,126,112 l
l i
i i
l l
l l
4
1
~
U;NRC MONTHLY OPERATING REPORT Dock;t No:
50-361 l
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 j
UNIT 2 Date:
June 13,1997 l
May 1997 Completed by:
C. E. Williams Telephone:
(714) 368-6707 l
Page 2 of 3 SHUTDOWNS AND POWER REDUCTIONS Numberl
'None:
Date N/A Type.(1)?
L N/Ai; Duration (1)
N/A Reason (2)).
~ N/Ati Method of shutting down reactor (3)
N/A LER Nob
^
-N/A3 System Code (4)
N/A component Code (5)?
N/Af s
Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Scheduled (2) Raason:
A-Equipment Failure (Explain)
B-Maintenance or Test 1
C-Refueling i
D-Regulatory Restricton E-Operator Training & License Examinaton F-Administrative G-Operatonal Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Scram 3-Automabc Scram 4-Contnuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)
(4)IEEE Std 805-1984 (5)lEEE Std 803A-1983 1
^
I USNRC MONTHLY OPERATING REPORT Dockti No:
50-361
' SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
June 13,1997 May 1997 Completed by:
C. E. Williams Telephone:
(714) 368-6707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event L5/1/97:L
,0001l Mode 1[99.7% reactor power,.1162 MWe,;29.3 EFPD;
~
5/24/97 1400 Unit 2 power reduced to 80% for heat treat.
i 5/25/97d 00424
. Completed heat treat of Unit 2/
5/25/97 1200 Unit 2 returned to full power 1152 MWe.
5/31/972 12400f. Unit 2 is in M6dsW99,'8% reactor power,11158 MWs; 60.0 EFPDi i
l 1
l f
J
1 4
NRC Monthly Operating Report, May 1997 i
San Onofre Nuclear Generating Station, Unit 3 i
~
USNRC MONTHLY OPERATING REPORT Docket No:
50-362 i
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
June 1997 May 1997 Completed by:
C. E. Williams Telephone:
(714) 368-6707 Page1of3 t
OPERATING DATA REPORT
'1 Design Electrical Rating (Net MWe).
- 1080.:
2 Maximum Dependable Capacity (Gross MWe) 1127 (3
Maximum Dependable Capacity (Net MWe) -
-1080-This Month Yr-to-Dato Cumulative
.4-Number of Hours Reactor Was Critical 0
- -2,424 '
-92,718-5 Hours Generator On-line 0
2,424 90,968 6
Unit Reserve Shutdown Hourss-0.0 ~
- 0.0.
- 0.0 -
f7 Net Electrical Energy Generated (MWh)
(4,655) 2,589,558 94,367,569 l
r i
4
-l
UINRC MONTHLY OPERATING REPORT Dockst No:
50-362 SAN ONOFRE NUCLEAR GENERATING STATION Uriii Name:
SONGS-3 UNIT 3 Date:
June 13,1997 May 1997 Completed by:
C. E. Williams Telephone:
(714) 368-6707 1
Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number -l as
. 93 L Date April 12,1997 Type (1)L s
- iS(Scheduled)?
Duration (Hours) 744 Reason (2)i iC(Refueling)J Method of shutting down reactor (3) 4 (Continuation)
LER No?
M
-; N/A -
System Code (4)
N/A Component Code (5)?
^ N/A!
Cause and corrective action to prevent recurrence N/A (1)
F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restricton E-Operator Traimng & Ucense Examination F-Administrative G-Operatkmal Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Scram 3-Automate Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)
(4)IEEE Std 805-1964 (5)IEEE Std 803A 1983 I
i USNRC MONTHLY OPERATING REPORT Docket No:
50-362
- SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS 3 UNIT 3 Date:
June 13,1997 May 1997 Completed by:
C. E. Williams Telephone:
(714) 368-6707 Page 3 of 3 3
SUMMARY
OF OPERATING EXPERIENCE FOR Tile MONTil i
Date Time Event 5/D97),
0001 E U$it 3"ddfusled RCIAainN io 2MEth$hbtleg3 4
5/17/97 1030 Started core reload. First fuel assembly moved into the reactor vessel.
o 5/52/975 06107 Comhletid core'reidAd)
!rk Entered Mode 5, RCS at 98 F. All reactor vessel head bolts are fully 5/28/97 0025 tensioned.
'5/31/971 240 i Unit kin Mode'5/ 93*Fissndsphsric pressure."
~