Text

....

4 Enclosure i NRC Monthly Operating Report, August 1997 San Onofre Nuclear Generating Station, Unit 2 9709230019 970915 PDR ADOCK 05000361 R

PDR

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOF'RE NUCLEAR GENERATING STATION Unit Name:

SONGS 2 UNIT 2 Date:

September 15,1997 August 1997 Completed by: C. E Williams Telephone:

(714) 368-6707 Page 1 of 3 OPERATING DATA REPORT 1

Design Electrical Rating (Not MWe) 1070 2

Maximum Dependable Capacity (Gross MWe) 1127

~

3 Maximum Dependable Capacity (Not MWe)-

1070 This Month Yr to Date Cumulative 4

Number of Hours Reactor Was Critical, <

744-3,336 94,741 5

Hours Generator On line 744 3,268 93,115 6

Unit Reserve Shutdown Hours 0.0 0.0 0.0 7

Net Electrical Energy Generated (MWh) 815,673 j 3,4?3,841 98,014,925

5 4

USNRC MONTHLY OPERATING REPORT Docket No:

50 361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

September 15,1997 August 1997 Completed by: C. E. Williams Telephona:

(714) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number

-N/A

^

Date N/A Type (1)

N/A Duration (1)

N/A Reason (2)

N/A Method of shutting down reactor (3)

N/A LER No.

N/A-System Code (4)

N/A Component Code (5)

N/A Cause and corrective action to prevent recurrence N/A (1) F. Forced S-Scheduled (2) Reason A-Equipment Failure (Explain)

B4Aaentenance or Test C Refuehng D. Regulatory Reetncton E-Operator Training & Lkenne Examination F-Administraltve G-Operatonal Error (Explain)

H-Other (Explain)

(3) Method 14Aanual 24Aanual Scram 3-Autometc Scram 4-Contuwetion from Prevous Month SReducten in the Average Dalty Power Level of mote than 20% from the previous day 40ther (Explain)

(4) IEEE Std 8C61964 (5) IEEE Std 803A 1983 l

G USNRC MONTHLY OPERATING REPORT Docket No:

50 361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS 2 UNIT 2 Date:

September 15,1997 August 1997 Completed by: C. E. Williams Telephone:

(714)368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 8/1/97 0001 Mode 1,99.7% reactor power,1153 MWe,101.8 EFPD.

Power gnd disturbance causes CPC sensor failure alarms. Main Turbine 8/5/97 1350 Speed increased to 1805 RPM.

8/11/97 1828 Unit started down power to 80% power to bump circulating water pumps 1830 80% power 930 MWe to bump circulating water pumps.

2330 Started power ramp to 100%.

8/12/97 0405 Returned to 100% power after circulating water pump bumping.

8/31/97 2400 Mode 1,99.9% reactor power,1150 MWe,132.8 EFPD.

i r

c e

NRC Monthly Operating Report, August 1997 San Onofre Nuclear senerating Station, Unit 3 i

p 5

+

_o

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

September 15,1997 August 1997 Completed by: C, E. Williams p

Telephone:

(714) 368-6707 Page 1 of 3 OPERATING DATA REPORT 1

Design Electrical Rating (Net MWe) iv. e., ~

2 Maxirr. urn Dependable Capacity (Gross MWe) 1127 3

Maximum Dependable Capacity (Net MWe) -

1080-This Month Yr-to-Date Cumulative 4

Number o1 Hours Reactor Was Criticaii 744-3,580.

93,873 =

5 Hours Ge1erator On-line 744 3,429 91,963 6-Unit Roserye Shutdown Hours.

0.0.

0.0 0.0 7

Net Elect!ical Energy Generated (MWh) 810,723 3,621,977 95,399,988 3t 1

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SA'N ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

September 15,1997 August 1997 Completed by: C. E. Williams Telephone:

(714) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number N/A Date N/A Type (1).

N/A Duration (Hours)

N/A Reason (2) -

N/A Method of shutting dov.n reactor (3)

N/A LER No.

N/A System Code (4)

N/A Component Code (5)

E'/A Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Scheduled (2) Reawn; A Equipment Faiiure (Explain)

B Maintenance or Test 4 Refueling D-Regulatory Restricticn E-Operator Training & Ucense Examinatiou F-Administratrvn G-Operationai 9;or (Explain)

H-Other (Expla'n)

(3) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level cf more than 20% from the previous day 6-Other (Explain)

(4) IEEE Std 8051984 (5) IEEE Std 803A-1983

USNRC MONTHLY OPERATING REPORT Docket No:

50 362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS 3 UNIT 3 Date:

September 15,1997 August 1997 Completed by: C. E. Wdliams Telephone:

(714) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event rt8/1/971

-0001.

Mode 1,99.5% reactor power,1150 MWe,10.3 EFPD, -

Power grid disturbance causes CPC sensor failure alarms. Main Turbine 8/5/97 1350 Speed increased to 1805 RPM.

NN 8/17/971 3830 pumps.

1050 Reached 80% plant power. Unit load 930 MWe.

'1455--

Main Turbine HP valve SUV2200D failed closed during downpower.;

Returned to 98.5% power,1132 MWe wNie awaitmg valve repair.

1755 Retumed to 100% power,1152 MWe.

~

P'**' "

N

[8/19/97!

2330'-

pumps.-

8/20/97 0130 Unit reache.180% reactor power,890 MWe, 0230--

Started ramp to 100% power after bump of circulshng water pumps.

0717 Reached 100% reactor power,1146 MWe.

p_to M p W W M N hMng W N 7s 1435D

system, 1700 Unit reached 80% reactor power,930 MWe.

Started power ramp to 100% reactor power after completing heat treat,'.

T 8/31/P7" "0503 9wiiNitune valve testinct and circulating water pump _ bumping.

s 2400 L' h.1,99.8% reactor power,1143 MWe,40.6 EFPD.

NRC Monthly Operating Report, August 1997 San Onofre Nucletr Generating Station, Units 2 and 3

- _ _ _ - _ _ _ - _ _ _ _ -