-m NRC MONTHLY OPERATING REPORT SAN'ONOFRE NUCLEAR GENERATING' STATION, UNIT 3 l
DOCKET NO:
50-362 UNIT NAME:
SONGS - 3 DATE:
February 14, 1997 l'
l COMPLETED BY:
C.
E. Williams TELEPHONE:
(714) 368-6707 OPERATING STATUS l
1.
Unit Name:
San Onofre Nuclear Generating Station, Unit 3 i
2.
Reporting Period:
November 1996 i
3.
Licensed Thermal Power (MWt) :
3390 4.
Nameplate Rating (Gross MWE):
1127 S.
Design ~ Electrical Rating (Net MWE) :
1080
- 6. Maximum Dependable Capacity (Gross MWE):
1127 7.
Maximum Dependable Capacity (Net MWE) :
1080 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
'Since Last Report, Give Reasons:
NA
'9.
Power Level To Which Restricted, If Any (Net MWE) :
NA i
- 10. Reasons For Restrictions, If Any:
NA
^
Y This Month Yr.-to-Date Cumulative
{
I
- 11. Hours In Reporting Period 720.00 8,040.00 111,048.00
- 12. Number Of Hours Reactor Was Critical 720.00 7,611.48 89,548.18
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 t
- 14. Hours Generator On-Line 720.00 7,570.67 87,790.31 l
[
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 l
- 16. Gross Thermal Energy Generated (MWH) 2,366,451.65 25,142,938.56 283,642,437.96
- 17. Gross Electrical Energy Generated (MWH) 801,454.50 8,475,107.50 96,234,577.50 i
- 18. Net Electrical Energy Generated (MWH) 761,507.37 8,034,192.58 90,973,556.14 i
- 19. Unit Service Factor 100.00%
94.16%
79.06%
f
- 20. Unit Availability Factor 100.00%
94.16%
79.06%
- 21. Unit Capacity Factor (Using MDC Net) 97.93%
92.53%
75.85%
i
- 22. Unit Capacity Factor (Using DER Net) 97.93%
92.53%
75.85%
l
- 23. Unit Forced Outage Rate 0.00%
0.00%
5.14%
- 24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each).
Refueling shutdown,-April 5, 1397, 70 days
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
NA j
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved j
INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
[
[