Forwards Final Rept of Earthwork Module C3-01 of Facility Const Assurance Program of Facility Readiness Review Program. Earthwork Acceptable & Meets Fsar,Engineering & Const Requirements
ML20211A817
Person / Time
Site: Satsop
Issue date: 09/10/1986
From: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20211A821 List:
References
GO3-86-494, NUDOCS 8610170035
Download: ML20211A817 (3)


Text

-___- - __ __ _____ _ _ _ _ _ _ _ _ . _ _ _ _

A "

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • 3000 George \\'asluirsgtors \\'ay
  • Ricislarsd, \\'asisington 99352 f

DOCKET NO. 50-508 September 10, 1986 G03-86-494 Mr. J. B. Martin Regional Administrator U. S. NRC - Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Mr. Martin:

Sub,J ect: NUCLEAR PROJECT N0. 3 READINESS REVIEW PROGRAM EARTHWORK MODULE NO. C3-01 The Supply System has performed an extensive review of earthwork at our WNP-3 site, and our final report is submitted for your review.

The results of our design and construction reviews are normally expected to be in separate reports dealing with the design aspects and construction aspects of the reviews. In this instance we were able to perform the WNP-3 Engineering and Construction Assurance reviews concurrently and have prepared a module report that includes both the CAP (Construction Assurance Program) and EAP (Engineering Assurance Program) review of earthwork. The EAP and CAP reviews were conducted in accordance with our NRC approved programs and inspected by Region V.

The report concludes that the earthwork completed to date (as described in Section 7.2 of the attached report) is acceptable and meets FSAR, engineering and construction requirements. The module's progress has been periodically reviewed by members of your staff, and a Readiness Review Oversight Committee has also examined the module report. Their assessment of the module is included in the report.

-m '

_ _.=8610170035 860910

}M ADO {050 {;

$&o\

\\

e Mr. J. B. Martin U.S. NRC - Region V G03-86-494 September 10, 1986 Page 2 The Readiness Review staff presented this module to my senior staff and me.

On the basis of our reviews, and the extensive evidence presented in this report, I certify that the completed earthwork at WNP-3 meets regulatory and FSAR requirements.

In accordance with our Readiness Review Program agreements, I am submitting the module report for NRC acceptance of completed earthwork at WNP-3.

ery truly yours,

&Ih D. W. zu Nanag ngJlrector

Attachment:

As stated.

cc: *Mr. J. A. Adams, NESCO Mr. G. T. Ankrum, Nuclear Regulatory Commission

  • Ms. N. Bell, Nuclear Infomation & Resource Services
  • Mr. T. W. Bishop, O'Brien-Krietzberg & Associates, Inc.

Mr. R. M. Boucher, Pacific Power & Light Company Mr. E. W. Brach, Nuclear Regulatory Commission Mr. W. L. Bryan, Washington Water Power Company

  • Mr. S. H. Bush, Ph.D. , Review & Synthesis Associates Mr. H. R. Denton, Nuclear Regulatory Commission
  • Mr. C. Eschels, EFSEC Chairman Mr. W. J. Finnegan, Puget Sound Power & Light Company
  • Mr. R. F. Heishman, Nuclear Regulatory Comission
  • Mr. W. M. Hill, Nuclear Regulatory Commission
  • Mr. E. V. Imbro, Nuclear Regulatory Comission Mr. G. W. Knighton, Nuclear Regulatory Comission
  • Mr. R. V. Laney, Consultant Mr. N. S. Reynolds, Bishop, Libeman, Cook, Purcell & Reynolds
  • Mr. E. Rosolie, Director of Coalition for Safe Power Mr. B. K. Singh, Nuclear Regulatory Comission
  • Mr. S. West, Nuclear Regulatory Comission
  • With Attachment

7 NUCLEAR PROJECT NO. 3.

READINESS REVIEW PROGRAM EARTHWORK MODULE NO. C3-01 STATE OF WASHINGTON )

Subject:

)

County of Benton )

i I, D. W.Mazur, being duly sworn, subscribe to and say that I am the Managing Director for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the

~

foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE 9 10 8 (, ,1986

\

f __

D. W. M naging Director On this day personally appeared before me D. W. Mazur to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this l 0 day of . M ,1986.

90W Q.w

~Nbtary Public On and for th(

State of Washington Residing at cm .