ML20053C928

From kanterella
Revision as of 21:05, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Physical Security & Safeguards Contingency Plans. Plans Withheld (Ref 10CFR73.21)
ML20053C928
Person / Time
Site: Satsop
Issue date: 05/26/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GO3-82-535, NUDOCS 8206030175
Download: ML20053C928 (2)


Text

. .

l

  • l Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 Docket Number 50-508 May 26, 1982 G03-82-535 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-3/5 PHYSICAL SECURITY AND SAFEGUARDS CONTINGENCY PLANS Please find anclosed five (5) copies etch of the WNP-3/5 Physical Security and Safeguards Contingency Plans submitted in accordance witn requirements of10CFR50.34(c)(d).

The enclosures contain Safeguards Information concerning detailed security measures for the protection of Supply System facilities in which special nuclear material will be used. This information is to be protected in accordance with 10CFR73.21.

Should you hve any questions concerning this submittal, please do not hesitate to contact me.

b G. D. Bouchey Deputy Director, Safety & Security JWK:pm

Enclosures:

WNP-3/5 Physical Security Plan (5 copies)

WNP-3/5 Safeguards Contingency Plan (5 copies) cc: W. Albert, Nuclear Regulatory Commission (w/o enclosure)

CR Bryant, Bonneville Power Administration (w/o enclosure)

NS Reynolds, Debevoise & Liberman (w/o enclosure)

  1. \

$5 8206030175 820526 DR ADOCK 0500050s t PDR

psN/~3/C hy5/C4l STATE OF WASHINGTON

Subject:

7 COUNTY OF BENTON ) Y I, G. D. B0UCHEY, being duly sworn, subscribe to and say that I am the Deputy Director, Safety and Security, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; that to the best of my knowledge, information and belief the statements made in it are true; and that the attached Physical Security Plan and Safeguards Contingency Plan contain safeguards infonnation which will be protected in accordance with 10CFR73.21.

DATE 6 -27 , 1982 f>9 D sue $to G'. D. BOUCHEY, Dep g Director Safety & Security On this day personally appeared before me G. D. B0UCHEY to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under nly hand and seal this 47 M day of '/72nu , ,1982.

I heCLL Notary Public in and for the State of Washington Residing at nXEaMed

. .