i NRC MONTHLY OPERATING REPORT DOCKET N0. 50-361 UNIT NAME SONGS - 2 DATE 2/15/84 (as revised 3/15/84)
COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 OPERATING STATUS 1.
Unit Name:
San Onofre Nuclear Generating Station, Unit 2 2.
Reporting Period:
1 January 1984 through 31 January 1984 3.
Licensed Thermal Power (MWt):
3,390 4.
Nameplate Rating (Gross MWe):
1,127 5.
Design Electrical Rating (Net MWe):
1,070 6.
Maximum Dependable Capacity (Gross MWe):
1,127 7.
Maximum Dependable Capacity (Net MWe):
1,070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report.. Give Reasons:
NA 1
9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 744 4249
- 12. Number Of Hours Reactor Was Critical 298.6 298.6 2911.3 13.
Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 279.9 279.9 2841.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Cross Thermal Energy Generated (MWH) 879,377 879,377 9,372,912
- 17. Gross Electrical Energy Generated (MWH) 302,581 302,581 3,214,545
- 18. Net Electrical Energy Generated (MWH) 282,231 282,231 3,057,875
- 19. L'ait Service Factor 37.6 20.
Unit Availability Factor 37.6-37.6 66.9 37.6 66.9
- 21. Unit Capacity Factor (Using MDC Net) 35.5 35.5 67.3
- 22. Unit Capacity Factor (Using DER Net) 35.5 35.5 67.3
- 23. Unit Forced Outage Rate 4.2 4.2 4.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: 25 February 1984
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA COMMERCIAL OPERATION NA-~
NA NA 8403200074 840315 PDR ADOCK 05000361 R
PUR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-361 UNIT SONGS - 2 DATE 2/15/84 (as revised 3/15/84)
COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 MONTH January 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1118.50 17 0
2 1041.52 18 0
3 1056.00 19 0
4 886.85 20
_0 5
0 21 0
6 314.27 22 0
7 1104.54 23 0
8 1116.46 24 0
o 9
1132.40 25 0
10 1132.50 26 0
11 1111.04 27 0
12 1008.75 28 0
13 982.60 29 0
14 0
30 0
15 0
31 0
l 16 0
0565u 1
.e r
p
._.________m_..
.._.___._.m
_...m,__
._.. _. ~ _
m..
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.10-161 UNIT NAME SONGS - 2 REPORT MONTH JANUARY, 1984 DATE 2/v5/84 fas revised 3/15/84)
COMPLETED BY C.
A.
Mo rri s l
TELEPHONE ( 714) 492-7700 i
Ext. S6264 Method of Shutting Dura t ion Down
.LER System Component Cause & Corrective '
1 2
3 4
5 Action to No.
Date Type (Hours) - Reason Reactor No.
Code Code Prevent Recurrence 1
840104 F
31.6 A
2 NA CD VALVEX Uni t was shut down to repa i r a l
nitrogen leak in Main Steam l
isolation Valve 2HV-8204.
-2 840113 S
432.5 A
1 NA CB PUMPPXX Unit was shut down for reactor Coolant pump seal replacement.
i l
1 2
3 4
F-Fo rced.
Reason:
Method:
Exhibit F-Instructions S-Sched.uled
- A-Equipment ra: lure (Explain) 1-Manual for Preparation of Data l'
B-Maintenance or Test 2-Manua l Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)
E-Operator Training & License Examination Previous Month F-Adm i n i st ra t ive 5-Reduction of 20%
5 G-Operational Error (Explain) or greater in the Exhibit H-Same Source l
H-Other ( Expla in).
past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0565u 9-Other (Expla in) l l
4 i
l-I i
e
i J
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-362 UNIT SONGS - 3 DATE 2/15/84 (as revised 3/15/84)
COMPLETED BY C. A. Morris TELEPHONE (714) 492-7700 Ext. 56264 MONTH January 1984 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1091.35 17 0
2 1094.25 18 0
3 1092.42 19 _,
0 4
1093.48 20 0
5 1085.90 21 0
6 102.50 22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
- Revised values.
Last month % submittal contained gross values rather then net values.