" fQi sovnaus uu,oum.
Jid EDISON x,, wno wn uwios y - o.,,,,,,
December 11,1997 U. S.- Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 1997
. San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Fachity Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires
' Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressuri:er safety valves, for each unit. Enclosures 1 and 2 provide the November 1997 Monthly Operating Reports for Units 2 and 3, reapectively. There were no challenges to pressurizer safety valves for either Unit 3 or 3.
!f you have any questions, please contact Mr. C. E. Williams at (714) 368-6707.
Sincerely, m
Enclosures -
cc:
E.' W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office. NRC Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 y
h l
9712170347 971130 DR ADOCK O 1
lI,illlillT*lllllMll e o~ > 8 3
ia San Ckmeme. CA 92$74 0128
Enclosure i NRC Monthly Operating Report, November 1997 San Onofre Nuclear Generating Station, Unit 2
... - _ =. ~.
.M i
4 i
/
t b
-r a-
- Enclosure 1 NRC Monthly Operating Report, November 1997 San Onofre Nuclear Generating Station, Unit 2 t
4 l'-
r US,NRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
December 11,1997 Nov3mber 1997 Completed by: C. E. Williams Telephone:
(714) 368-6707 Page 1 of 3 OPERATING DATA REPORT
.15 Design Electrical Rating (Net MWe);
ou
- 10705 2
Maximum Dependable Capacity (Gross MWe) 1127
- 3.-
Maximum Dependabb Capacity (Net MWe)
.1070L This Month Yr-to ') ate Cumulative "4;
_ Number of Houriin Periodd
- i7?01
-;84.f
$1_25,257; 5
Number of Hours Reactor Was Critical 720 5,521 96,926 f6!-
Hours Generator On-lines A7201::
15,453"
- L95,300::;
~
7 Unit Reserve Shutdown Hours 0.0 0,0 0.0
- 8.
Not Electrical Energy Generated l(MWh)s J790,926[ 1,81(075f !100305,159 5'
, \\ _.. _ _ _ _ _
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2' UNIT 2 Date:
December 11,1997 November 1997 Completed by: C. E. Williams Telephone:
(714) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS
- Number 5.a A w
sW-SN/Ai b
s Date N/A iType_(1)J m
R 2N/Ai Duration (1)
N/A
! Reason (2)pW ~.
F W
- n :
? N/A7
>/
Method of shutting down reactor (3)
N/A iN/Ai LER Non,
^
^
System Code (4)
N/A
- Component Code"(5)j
^
lLN/Ai?
~
x s
Cause and corrective action to prevent iecurrence N/A (1) F-Forced S-Scheduled (2) Reason:
A Equipment Failure (Explain)
D-Maintenance or Tes*
C-Refueling D-Rrmtatory Restriction
. E-Opcirx Training & Uctase Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
14Aanual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6 Other (Explain)
(4) IEEE Std 805-19e4 (5) IEEE Std 803A-1583 u -
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 JSAN ONO'FRE NUCLEAR GENERATING STATION -
Unit Name:
SONGS-2 UNIT 2 Date:
December 11,1997 November 1997 -
Completed by: C. E. Williams Telephond:
.(714) 368-6707-Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event dj/1/94 '000ii LModeX99.7stenctophr/I1153(MWe,51933 EFPDjf m
11/30/97 2400 Mode 1,100% reactor power,1155 MWe,223.4 EFPD t
1 4
L 4
d-m
~
6 1'.p..
P NRC Monthly Operating Report, November 1997 San Onofre Nuclear Generating Station, Unit 3
y USNRC MONTHLY OPERATING REPORT -
Docket No:
50-362-
' SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS' ;-
'~
UNIT 3-Date:
December 11; 1997--
November 1997
- Completed by:.C. E. Williams'
' Telephone:
' (714) 368-6707 -
. Page 1 'of 3 -
OPERATING DATA REPORT-MP Design IDectricol. Rating (Not MWe)il ngt
&@ 4%
@4080 s '
- 2 Maximum Dependable Capacity (Gross MWe) 1127
$3C Maximum Dependable Capacity (Not MWe)RL l'
-l610803',
4 This Month Yr-to-Date Cumylggyg, 14?r.Numberof Hours in Period
"; 4%$r 'e sn#720P& $88,016W* t119,806F 4
Number of Hours Reactor Was Critical 720-5,765 96,058 A5P Hours'Generatoronlinef
% wa
' i7201 s5,614f;
[94!148??
^
- 6-Unit Reserve Shutdown Hours 0.0 0.0 0.0 4
4 71; Not Electrical Energy Generated (MWh) s & M784,041; E.6,006,180 ?
197,784;1914 l~
i t
e 1
1 i
e e
1
USNR,C MONTHLY OPERATING REPORT Docket No:
50-362
- SAN ONOFRE NUCLEAR C2NERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
December 11,1997 November 1997 Completed by: C. E. Williams Telephone:
(714) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS
~ Number -
w 941 Date 11/15/97 FS?
Type'(1)J M
Duration (Hours) 0
- Reeson (2)?
(B n
-;p x
Method of shutting down reactor (3) 5 LER Not
'N/A?
System Code (4)
SG (N/Ai Component Code'{5)'
Power reduction to support planned Cause and corrective action to prevent recurrence heat treat of the circulating water intake.
(1) F Forced S-Scheduled (2) Reason:-
A Equipment Failure (Explain)
B-Maintenance or Test C-Refuehng 0-Regulatory Restrict 6on E-Operator Training & Ucense Examinate K-Administratta G-Operatonal Error (Eglain)
H-Other (Explain)
(3)PA..M.
14tanual 2-Manual Scram 3-Automatic Scram 4-cormnuation from Previous Month 5-Redu.: ten in the Avera0e Daily Power Level of more than 20% from the prwious day 6 Or.or (Explain)
(4) IEEE Std 805-1984 (5) IEEE Std 803A 1983 m
q a
?
I i
USNRC MONTHLY OPERATING REPORT Docket No:
50-362
' SAN ONOFPE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
December 11,1997 November 1997 Completed by: C. E. Williams Telephone:
(714) 368 6707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 311/01/97/
0001T
. Mode.1/99.8% reactor power,11141 MWe, 101.1 EFPD.-
Unit commenced power reduction to support planned heat treat of the 11/15/97 0200 circulating water intake.
0410
. Unit at 80% reactor power, 880.MWe.
2200 Unit commenced power increase to full load following heat treat.
i11/16/97:.
0020:
Unit at 100% reactor power,1' 40 MWe;-
1 11/30/97 2400 Mode 1,100% reactor power,1146 MWe,130.9 EFPD.
l
-