Requests Review of Details of Billings for Listed Periods & Transmittal of Copies of Billings for Periods of June 1984 - Dec 1984 & Dec 1984 - June 1985.Questions Delineated in Encl
ML20149M003
Person / Time
Site: Washington Public Power Supply System, Satsop
Issue date: 02/05/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Holloway C
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20149L998 List:
References
GO3-88-031, GO3-88-31, NUDOCS 8802250231
Download: ML20149M003 (4)


Text

= - - - - ,

i Washington Public Power Supply System Box 1223 Elme,WesNngton 98541 1223 (206)482 4429 L February 5, 1988 G03-88-031 Docket Nos. 50-460 .

50-508 gggr Mr. C. J. Holloway, Jr., Chief 'N S; ,.70 Licensing Fee Management Branch -

i- Office of Administration and Resources Management  ! c. '.y ?

U. S. Nuclear Regulatory Commission C~ .

Washington, D. C. 20555

Subject:

NUCLEAR PROJECT N05.1 AND 3 U. S. NRC BILLING FOR OPERATING LICENSE REVIEWS AND INSPECTION FEES References; a) NRC letter (G01-86-002/G03-86-004), G. C. Sorensen to <

William 0. Miller, same subject, dated January 6,1986. l b) NRC letter, C. James Holloway, Jr. to R. B. Glasscock, subject "Invoiced Amounts on 00119 and 00120 for WNP-1 and WNP-3 Operating License Application Review Through June 23, 1984,"

dated October 22, 1987, c) NRC letter, C. James Holloway, Jr. to G. C. Sorensen, dated January 22, 1986.

I d) NRC letter, Reba M. Diggs to G. C. Sorensen, dated April 30,1986.

e) NRC letter, Reba M. Diggs to G. C. Sorensen, dated August 11, 1987, f) NRC letter, Reba M. Diggs to G. C. Sorensen, dated

'tovember 13, 1987.

I In Reference a), the Supply System questioned several items in the first bills for accumulated Operating License (OL) review costs for WNP-1 and WNP-3. The NRC ultimately responded to the Supply System questions in Reference b). The NRC agreed that some of the questioned items in the billings were in error and agreed to refund a total of $363,746.

8802250231 800223 PDR e ADOCK 0%4 j0

.

  • l,l Mr. C. J. Holloway, Jr., Chief G03-88-031 Licensee Fee Management Branch February 5, 1988 Page Two Now that the issue of the first billing is resolved, the Supply System would like to address the details of the billings for the subsequent periods.

In Reference c) and Reference d), the NRC provided the details for the WNP-3 billings for the periods of 6/84-12/84 and 12/84-6/85, respectively.

We do not have the details for the WNP-1 billings for the periods 6/84-12/84 and 12/84-6/85. We request that you transmit copies of the documentation which supports these billings.

In Reference e) and Reference f), the NRC provided the details for the WNP-1 and WNP-3 billings for the periods 6/85-6/86 and 6/86-12/86, respectively.

Our review, of the material that we now have, has resulted in several questions regarding t'+ detail. of the billings. The questions are delineated in the attachment, lease review them and inform us of your disposition.

If you have any questions, please contact Mr. D. W. Coleman, WNP-3 Project Licensing Manager, phone (206) 482-4428 Ext. 5436.

Very truly yours, a 4

/Y ,,, w G. C. So'rensen, Manager Regulatory Programs DWC/cae Attachment I

cc: Mr. J. A. Adams, NESCO Mr. R. M. Boucher, Pacific Power & Light Co. l Mr. W. L. Bryan, Washington Water Power Co. I Mr. W. J. Finnegan, Puget Sound Power & Light Co. '

Mr. C. Goodwin, Portland General Electric Co.

Mr. J. R. Lewis, BPA Mr. N. S. Reynolds, Bishop, Cook, Purcell & Reynolds  ;

Mr. D. Smithpeter, BPA l Ms. R. M. Taylor, Ebasco - Elma i Ebasco - New York '

Document Control Desk, U. S. Nuclear Regulatory Commission l

l J

' I '"

. . e e

SUFF r SYSTEM FEVIEW QUESTIONS OPERATING LICENSE REVIEW BILLINGS FOR WNP-1 AND WNP-3 W N P-- I 6 For each of the following Contractors please describe the work performed and why the costs are charged to WNP-1.

Contragter_ #f_D5-12_/85 12/85-6/8h h/86-1248A INEL (A6493)

  • 5,587 5 1,872 $ 2,667 INEL (06002) 724 0 2,193 INEL (D6018) O O 24 PNL (B2952) 56.283 O O 9 For the period 6/06-12/86, it appears that WNP-1 was erroneously billed $11,984 for INEL contract costs (A6176) associated with Readinuss Review. If so, these costs should have been billed to WNP-3.

WNP-3 4 For each of the following Contractors please describe the work performud and why the costs are charced to WNP-3.

Contractor 6/84-12/84 12L_84-6/85 6/85-12L82 12/85-6/86 6/86-12/86 INEL (A6458) $ 0 $ 0 $ 20 4 0 $ 3,581 INEL (D6002) O O 374 350 2,169 INEL (D6016) O O 350 1.573 91 INEL (D6018) O O O O 24 INEL (A6818) O 447 O O O ORNL (A9463) 2.811 888 2b O O PNL (B2340) 500 500 300 O O PNL (B2544) 100 300 O O O ZSAI (B8011) O 429 59 0 0 0 For the period of 6/86-12/86, WNP-3 was charged $42,032 for USGS review (B8633). The Supply System submitted several responses to NRR Requests for Additional Information regarding near site geology in June 1986. However, a meeting to discuss these responses with the staff and USGS was not held until July 1987. It is not evident that any USGS activity was conducted much earlier than the July 1987 meeting. For this cost, please describe the activity conducted by U5GS and the product received by the NRC.

O As described above, at appears that WNP-1 was erroneously charged

$11.984 for Readiness Review which should have been charged to WNP-3.

If so, please describe the work performed by the Contracto", INEL (A6176).

(> '