_ _.. _.

2 s

i NRC Monthly Operating Report, May 1997 San Onofre Nuclear Generating Station, Unit 2 9706190402 970616 PDR ADOCK 05000361 R

PDR

. _ - ~.

USNRC MONTilLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 I

UNIT 2 Date:

June 1997 May 1997 Completed by:

C. E. Williams Telephone:

(714) 368-6707 Page1of3 1

\\

l OPERATING DATA REPORT 1

Design Electrical Rating (Net MWe) 1070 l

2 Maximum Dependable Capacity (Gross MWe) 1127

.3 -.

Maximum Dependable Capacity - (Net MWe) <

'1070 i

l This Month Yr-to-Date Cumulative 4

Number of Hours Reactor Was Critical -

744-.

1,5179

92,922; l

5 Hours Generator On-line 744 1,462 91,309 6.

Unit Reserve Shutdown Hours.

0.0:.

0.01

- 0.0 ;

l 7

Net Electrical Energy Generated (MWh) 810,960 1,535,028 96,126,112 l

l i

i i

l l

l l

4

1

~

U;NRC MONTHLY OPERATING REPORT Dock;t No:

50-361 l

SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 j

UNIT 2 Date:

June 13,1997 l

May 1997 Completed by:

C. E. Williams Telephone:

(714) 368-6707 l

Page 2 of 3 SHUTDOWNS AND POWER REDUCTIONS Numberl

'None:

Date N/A Type.(1)?

L N/Ai; Duration (1)

N/A Reason (2)).

~ N/Ati Method of shutting down reactor (3)

N/A LER Nob

^

-N/A3 System Code (4)

N/A component Code (5)?

N/Af s

Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Scheduled (2) Raason:

A-Equipment Failure (Explain)

B-Maintenance or Test 1

C-Refueling i

D-Regulatory Restricton E-Operator Training & License Examinaton F-Administrative G-Operatonal Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automabc Scram 4-Contnuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4)IEEE Std 805-1984 (5)lEEE Std 803A-1983 1

^

I USNRC MONTHLY OPERATING REPORT Dockti No:

50-361

' SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

June 13,1997 May 1997 Completed by:

C. E. Williams Telephone:

(714) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event L5/1/97:L

,0001l Mode 1[99.7% reactor power,.1162 MWe,;29.3 EFPD;

~

5/24/97 1400 Unit 2 power reduced to 80% for heat treat.

i 5/25/97d 00424

. Completed heat treat of Unit 2/

5/25/97 1200 Unit 2 returned to full power 1152 MWe.

5/31/972 12400f. Unit 2 is in M6dsW99,'8% reactor power,11158 MWs; 60.0 EFPDi i

l 1

l f

J

1 4

NRC Monthly Operating Report, May 1997 i

San Onofre Nuclear Generating Station, Unit 3 i

~

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 i

SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

June 1997 May 1997 Completed by:

C. E. Williams Telephone:

(714) 368-6707 Page1of3 t

OPERATING DATA REPORT

'1 Design Electrical Rating (Net MWe).

1080.:

2 Maximum Dependable Capacity (Gross MWe) 1127 (3

Maximum Dependable Capacity (Net MWe) -

-1080-This Month Yr-to-Dato Cumulative

.4-Number of Hours Reactor Was Critical 0

-2,424 '

-92,718-5 Hours Generator On-line 0

2,424 90,968 6

Unit Reserve Shutdown Hourss-0.0 ~

0.0.

- 0.0 -

f7 Net Electrical Energy Generated (MWh)

(4,655) 2,589,558 94,367,569 l

r i

4

-l

UINRC MONTHLY OPERATING REPORT Dockst No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Uriii Name:

SONGS-3 UNIT 3 Date:

June 13,1997 May 1997 Completed by:

C. E. Williams Telephone:

(714) 368-6707 1

Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number -l as

. 93 L Date April 12,1997 Type (1)L s

iS(Scheduled)?

Duration (Hours) 744 Reason (2)i iC(Refueling)J Method of shutting down reactor (3) 4 (Continuation)

LER No?

M

-; N/A -

System Code (4)

N/A Component Code (5)?

^ N/A!

Cause and corrective action to prevent recurrence N/A (1)

F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restricton E-Operator Traimng & Ucense Examination F-Administrative G-Operatkmal Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automate Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4)IEEE Std 805-1964 (5)IEEE Std 803A 1983 I

i USNRC MONTHLY OPERATING REPORT Docket No:

50-362

  • SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS 3 UNIT 3 Date:

June 13,1997 May 1997 Completed by:

C. E. Williams Telephone:

(714) 368-6707 Page 3 of 3 3

SUMMARY

OF OPERATING EXPERIENCE FOR Tile MONTil i

Date Time Event 5/D97),

0001 E U$it 3"ddfusled RCIAainN io 2MEth$hbtleg3 4

5/17/97 1030 Started core reload. First fuel assembly moved into the reactor vessel.

o 5/52/975 06107 Comhletid core'reidAd)

!rk Entered Mode 5, RCS at 98 F. All reactor vessel head bolts are fully 5/28/97 0025 tensioned.

'5/31/971 240 i Unit kin Mode'5/ 93*Fissndsphsric pressure."

~