Text

u g< .

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • 3000 George \\'ashington 1%'ay
  • Richland,~ \\'ashington 99352 i

' DOCKET N0. 50-508 June 1, 1987

- G03-87-157 Mr.'J. B. Martin Regional Administrator

< U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Mr. Martin:

Subject:

NUCLEAR PROJECT NO. 3 READINESS REVIEW PROGRAM l CONCRETE STRUCTURES, MODULE C3-02 The Supply System has completed the second module of construction- review in its Readiness Review Program at WNP-3, which is Concrete Module C3-02 of the Construction Assurance Program. The module was conducted in accordance with the NRC approved program and inspected by Region V.

A review team of qualified, experienced professionals confirmed that safety-related concrete completed at the plant before construction delay (as described in the report) is acceptable for safe operation of the plant, and meets construction related FSAR requirements. There are two areas that will require further investigation, however, these will not substantially alter this conclusion on concrete structures. These areas (concrete block walls and structural grouting) received an extensive review but the results were not conclusive. The team's review was carried out by following a well-organized  !

review plan to sample hardware and documentation to sufficient depth for i judging the acceptability of concrete-related construction work.

The module's progress has been periodically reviewed by members of your staff, and by a Readiness Review Oversight Committee. The Oversight Committee has stated that the concrete review was thorough and effective, capable of reaching reliable conclusions. Their assessment is included in the final report.

.8706180119 870601 PDR ADOCK 05000508 A PDR-Th'dl

=

Mr.' J. B. Martin,' Regional Administrator U..S. NRC - Region V:

Page Two

.The Readiness ' Review staff presented this module to my senior staff' and me.

On the basis of our reviews, and the extensive..' evidence presented in this

. report, I certify that- the completed concrete structures (with the noted exceptions) at WNP-3 meet design-and construction requirements.

In accordance with our . Readiness' Review Program agreements, I am submitting the module report for NRC acceptance of completed concrete structures at WNP-3.

Very truly yours, D

.{'

D. W. az Managi Director

Attachment:

As stated.

cc:- See next page.

l l

i

s .

cc: *Mr. J. A. Adams, NESCO

  • Mr. G. Bagchi, Nuclear Regulatory Comission Mr. A. B. Beach, Nuclear Regulatory Comission
  • Ms. N. Bell, Nuclear Information & Resource Services  !

Mr. H. N. Berkow, Nuclear Regulatory Commission

  • Mr. T. W. Bishop, O'Brien-Kreitzberg & Associates, Inc.

Mr. R. M. Boucher, Pacific Power & Light Company Mr. W. L. Bryan, Washington Water Power Company

  • Mr. S. H. Bush, Ph.D., Review & Synthesis Associates Mr. D. M. Crutchfield, Nuclear Regulatory Comission Mr. R. E. Dyer, Portland General Electric Company
  • Mr. C. Eschels, EFSEC Chainnan Mr. W. J. Finnegan, Puget Sound Power & Light Company Mr. A. Hodgdon, Nuclear Regulatory Commission Mr. G. Holahan, Nuclear Regulatory Comission
  • Mr. G. Imbro, Nuclear Regulatory Commission
  • Mr. D. C. Jeng, Nuclear Regulatory Comission Mr. G. W. Knighton, Nuclear Regulatory Commission
  • Mr. R. V. Laney, Consultant
  • Mr. L. Lewis, Nuclear Regulatory Comission Mr. T. O. Martin, Nuclear Regulatory Commission
  • Mr. T. Michaels, Nuclear Regulatory Commission Mr. H. J. Miller, Nuclear Regulatory Commission Mr. F. Miraglia, Nuclear Regulatory Commission Mr. T. E. Murley, Nuclear Regulatory Commission Mr. W. C. Parler, Nuclear Regulatory Commission Mr. N. S. Reynolds, Bishop, Liberman, Cook, Purcell & Reynolds
  • Mr. E. Rosolie, Director of Coalition of Safe Power Mr. F. Schroeder, Nuclear Regulatory Commission
  • Mr. A. Toth, Nuclear Regulatory Comission (3)
  • Mr. G. Vissing, Nuclear Regulatory Commission
  • Document Control Desk - U.S. NRC
  • With Attachment 1

i i

. . , :. . e i

NUCLEAR PROJECT NO. 3 READINESS REVIEW PROGRAM STATE OF WASHINGTON)

Subject:

CONCRETE MODULE NO. C3-02

. )

County of Benton )

l I, D. W. Mazur, being duly sworn, subscribe to and say that I am the Managing Director for the WASHINGTON PUBLIC POWER SUPPLY. SYSTEM, the applicant- herein;

.that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE' b l , 1987-kh.

D. W. Ma(ur g naging Director On this day personally appeared before me D. W. Mazur to me known to be -the individual who. executed the foregoing. instrument and acknowledge that he signed the same 'as his free act and deed for the uses and purposes therein l

mentioned.  !

GIVEN under my hand and seal this le day of u;vtc , 1987.

V

/3ahSw &

Norary Pub ic'ih and ortthe StateofWa{shington 5 Residing a IrAf etm cL/

i l

t .

r