ML20214P439
| ML20214P439 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 11/19/1986 |
| From: | Olson P WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| GO3-86-584, IEB-86-002, IEB-86-2, NUDOCS 8612040205 | |
| Download: ML20214P439 (3) | |
Text
..A.
.U M
'd ?,
, qi-G.
-:$h, og Washington Public Power Supply System h
5 Box 1223 Elma, Washington 98541-1223 (206)482 4428
'].
O
,v
_g November 19, 1986 G03-86-584 Docket No. 50-508 U. S. Nuclear Regulatory Ccmmission, Regiori V Attention: Mr. J. B. Martin, Regional Administrator Office of Inspection and Enforcement 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368
Subject:
NUCLEAR PROJECT 3 RESPONSE TO IE BULLETIN 86-02
" STATIC 'O' RING DIFFERENTIAL PRESSURE SWITCHES"
Reference:
NRC IE Bulletin 86-02:
" Static 'O' Ring Differential Pressure Switches", dated July 18, 1986.
The referenced IE Bulletin requested that holders of Construction Permits submit a report describing the actions taken or planned regarding SOR Series 102 or 103 differential pressure switches installed as electrical equipment important to safety.
The Supply System has confirmed aat there is no present nor planned future use of SOR Series 102 or 103 differential pressure switches in electrical equipment important to safety in WNP-3.
The Supply System is transmitting this response to fulfill the requirements of the subject IE Bulletin.
l eth2o;gg ethbyge G
ffll-
's U. S. Nuclear Regulatory Commission, Region y G03-86-854 Attention: Mr. J. B. Martin, Regional Administrator November 19, 1986 Page Two If you have any questions, please contact Mr. D. W. Coleman, WNP-3 Project Licensing Manager, Ext. 5436.
/,
s ]b.u D. O n
s WNP-3 Program Director, (760)
MKH/cae Attachment cc: Mr. J. A. Adams, NESCO Mr. M. F. Barnoski, Combustion Engineering Mr. R. M. Boucher, Pacific Power & Light Co.
Mr. W. L. Bryan, Washington Water Power Co.
Mr. G. Dick, NRC Mr. R. E. Dyer, Portland General Electric Co.
Mr. W. J. Finnegan, Puget Sound Power & Light Co.
Mr. J. R. Lewis, BPA Mr. N. S. Reynolds, Bishop, Liberman, Cook, Purcell and Reynolds Mr. D. Smithpeter, BPA Ms. R. M. Taylor, Ebasco, Elma Document Control Desk - U. S. NRC t
l l
5 NUCLEAR PROJECT N0. 3 STATE OF WASHINGTON-
)
Subject:
-RESPONSE TO IE BULLETIN 86-02
)
" STATIC 'O' RING DIFFERENTIAL COUNTY OF GRAYS HARBOR )
PRESSURE SWITCHES"
)
I, FAUL D. OLSON, being duly sworn, subscribe to and say that I am the WNP-3 Program Director for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath;. that I have reviewed the foregoing; and that to the best of my knowledge, information and belief.the statements made in it are true.
DATE 19 [l0V6/hh/L
, 1986
/
Ah V
~
Pa D. Olson WNP-3 Program Director On this day personally appeared before me PAUL D. OLSON to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.
t GIVEN under my hand and seal this 19 day of b/om by-1986.
d aJL/
B > >> m I
Notary Public in and for the State of Washington Residing at
[(fng i
l L