Forwards Corrected Page 1 of NRC Forwarding Insp Rept 50-508/88-02 Re Readiness Review Module C3-02 Concrete. Ltr Issued W/O Date Annotated on First Page
ML20153E280
Person / Time
Site: Satsop
Issue date: 08/26/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8809060281
Download: ML20153E280 (2)


See also: IR 05000508/1988002

Text

.

,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2

7

'

.J

.,'.

.

,

AUG 2 61989

l'

Docket No. 50-508

Washingten Public Power Supply System

P. O. Box 968

3000 George Washington Way

Richland,t(ashington 99352

,

ATTN: Mr. D. W. Mazur

Managing Di ector

i

Gentlemen:

'

SUBJECT:

NRC REVIEW OF WASHINGTON NUCLEAR PROJECT NO. 3 (Wt,P-3) READINESS

!

REVIEW MODULE C3-02 CONCRETE - REPORT NO. 50-508/88-02

l

t

Due to an administrative oversight, the subject document was issued without a

!

date annotated on the first page.

Picase replace the first page of the

{

subject document with the enclosed corrected page. We regret any

l

'

inconvenience this may have cained you.

"

l

Sincerely,

h

t@_s AO)N'

Robert J. Pate, Chief.

Reactor Safety Branch

Enclosure:

Ar stated

!

,

cc w/ enclosure:

P. D. Olson, WPPSS

,

L. J. Garvin, WPPSS

!

State of ',tashington

l

,

,

bec w/ enclosure *

I

l

Peoject Inspector

l

Kesident Inspector

l

1

docket file

G. Ceok

8. Faulkenberry

i

l

J. Martin

,

l

T. Foley, NRR

!

,

M. Smith

l

J. Zo111 coffer

l

egM

<dW

I

l

REGION V

f

-

sri g s/ dot RJ ag ,

EST COPY ]

EST COPY ]

l

'YES) / NO

Y

/ NO

]

l

,

>

ff g TO POR ]

[

l

YES 1/ NO

]

l

1\\

I

\\

. < T~ 7 ) /l

8809060281 880826

PDR

ADOCK 05000508

'

I' (' ' ()'

l

Q

PDC

i

'

.

.

y

-

_.

- _ _- _.

._

_ _ _ _ - -

_

_ _ _ _ _ - _ . _ _

ae.

-

umrao sTAvis

e7

NUCLEAR RECULATCRY COMMISSION

-

g

,

monom v

k.....

wnEcE[uNir$nsl$ses

100 22 1988

,

'

.

Docket No. 50-506

'

Washington Public P wer Supply System

P.O. Box g68

i

-

3000 George Washington Way

.

Richland. Washington gg352

.

ATTW:

Mr. D. W. Mazur

Managing Director

,

Sentlemen:

SUBJECT:

  • NRC REVIEW OF WASHINGTON NUCLEAR PROJECT N0. 3 (WNP-3)

READINESS REVIEW MODULE C3-02 CONCRETE - REPORT,NO. 50-508/88-02

[

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on June 1.1987. Periodic

'

inspectiont were conducted at the WNP-3 site while the Module C3-02 activities

l

were in progress, and the resultant findings were discussed with moders of

'

-*

your staff at the conclusion of those inspections. Technical reviews were also

conducted in NRC Region V and Bethesda offices, and the findings from those

(

.

reviews have also been discussed with your staff in conjunction with the field

inspections. The NRC Inspection Reports which document the reviews are

identified in the enclosed report.

!

,

,

Areas contained in the module which were reviewed, examined, and verified are

identified in' the enclosed report. Within these areas, the inspection

verification consisted of selected examinations of procedures and

!

.

representative records, discussions with personnel, observation of activities

'

1.s progress, axamination of completed construction work, and review of your

l

associated licensing commitments.

'

The results of our reviews and inspections are sunnarized in the enclosed

report. Your attention is invited to those matters which will be pursued during

i

future licensing reviews and inspections. These matters triclude'

1.

Acceptable completion of deferred review segments:

2.

Acceptable c.ompletion of planned engineering evaluations identified in the

Module C3-02 Open Items List;

i

,

1

AcceptanceofFSARchange,reques'tsyh,tobesubmittedtoNRCl

l

l

3.

4.

Acceptable completion of corrective w5rk identified in the Module C3-02

j

Open items Lists

i

-

,

,

I

5.

Adequate control of future construction activities that may affect the

.

completed work;

I

E.

Effectiveness of the preservation program for concrete structurest

'

,

!

l

-

l

l

.

- -

- - - - - -

--