ML20133M436

From kanterella
Jump to navigation Jump to search
Revised MOR for Sept 1996 for SONGS Unit 3
ML20133M436
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/30/1996
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20133M403 List:
References
NUDOCS 9701220389
Download: ML20133M436 (1)


Text

_ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ . - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _

_y-s UNIT SHUTDOWNS AND POWER REDUCTIONS - Corrected ,

DOCKET NO: 50-362 UNIT MAME: SONGS - 3 .

REPORT MONTH: Sectember 1996 DATE: January 15. 1997 COMPLETED BY: C. E. Williants TELEPHONE: (714) 368-6707 1

Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2 Reactor 3 No. Code' Code 5 Prevent Recurrence 93 9/24/96 S 164.3 A 1 96-004* AB TW Investigate l unidentified RCS leakage and repair failed RCS thermowell.

  • This LER reauired due to cressure boundary leakace 2

F-Forced 2 Reason: " Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. 'IEEE Std 803A-1983 C-Refueli

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other (Explain) 9701220389 970115 PDR ADOCK 05000361 R PDR 3

_ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ - _ _ _ _ _ _ _ - _ - - -. - __