Requests Response to Re NRC Billings for OL Review & Insp Fees
ML20237H479
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 08/07/1987
From: Glasscock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Scroggins R
NRC
Shared Package
ML20237H471 List:
References
G1-87-90, G3-87-244, GO1-87-0090, GO1-87-90, GO3-87-244, NUDOCS 8708250027
Download: ML20237H479 (2)


Text

,

-u Washington Public Power Supply System Box 1223 Elme, Washington 98541 1223 (206)482 4428 August 7, 1987 G01-87-0090/G03-87-244 Docket Numbers 50-460 & 50-508 i

Ronald M. Scroggins, Controller

~

/

U.S. Nuclear Regulatory Commission Washington, D. C.

20555 16 l

Subject:

SUPPLY SYSTEM NUCLEAR PROJECTS WNP-1 AND WNP-3 NRC 81LLINGS FOR OPERATING LICENSE REVIEW AND INSPECTION FEES

References:

a) Letter (G01-87-0009/G03-87-017), G. C. Sorensen to Graham D. Johnson, same subject, dated January 23, 1987.

b) Letter (G01-86-0002/G03-86-004),

G.

C.

Sorensen to William 0. Miller, same subject. dated January 6, 1986.

c) NRC Letter, C.

James Olloway to G. C. Sorensen, dated January 16, 1987, d) CRC letter, Graham D. Johnson to G. C. Sorensen, dated February 6, 1987.

By reference a), we requested that NRC respond to our reference b) letter.

Reference b) had pointed out what we considered to be an error in billing for WNP-3 and asked several questions regarding the details of the billings for both WNP-1 and WNP-3.

NRC indicated in references c) and d) that it was their hope and prciected goal to respond by April 30, 1987.

We have not yet received a response to our questions on the fee billings.

In telephone discussions with members of your staff, we have recently been told that a response cannot be committed to because the NRC still lacks the necessary resources, and that a response to our letter lacks suf ficient priority.

Please advise us what we can do to assist you in responding to our billing questions.

8708250027 e70020 PDR ADOCK 05000460 A

PDR

Ronald M. Scroggins Page Two If you have any questions, please contact D.

W.

Coleman, Project Licensing Manager, at (206) 482-4428, Extension 5436.

f

$444&&

R. B. Glasscock, Director Licensing and Assurance j

DW/tn cc: Mr. J. A. Adams, NESCO l

Mr. M. F. Barnoski, Combustion Engineering, Inc.

Mr. H. N. Berkow, NRC Mr. R. M. Boucher, Pacific Power & Light Co.

Mr. W. L. Bryan, Washington Water Power Co.

Mr. R. E. Dyer, Portland General Electric Co.

Mr. W. J. Finnegan, Puget Sound Power & Light Co.

Mr. G. D. Johnson, NRC l

Mr. J. R. Lewis, BPA Mr. N. S. Reynolds, Bishop, Cook, Purcell & Reynolds Mr. D. Smithpeter, BPA Ms. R. M. Taylor, Ebasco - Elma l

Mr. G. Vissing, NRC

)

Mr. J. B. Martin, Administrator, Region V l

Document Control Desk - U. S. NRC 1

I l

l n.