May 13,1997 1
U. S. Nuclear Regulatory Commission i I
Document Control Desk Washington, D. C. 20555 Gentlemen: ,
Subject:
Docket Nos. 50-361 and 50-362 -
Monthly Operating Reports for April 1997 San Onofre Nuclear Generating Station, Units 2 and 3 i Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for
- the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for !
sach unit. Enclosures 1 and 2 provide the April 1997 Monthly Operating Reports for
- Units 2 and 3, respectively.
If you have any questions, please contact Mr. C. E. Williams a't (714) 368-6707.
Sincerely,
~
) - .
fl Gregory . Gibson
[
Manager, Compliance /
8.f Enclosures I cc: E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 ;
9705200408 970430 I" PDR ADOCK 05000361- :
R PDR b
+
/
NncN!$camnmn hk .
4 i
4 Enclosure 1 NRC Monthly Operating Report, April 1997 San Onofre Nuclear Generating Station, Unit 2 4
t d
a i
6 l
i I
I I
i I
i i
3 '.
.s . .
r .
USNRC MONTHLY OPERATING REPORT Docket No: 50-361 L
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: May 13,1997 i
- . April 1997 Completed by: C. E. Williams l i Telephone: (714) 368-6707 i Page 1 of 5 I
. OPERATING DATA REPORT !
W UgensedThefmalPower(MWE):# J W , ?@!<
- anW& #E R t $300 s ' '
2 Nameplate Rating (Gross MWe) 1127
,4 43 DeelenEleoMeelRating.(NotMWW)W , @jsB?'J, m *4: c nMd/ ' 2 (1079?dW ,
4 Maximum Dependable Capacity (Gross MWe) 1127
{
161 Maulunga DeposideWe Cepecityl(Not MWe) iW %- mM W@a - M1070PM - l 6 if changes occurred in 1 through 5 since last report, give reason. None j (7) Power level to ishich reelrictedT# anya #@ ' : W @: , 2' ^ INIA) an I i
8 Reason for restriction, if any.- N/A l
This Month Yr-to-Date Cumulative !
J04 Numbero[Hoysin Period gg81 , Q19b e [2879f R$ f Q120,120gm !
10- Number of Hours Reactor Was Critical 719 773.1 92,178 ;
, :117 Reester Reserve Shutdown Heure NJW7y$ w '1.0 0j c% d-10.0? , , ' mio.0$6 a 12 Hours Generator On-line 718.3 718.3 90,565 113; . Unit Reserve Shutdown Hours s x n 7 0.0 p .
gud.03 c. #+ (0.0ss' l 1
- . 14 Gross Thermal Energy Generated (MWh) 2,364,580 2,372,717 296,619,480 ;
i-1810,813b ' 1100A93,58R
~
E1.6f Gross ElecMoel Energy Generated (MWh) s W . 1810,813; . !
- 16 Net Electrical Energy Generated (MWh) 768,456 724,069 95,315,152
\17f :. Unit Servlos Factor ' w ' wa 1 , (99,9%i' "t25.0%3 . **g64%3 s ;
18 Unit Availability Factor 99.9 % 25.0% 75.4 %
i
- s19 < Unit Capacity. Facer (Unin9 MDC Not);
._ & - 199;9%) , 124.0%1 < a N4,1% W l
) 20 Unit Capacity Factor (Using DER Net) 99.9 % 24.0 % 74.1 %
) 21 . Unit Forced Oute9e Rate! #* , M 0.0%t 10.0%$ <
w 14.8%!
- 22. Shutdowns scheduled over the next 6 months (type, date, and duration of each): N/A 4 23. If shutdown at end of report period, estimated date of startup: N/A l
~
- 24. Units in test status (prior to commercial operation): Forecast Achieved
! Initial criticality N/A N/A j initial electricity N/A N/A i Commercial operation N/A N/A L
1 4
- ~ . - . .. . , . , . . -,
j USNRC MONTHLY OPERATING REPORT Docket No: 50-361 i SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: May 13,1997 April 1997 Completed by: C. E. Williams Telephone: (714) 368-6707 Page 2 of 5 '
l AVERAGE DAILY UNIT POWER LEVEL i Ave. Daily Power Level Ave. Daily Power Level Day (MWe Net) Day (MWe Net) ,
$% M W348lQd$1*;g 31M jfW ll11107 , ,, ;
, 2 804. 18 1109.
13p M 9 R 974h % wr d191 >
, 411064 "
4 1108. 20 1108. i xSE ; n1152 41 121.0 :!!1107S J '4 6 1162. 22 1107. j ;
' ~
17Ji
~ '
, W1111;' ', , (23j W g d110 Q gg ,?I-8 1112. 24 1108.
. -a
!9" gy 01111!
[25 ', M W i 11076f 10 1109, 26 1103. >
411h (11095 f.274 in d109;i 2 l 12 1107. 28 1108.
s1Si J1109J <
- L291 lg ,
iii.107f .
l 14 1111. 30 1059.
^
(16;; L1111J >W 16 1111.
t i
4 7
- - - ~ ,
USNRC MONTHLY OPERATING REPORT Docket No: 50-361 :
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: May 13,1997 April 1997 Completed by: C. E. Williams Telephone: (714) 368-6707 Page 3 of 5 j SHUTDOWNS AND POWER REDUCTIONS Number > m A a . SNone? ,
Date N/A
- Type'(1)? '/ G ,
m ,
?N/As F Duration (1) N/A ,
M Reason (2)y , ,
SN/Ai Method of shutting down reactor (3) N/A LER Nos: ,s y
f N/M ' ,
System Code (4) N/A Component Code'(5)e .
30 JN/Abn Cause and corrective action to prevent recurrence N/A l (1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Ope.ator Training & License Examinaton F-Administrative '
G-Operabonal Error (Explain)
H-Other (Explain)
(3) Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuaton from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)
(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983 ,
)
V l
l
- +
UCNRC MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 :
UNIT 2 Date: May 13,1997 l April 1997 Completed by: C. E. Williams
, Telephone: (714) 368-6707 Page 4 of 5
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event N1/5% [bb0h, 1, 8 retorpwer, q 0 We,4 {21 of a WWO%)
outage.^ - - -
// -
Unit 2 synchronized to the grid ending Cycle 9 Refueling Outage at 121 days.
4/1/97 0040 (4/2I97:P .0150{ dhit 2 at 80'4p<lSsauhiNsaf TisEnd[Phy>sicitsh!hs[# ,
m .
w.; .
c-Reactor Engineering released 80% power plateau hold and approved power ramp 4/2/97 1756 ,
to full power at < 3% per hour.
- J4/3/976 (23301 Unit-2 at 99.6% reactor' power? 1160 MWeh , , sm ,
4/6/97 0100 Change from standard time to daylight savings time.
- 4/30/969 24001 ' Mode ~ le99.74 reactor power?1162 MWe?29.3 EEPD s N:te: There were no challenges to the pressurizer or main steam system safety valves during the month.
I
USNRC MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: May 13,1997 April 1997 Completed by: C. E. Williams
! Telephone: (714) 368-6707 ]
Page 5 of 5 ;
i REFUELING INFORMATION ;
- 1. Scheduled date for next refueling shutdown: Approximately January 1999.
- 2. Scheduled date for restart following refueling: Approximately March 1999.
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment? -
Unknown at this time for Cycle 10.
What will these be?
N/A
- 4. Scheduled date for submitting proposed licensing action and supporting l Information. ,
N/A
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance anal methods, significant changes in fuel design, new operating procedures. ysis .
N/A
- 6. The number of fuel assemblies. ,
A In the core 4 217-B. In the spent fuel storage 870 pool:
800 1
Unit 2 Spent Fuel Assemblies 0 Unit 2 New Fuel Assemblies 70 Unit 1 Spent Fuel Assemblies Ch in the .New Fuel Storage f0
, Rack M 'N
- 7. Licensed spent fuel storage capacity: 1542 Intended change in spent fuel storage capacity: None
- 8. Projected date of last refueling that can be discharged to spent fuel stc, rage pool
. assuming present capacity.
January 2006 (assuming 22 month fuel cycles for all future cycles, and Unit 1 fuel remains where it is currently located).
4 I i
1 l
l l
l
)
l l
Enclosure 2 ,
r
(.
NRC Monthly Operating Report, April 1997 San Onofre Nuclear Generating Station, Unit 3 "
s r
1 4
I
(
h I
i
?
t
l
.. 1
. j
.e, .
i
, USNRC MONTHLY OPERATING REPORT : Docket No: 50-362 ,
j SAN ONOFRE NUCLEAR GENERATING STATION . Unit Name: SONGS-3 I UNIT 3 Date: May 13,1997 -;
April 1997 Completed by: C. E. Williams >
Telephone: (714) 368-6707 I
Page.1 of 5 ;
OPERATING DATA REPORT ,
- i j til UcensedThennel Power.(MWt) : a 'e' ^ " i er / W ' :)
~
W3390h % ;
1 2 Nameplate Rating (Gross MWe) 1127 j L ?38 DesignElectrieelStaling'(Net.MWe)bWsus *R ' /Mh Ma ** Mas 1000P : !
l 4 Maximum Dependable Capacity (Gross MWe) 1127.
f54 Maximum Dependable C6pacityiNet.MWe) v w m A#2 d@ ? 0080M - :
6- If changes occurred in items 1 through 5 since last report, give reason. None l
! 574 Powerlevel~(Not'MWo)toLwhicf1 restricted!!f enpF*%e Ee* %* >
4NfASW '
) ~8 Reason for restriction, if any. N/A a 1 This Month Yr-to-Date Cumulative f 29] Number lofHoursiriPoriod%emWW 'HM7,198# < 128791 < g, E1M678 > >
j 10 Number of Hours Reactor Was Critical 263.9 2423.9 92,716 i 11 1! ReactorRosene Shutdown HoursicW% . M0;0sy WW0.0?% T40:03 %
l ,,_12 Hours Generator On-line 263.8 2,423.8 90,958 i (13 Unit' Reserve l Shutdown Hours hm 10.0 % +
4;0.0 F ,; e s0:0 P , ,
14 Gross Thermal Energy Generated (MWh) 889,901 8,112,932 294,252,414
. !15; Gross Electrical Energy Generated'(MWh)b 8 291;109i i2,737;128; (!99,818,336s4 ;
16 Net Electrical Energy Generated (MWh) 271,906 2,594,214 94,372,225 ;
! 117c .Un6t Service Factoru dW%Mi ^ > 1836.7%W 084.2%i s emM79.3%4 a l 1
' 18 Unit Availability Factor 36.7 % 84.2 % ~ 79.3% ,
l
?1 90 . Unit Capacity Factor (Using' MDC. Net)? .
?35.0%ts < 183:4%N 4 176.2%k 20 Unit Capacity Factor (Using DER Net) 35.0 % 83.4 % 76.2 %
[
121i ' Unit Forced Outage Ratee (0.0%F bs0.0%b '
t5.0E We
- 22. Shutdowns scheduled over the next 6 months (type, date, and duration of each):
Refueling shutdown (U3C9), April 12,1997, 75 days ,
- 23. If shutdown at end of report period, estimated date of startup: June 26,1997 !
- 24. Units in test status (prior to commercial operation): Forecast Achieved Initial criticality N/A N/A ;
- Initial electricity N/A N/A
. Commercial operation N/A N/A t .
1 i.
i I
1
--.-._d e-.a e- 7 *r +e w -'7e T
,. a US6fRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 UNIT 3 Date: May 13,1997 April 1997 Completed by: C. E. Williams Telephone: (714) 368-6707 Page 2 of 5 AVERAGE DAILY UNIT POWER LEVEL Ave. Daily Power Level Ave. Daily Power Level Day (MWe Net) Day (MWe Net) 116 110741 '- lt17s 4
-10h ,
2 1073. 18 0 ir31 #1072/ W ?:194 '@ ?:01i-4 1073. 20 0 15:: (1073? ?21J! W - [0! -
6 1120. 22 0
?:7(: 1104.5 , n23;l s s01 -
8 1073. 24 0
- 9i ~ ~ 11071E 1251 M " iiO:s 10 1054. 26 0 tiii- '47731 1271 i:LO! < , * '
12 0 28 0
!133
'^
i0i:
- 291 F0s^ -
14 0 30 0 t15L , :02 ' ,
16 0 i
I
., "?
USNRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 UNIT 3 Date: May 13,1997 April 1997 Completed by: C. E. Williams Telephone: (714) 368-6707 Page 3 of 5 UNIT SHUTDOWNS AND POWER REDUCTIONS Number .m~ m -
M ,-
493? >
Date April 12,1997 Type ~(1)? M 4 ,
s a -
1 S(Scheduled)) *'#
Duration (Hours) 455.2 Reason (2)i; -
w H -
n:C(Refueling)?
- Method of shutting down reactor (3) 2(Manual)
LER NoA
' !!N/At se e System Code (4) N/A Ceirspenent Code ~(5)? M 4
- M' , 4 4 * 'f:N/Ai '
Cause and corrective action to prevent recurrence N/A
- 1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)
B-Maintenance or Test C Refueling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administratke G-Operational Error (Explain)
H-Other (Explain)
(3) Method. 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain) 1 (4) IEEE Std 805-1984 (5) lEEE Std 803A-1983
- This shutdown also included a down power for heat treat prior to shutting down. See Summary of Operating Experience for the month (page 4). l 1
l l
l
=,, : '5
.o
- US,NRC MONTHLY OPERATING REPORT Docket No: 50-362 >
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 ,
UNIT 3 Date: May 13,1997 April 1997 Completed by: C. E. Williams :'
i Telephone: (714) 368-6707 Page 4 of 5
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event '
f4/1/976' f000ti Modo!.11st -,-97 $p%39Freactorpowardl~123 MWsF521!5 EFPD ,
4/6/97 0100 Change from standard time to daylight savings time. ;
r4/10/97n 2213a C= - ^+1 power reduction to 79%for heat erset. : "
in 2 w l 4/11/97 0800 Unit 3 at 79% power for heat treat.
L A/II/976 tl554e Completed Unit:3 heattreat. -
a< w as '
Commenced reactor shutdown at 20% per hour to remove Unit 3 from :
4/11/97 2109 service for refueling outage. 1 1
14/12/974 0046n irrispedUnit 3 main tubine at 50 MWe and besan U3C9 a r aah* outase- l
-4/12/97 0053 Tripped Unit 3 reactor from 12% power. ;
14/12/97e 1444 7 Unit 3 entered Mode 4Ma ~ e - * , ;
4/13/97 0535 Unit 3 entered Mode 5. :
i4/17/974 07116 Unit 3 entered Mode 65 : v e m,< r + <
j 4/28/97 10J5 Unit 3 reactor vessel defueled. Core off-load completed. _ l 24/30/971 a24003 Unit 3 defueled. days 18 of a planneds75 day outane in oroaress. ~ -
Note: There were no challenges to the pressurizer or main steam system safety valves l during the month. i
., '3 USNRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 UNIT 3 , Date: May 13,1997 ,
April 1997 Completed by: C. E. Williams Telephone: (714) 368-6707 Page 5 of 5 REFUELING INFORMATION
- 1. Scheduled date for next refueling shutdown: April 12,1997.
- 2. Scheduled date for restart following refueling: June 26,1997
- 3. Will refueling or resumption of operation thereafter require a Technical !
Specification change or other license amendment?
Yes What will these be?
Change to SR 3.8.1.8 Offsite Power Testing (PCN 483)
- 4. Scheduled date for submitting proposed licensing action and supporting information.
PCN 483 Submitted April 15,1997.
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis ;
methods, significant changes in fuel design, new operating procedures.
Increase in fuel enrichment.
- 6. The number of fuel assemblies.
AA in the core s to B. In the spent fuel storage pool: 1135
- Unit 3 Spent Fuel Assemblies 917 '
Unit 3 New Fuel Assemblies 100 Unit 1 Spent Fuel Assemblies 118 C/ Ia~ the New Fuel Stormae Rack 4 10
- 7. Licensed spent fuel storage capacity: 1542
. Intended change in spent fuel storage capacity: None j l
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool I assuming present cap.acity.
May 2006 (full off-load capability assuming 22 month fuel cycles for all future ,
cycles, and Unit 1 fuel remains where it is currently located).
)