Text
.
,
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2
7
'
.J
.,'.
.
,
AUG 2 61989
l'
Docket No. 50-508
Washingten Public Power Supply System
P. O. Box 968
3000 George Washington Way
Richland,t(ashington 99352
,
ATTN: Mr. D. W. Mazur
Managing Di ector
i
Gentlemen:
'
SUBJECT:
NRC REVIEW OF WASHINGTON NUCLEAR PROJECT NO. 3 (Wt,P-3) READINESS
!
REVIEW MODULE C3-02 CONCRETE - REPORT NO. 50-508/88-02
l
t
Due to an administrative oversight, the subject document was issued without a
!
date annotated on the first page.
Picase replace the first page of the
{
subject document with the enclosed corrected page. We regret any
l
'
inconvenience this may have cained you.
"
l
Sincerely,
h
t@_s AO)N'
Robert J. Pate, Chief.
Reactor Safety Branch
Enclosure:
Ar stated
!
,
cc w/ enclosure:
P. D. Olson, WPPSS
,
L. J. Garvin, WPPSS
!
State of ',tashington
l
,
,
bec w/ enclosure *
I
l
Peoject Inspector
l
Kesident Inspector
l
1
docket file
G. Ceok
8. Faulkenberry
i
l
J. Martin
,
l
T. Foley, NRR
!
,
M. Smith
l
J. Zo111 coffer
l
egM
<dW
I
l
REGION V
f
-
sri g s/ dot RJ ag ,
EST COPY ]
EST COPY ]
l
'YES) / NO
Y
/ NO
]
l
,
>
ff g TO POR ]
[
l
YES 1/ NO
]
l
1\\
I
\\
. < T~ 7 ) /l
8809060281 880826
ADOCK 05000508
'
I' (' ' ()'
l
Q
i
'
.
.
y
-
_.
- _ _- _.
._
_ _ _ _ - -
_
_ _ _ _ _ - _ . _ _
ae.
-
umrao sTAvis
e7
NUCLEAR RECULATCRY COMMISSION
-
g
,
monom v
k.....
wnEcE[uNir$nsl$ses
100 22 1988
,
'
.
Docket No. 50-506
'
Washington Public P wer Supply System
P.O. Box g68
i
-
3000 George Washington Way
.
Richland. Washington gg352
.
ATTW:
Mr. D. W. Mazur
Managing Director
,
Sentlemen:
SUBJECT:
- NRC REVIEW OF WASHINGTON NUCLEAR PROJECT N0. 3 (WNP-3)
READINESS REVIEW MODULE C3-02 CONCRETE - REPORT,NO. 50-508/88-02
[
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC on June 1.1987. Periodic
'
inspectiont were conducted at the WNP-3 site while the Module C3-02 activities
l
were in progress, and the resultant findings were discussed with moders of
'
-*
your staff at the conclusion of those inspections. Technical reviews were also
conducted in NRC Region V and Bethesda offices, and the findings from those
(
.
reviews have also been discussed with your staff in conjunction with the field
inspections. The NRC Inspection Reports which document the reviews are
identified in the enclosed report.
!
,
,
Areas contained in the module which were reviewed, examined, and verified are
identified in' the enclosed report. Within these areas, the inspection
verification consisted of selected examinations of procedures and
!
.
representative records, discussions with personnel, observation of activities
'
1.s progress, axamination of completed construction work, and review of your
l
associated licensing commitments.
'
The results of our reviews and inspections are sunnarized in the enclosed
report. Your attention is invited to those matters which will be pursued during
i
future licensing reviews and inspections. These matters triclude'
1.
Acceptable completion of deferred review segments:
2.
Acceptable c.ompletion of planned engineering evaluations identified in the
Module C3-02 Open Items List;
i
,
1
AcceptanceofFSARchange,reques'tsyh,tobesubmittedtoNRCl
l
l
3.
4.
Acceptable completion of corrective w5rk identified in the Module C3-02
j
Open items Lists
i
-
,
,
I
5.
Adequate control of future construction activities that may affect the
.
completed work;
I
E.
Effectiveness of the preservation program for concrete structurest
'
,
!
l
-
l
l
.
- -
- - - - - -
--