ML20153G423

From kanterella
Jump to navigation Jump to search
Forwards Readiness Review Module C3-02 Concrete Insp Rept 50-508/88-02.Concrete Const Completed at Time of Work Stoppage Deemed Acceptable Assuming Open Items Resolved. Listed Items Will Be Pursued During Future Reviews & Insps
ML20153G423
Person / Time
Site: Satsop
Issue date: 08/22/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20153G428 List:
References
NUDOCS 8809080153
Download: ML20153G423 (4)


See also: IR 05000508/1988002

Text

_______ __ _ _ _ _ _

'

i .

.

0 h bf

Docket No. 50-508

Washington Public Power Supply System

P.O. Box 968

3000 George Washington Way

Richland Washington 99352

ATIN: Mr. D. W. Mazur

Managing Director

Gentlement:

.

SUBJECT: NRC REVIEW 0F WASHINGTON NUCLEAR PROJECT NO. 3 (WNP-3)

READINESS REVIEW MODULE C3-02 CONCRETE - REPORT NO. 50-508/68-02

The NRC has completed a detailed review, inspection, and verification of the

subject rnedule which you submitted to the NRC on June 1,1967. Periodic

inspections were conducted at the WNP-3 site while the Hudule C3-02 activities

were in progress, and the resultant findings were discussed with members of

your staff at the conclusion of those inspections. Technical reviews were also

conducted in NRC Region V and Bethesda offices, and the findings from those

reviews have also been discussed with ycur staff in conjunction with the field

inspections. The NRC Inspection Reports which document the reviews are

identified in the enclosed report.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report. Within these areas, the inspection

verification consisted of selected examinations of procedures and

representative records, discussions with personnel, observation of activities

in progress, examination of completed construction worF, and review of your

associated lice.7 sing comitaents.

The results of our reviews and inspections are sunnarized in the enclosed

report. Your attention is invited to those natters which will be pursued during

future licensing reviews and inspections. These ratters include:

1. Acceptable completion of deferred review segments;

2. Acceptable completion of planned engineering evaluations identified in the

Modul- C3-02 Open Items List;

3. Acceptance of FSAR change requests yet to be submitted to hRC;

4. Acceptable completion of corrective work identified in the Module C3-02

Open Items List;

5. Adecuate control of future construction activities that may affect the

ccepleted work; ,

6. Effectiveness of the preservation program for concrete structures;

,~ 3 ,

8009000153 00082258

jy(-

>

, .

DR ADOCK 050

,/

-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ -

, '.

,

4

1

2

! 7. Acceptable assessment of the impact of future Engineering Assurance Program

] results on adequacy of completed construction work.

l Based upon the hRC review and inspection of those activities identified in the

'

'

module, we have deterinined that concrete construction completed at the time of

work stoppage at WNP-3 is acceptable assuming effective resolution of the open

iter
s identified above. This decision was based upon infortnation currently

l available to the inspectors and reviewers. Should infomation subsequently

' becone available which was not considered during this review or which conflicts

with earlier information, it will be evaluated to determine what effects it v.ay

-

have on the above conclusion.

Please contact us should you have any questions concerning this letter.

4

l Sincerely, '

/*

R er e, f

Reactor Safety Branch

'

Enclosure: Report i;o. 50-508/88-02

i

cc w/ enclosure: P. D. Olson, WPPSS

! L. J. Garvin, WPPSS

I State of Washington

i

.

bec w/ enclosure: Project Inspector

l Resident Inspector

< G. Cook, RV

l B. Faulkenberry, RV

i J. Martin, RV

i docket file

j T. Foley, NRR

l bec w/o enclosure: J. Zo111 coffer

j M. Smith

'

REGION Y

AToth SRichards GBagchi GVissing LRubenstein

f/g/88 6/ /88 7/I2 /88 3/4/88 f//f/88

l -

Il COPY 'i UEST COP) ' . R R

r UEST COPY '. R UEST COPY 'i

j

v

E / NO YE5 / NO ES EST COPY

/ f;0 '_l/(b NO . / NO

v v v -

RPate

,5 d e it Je b / Co k t u tte M C e 3 fe

! T COPY J

l IES / NO ]

!

( TO PDR '

I

JE5 / h0

t

L

__ _ _ - . . _ _ _ _ _ _ _ _ _ .

'

, .

t e

2

l

l Based upon the NRC review and inspection of those activities identified in the

'

module, we h4ve determined that concrete construction co'npleted atthe time of

wrk stoppage at WNP-3 is acceptable assuming effective resolution of the open

items identified above. This decision was based upnn information currently

available to the inspectors and reviewers. Should information subsequently

become available which was not considered during this review or which conflicts

with earlier information, it will be evaluated to determine what effects it may

have on the above conclusion.

l

! Please contact us should you have any questions ccreerning this letter.

$ Sincerely,

,

i Robert J. Pate, Chief

l Reactor Safety Branch

1 Enclosure: Report No. 50-508/88-02

i

cc w/ enclosure
P. D. Olson, WPPSS

1 L. J. Garvin, WPPSS

j State of Washington

! bec w/ enclosure:

l Project Inspector

'

Resident Inspector

l G. Cook, RV

i B. Faulkenberry, RV

'

J. Martin. RV

docket file

) T. Foley, NRR

i

l bec w/o enclosure:

J

J. Zo111 coffer

H. Snith

REGION Y 4 &c;

AToth SRic)ha GBagchi dissing LRube

7/sr/88 75/h/88 ]#/MBB p f//y/88 T/ly/68

i ut:

)

l

hN k0

R ' ate

'

Mf k0 h kf k0 V

kf k0

V

i ES

~

, 6/ /88

REQUESTCOPYj /

YES / NO .

h?oupe e ' s*/. '.V[cds Jy J rM4h

TO R

Csbre9.<c $ lNr1e t om curu ceJ.

v

de fo/! l'./S *Pr

. 'e O' 'f;,

.

6 5

RECEIVED

NRC

REWON V

' DOCUMENT NAME: C3-02 FINAL REPORT

REQUESTER"S ID: WILSON

88 JUL21

--

all : 0'l

AUT:: ~S NAME: A. TOTH

DOCUMENT C0ff!ENTS:

SUBJECT: NRC REfIEW OF WMHINGTON NUCLEAR PROJECT NO. 3 (WNP-3)

READINESS REVIEW MODULE C3-02 CONCRETE - REPORT NO. 50-508/88-02

1. GBagchi . ....... Concur, h 7[N

2. GVissing ............... Concur M 7//I

3. LRubenstein ................. Concur

4. AToth ................. Concur d e8 [ f f' - 9df,!/0