Forwards EGG-NTA-7673, Conformance to Generic Ltr 83-28, Item 2.2.2--Vendor Interface Programs for All Other Safety- Related Components:WNP-1/-3, Final Informal Rept
ML20235M440
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 06/25/1987
From: Roberts E
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML20235M443 List:
References
CON-FIN-D-6002 EWR-164-87, GL-83-28, NUDOCS 8707170198
Download: ML20235M440 (1)


Text

/NEA Idaho National Engineershg Laboratory June 25, 1987 i

Mr. M. Carrington, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO GENERIC LETTER 83-28, ITEM 2.2.2--VENDOR INTERFACE PROGRAMS FOR ALL OTHER SAFETY-RELATED COMPONENTS:

WNP-1/-3," EGG-NTA-7673, JUNE 1987 (FIN D6002) - EWR-164-87 Ref: NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For OLs (Project 3)" (06002) l

Dear Mr. Carrington:

l l

I Transmitted herewith is the above subject report.

The report documents INEL's evaluation of the applicant actions in response to NRC Generic Letter 83-28, Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components.

Based on the applicant submittals and construction suspension, we conclude that this item is closed for these plants until the resumption of the licensing effort.

Very truly yours, GA j

M E. W. Roberts, Manager I

NRC Headquarters Support

^

ACU:gp

Enclosure:

As Stated I

cc:

G. L. Jones, DOE-ID O@

i D. Lasher, NRR-SICB (2) hd k s. {Q 4

1 J. O. Zane, EG&G Idaho, Inc. (w/o Encl.)

gg B70717o198 870625 PDR ADOCK 05000460 i

Nodi A

Pon I

il i hEGtGw..

4 11428 nockvitte pike suite sto nackvitte, Mo 20es2

- _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _