4 NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT NAME SONGS - 2 DATE 9/15/84 (as revised 3/15/84)
COMPLETED BY C. A. Morris TELEFHONE (714) 492-7700 Ext. 56264 OPERATING STATUS 1.
Unit Name: San Onofre Nuclear Generating Station, Unit 2 2.
Reporting Period:
8 August 1983 through S1 August 1983 3.
Licensed Thermal Power (MWt):
3,390 4.
Nameplate Rating (Gross MWe):
1,127 5.
Design Electrical Rating (Net MWe):
1,070 6.
Maximum Dependable Capacity (Gross MWe):
1,127 7.
Maximum Dependable Capacity (Net MWe):
1,070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 576 576 576
- 12. Number Of hours Reactor Was Critical 576 576 576
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 576 576 576
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,905,209 1,905,209 1,905,209 17.' Gross Electrical Energy Generated (MWH) 659,758 659,758 659,758
- 18. Net Electrical Energy Generated (MWH) 641,628 641,628 641,628
- 19. Unit Service Factor 100 100 100
- 20. Unit Availability Factor 100 100 100
- 21. Unit Capacity Factor (Using MDC Net) 104.1 104.1 104.1
- 22. Unit Capacity Factor (Using DER Net) 104.1 104.1 104.1
- 23. Unit Forced Outage Rate 0
0 0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
18-month Surveillance Outage, November 15, 1983,- 1-month duration.
25.
If Shut Down At End Of Report Pcriod, Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 8403200091 840315
~
DR ADOCK 05000361 PDR
AVERAGE DAILY UNIT POW 5R LEVEL DOCKET NO.
50-361 UNIT SONGS - 2
-DATE 9/15/83 (as revised 3/15/84)
COMPLETED BY L. Mayweather s
TELEPHONE (714) 492-7700 Ext. 56264 s
NONTH August 198_3 s
DAY AVERAGE DAILY 'PbWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 NA 17 1127.67 2
NA 18 1114.46 3
NA 19 1082.60 4'
NA -
20 948.33
_~
'S NA 21 1115.73 6
NA 22 3_069.67 7
Nd 23 1123.69 8
1132.50 24 1134.52 s
9_
^1073.33 m
25 1137.00 m
3 10 1107.29 26 1099.98 11 1Q3.75 27-1075.85 m
12 1115.71 28, 886.67
~
.29 1115.83 13 1130.42 s
s 14
- 1126.79
.30
-1137.50 15 1125.58 31 2
1117.92 m
16 1111'.88 i -
0565u
..b 5
~.
~
, (
'e
)
}>
's
-s s3 5
f,,'
3 r
s i"
8
~.
m.
t l
l I! NIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-361 UNIT NAME SONGS - 2 i
REPORT MONTH AUCUST, 1983 DATE 09/15/83 fas j
revised 3/15/84)
COMPLETED BY L. Mayweather TELEPHONE (714) 492-7700 Ext. 56223 Method or Shutting Dura tion Down LER System Component Cause & Corrective 1
2 3
4 5
Action to No.
Date Type
,(Hours)
Reason Reactor No.
Code
. Code Prevent Recurrence NA-NA NA NA NA NA NA NA NA NA i
i l
i.
L i
l i
1 2
3 4
' F-Fo rced Reason:
Method:
Exhibit F - Instructions S-Scheduled A-Equipment Fa ilure (Expla in) 1-Manual for Prepa ration of DM.a B-Ma ir.tenance or Test 2-Manua l Scram.
Entry Sheets for Licensee C-Rerueling 3-Automa tic Scram.
Event Report (LER) *8 le D-Regulatory Restriction 4-Continuation from (NUREG 0161) i E-Operator Training & License Examination Previous Month F-Admin i st ra t ive 5-Reduction of 20%
5
' G-Ope ra t i ona l Error (Expla in) or greater in the Exhibit H-Same Source H-Other (Enla in) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0565u 6-Other (Expla in) i E
i e
k