ML20082A777

From kanterella
Jump to navigation Jump to search
Forwards WPPSS Nuclear Projects 1,3,4 & 5 Restoration Plan
ML20082A777
Person / Time
Site: Washington Public Power Supply System, Satsop
Issue date: 03/28/1995
From: Counsil W
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082A780 List:
References
GO1-95-0017, GO1-95-17, GO3-95-0071, GO3-95-71, NUDOCS 9504040229
Download: ML20082A777 (1)


Text

g 9

_7 WASillNGTON PUB 13C POWER SUPPLY SYSTEM P.o. Box 968

  • 3000 George Washington Way e Richland, Washington 99352-O%8 e (509)372-5000 March 28,1995 G01-95-0017 GO3-95-0071 Docket Nos. 50-460 and 50-580 U.S. Nuclear Regulatory Commission Attn: Document Control Desk 2

Washington, D.C. 20555

Subject:

NUCLEAR PROJECTS 1 Aht 3 SITE RESTORATION PLAN

Reference:

12tter GO1-95-0004/GO3-95-0026, dated February 3,1995, WG Counsil (SS) to JM Taylor (NRC), " Termination of Washington Public Power Supply System Nuclear Projects Nos. I and 3" In the referenced letter we informed you that we were preparing a Site Restoration Plan for WNP-1 and WNP-3, as well as for the previously terminated projects, WNP-4 and WNP-5.

This plan has been prepared and submitted to the State of Washington Energy Facility Site Evaluation Council (EFSEC). A copy of the finalized plan is attached for your information.

If you have any questions, or desire additional information regarding this matter, please contact Mr. D. W. Coleman at (509) 377-4342.

Very truly yours,

/

./tGfL44 W. G. Counsil (Mail Drop 387)

Managing Director DWC/ml Attachment i

cc:

LJ Callen, NRC RIV KE Perkins, Jr., NRC RIV, Walnut Creek Field Office MM Mendonca, NRR NS Reynolds, Winston & Strawn (w/o)

DA Repka, Winston & Strawn JR Lewis, BPA (399) (w/o)

WL Bryan, Washington Water Power (w/o)

RE Dyer, Portland General Electric (w/o)

JR Lauckhart, Puget Sound Power & Light (w/o)

}

DP Steinberg, PacifiCorp (w/o) 93g4g 9

PDR ADOCK 05000460 A

PDR.