. y Washington Public Power Supply System Box 1223 Elma, Washington 98541-1223 1206)482 4428 g $1 i

,_p November 6, 1986 { g ifp3 G03-86-567 5 E

__5:

W Docket No. 50-508 Mr. J. B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement - Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

NUCLEAR PROJECT 3 REQUIRED ACTIONS IN RESPONSE TO IE BULLETIN 86-03

References:

a) NRC IE Bulletin 86-03: " Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Yalve in Minimum Flow Recirculation Line", dated October 8,1986.

b) Letter (G03-86-146), G. C. Sorensen to H. R. Denton, subject, " Revised Construction Permit Amendment Request",

dated March 10, 1986.

Reference a) requested a written report submitted within 30 days of receipt of the IE Bulletin detailing: 1) whether or not our facility has a single-failure vulnerability in the minimum flow recirculation line of any ECCS pumps that could cause a failure of more than one ECCS Train; and 2) identification of the short-term corrective actions if the problem exists. The IE Bulletin also requested a report within 90 days detailing long-term corrective actions if the probler exists. Due to the construction delay at WNP-3, it is not possible to submit this information at this time. As indicated in Reference b), WNP-3 plans call for a resumption of construction activities in 1994.

Therefore, we plan to provide the requested information after construction restart.

8611180290 861106 PDR ADOCK 05000508 G PDR

!)

1[-ll

.  ; s Mr. J. B. Martin, Regional Administrator G03-86-567 Page Two November 6, 1986 It should be understood that with construction of WNP-3 currently in a long term delay mode, we will not be making any changes prior to restart that will make the implementation of the requirements of Reference a) more difficult.

If you have any questions, please contact Mr. D. W. Coleman, WNP-3 Project Licensing Manager at (206) 482-4428, Ext. 5436.

/

abD.Olson (760)

Program Director, WNP-3 MKH/tn cc: Mr. J. A. Adams, NESCO Mr. M. F. Barnoski, Combustion Engineering Mr. R. M. Boucher, Pacific Power & Light Co.

Mr. W. L. Bryan, Washington Water Power Co.

Mr. R. E. Dyer, Portland General Electric Co.

Mr. W. J. Finnegan, Puget Sound Power & Light Co.

Mr. J. R. Lewis, BPA Mr. N. S. Reynolds, Bishop, Liberman, Cook, Purcell and Reynolds Mr. D. Smithpeter, BPA Ms. R. M. Taylor, Ebasco, Elma Document Control Desk - U. S. NRC

.