Safety-related, Response Time Test of Solid State Protection Sys Logic-Reactor,Train B.
ML18087A738
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/24/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.4.005, NUDOCS 8303160585
Download: ML18087A738 (32)


Text

\~L NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

~

  • TEMPORARY ON-THE-SPOT CHANGE (ORANGE)

"......... *. ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

[XJ UNIT 1 PROCEDURENO. __ ~\_'V_'D __--~_\_8_._~~--c_o-"-5~~~-- REV. No. ____ o____ CHANGE No._--'---

DSJ UNIT 2 PROCEDURE NO.  ?.._ (->Q - \ 'C,

  • i.\' CO 5 REV, NO. _ _,O...___ CHANGE NO._...;.__ _

PROPOSED CHANGE: tf\~e... 7. ~~-<!.f S.\ ~Os.\.*. (s.R. '4. '\}. ~\cc..:~ c. \,l\

f\~~ \ £~ - -,

s. a.,..\ (\~+ vv~<'<!..S ~ ~\ti',.._, ~ c..

' ..., c:i

\.::> " ' '

\

e. i' Ml ~ ~

~

Q. ~v...~ *0..v : \enn:~ ....,\<;

0

( °SC'Vv&"- ~""-""je....

\f.I.I) .... \ 1

\\~~I $"<\.-~ <.'..\. S.l REASON FOR CHANGE:

. W\ \\ \:.~

..,,,.. Sc c:;;;;:c v....-r~ ~'f'w..;e* ~ \\,'c,-~ h \::\~~ ~\...- £\...v...\- \)ou;:.t-.l l'.'.:*C \-

<i\s.'+x~l~~ .

\

ACTION TAKEN FOR OTHER UNIT:

cs p,~x..

AUTHORIZATION: 11),~Ja-k-r DdTE

    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY .TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO MEETING NO.

cg]~ fht6fz_

I 7 f I I ¥i2/~z...ATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

B3031605SS--830314 \

PDR ADOCK 05000272 S PDR PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORM AP*l*t REV. 9 .

NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 D

CHANGE TYPE:

ON-THE-SPOT CHANGE rY1 PERMANENT *TEMPORARY

~ (GREENJ (ORANGEJ PROCEDURE TITLE \<_e.s; *EXPIRES:

BILITY TO BOTH UNITS.

~ UNITt PROCEDURE NO. _ _\:......;.~_b=-_-___;\_<t:'.,""'-._..\"""'-"'.-'o.._;c::;.*....;;s;;.___ _ _ _ . REV. NO. Q CHANGE NO. _ _.__ _

1x1 UNITZ PROCEDURENo. _ _=t---"'-"-~-S?-------\....;:~--*-~-'_...;;;.o~c~$-------- REV. NO. Q CHANGE NO. _ _.__ _

PROPOSED CHANGE:

~ "-~e.. ;J..5 s*-\-"'i' :5.:i... ~

C..\.-.~5~ SS S'-\lo 6

?~~~ d..\a S-\-~ -aC\

C.Y-.."""'.....,C\ "2... ~'Si. - \.\ ~ "\ ~:S L\ \le

\B- =l..\-8 "\~- -~+L\

e, s -1.\ d-lc ~S- ~-\

~f'o.~"L '2.\o S\."-f "\ '(,

REASON FOR CHANGE:

Q..\-,,-..~L \"'\:) ~ - 'l~ 8

\o ACTION TAKEN FOR OTHER UNIT:

AUTHO"R IZATION: &kiJrn~

    • SUPERVISOR IN CHARGE
    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH .UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES NO D

D MEETING NO.

ls2_ I~

01 I .-,,1/z.~

/ TE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:

\.....

PERFORMED BY:

SIGNATURE CATE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORM AP*J-t REV, 9

.* NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

D ON-THE-SPOT CHANGE m l3J PERMANENT (GREEN)

  • TEMPORARY (ORANGE)

PROCEDURE TITLE *EXPIRES:

TY TO BOTH UNITS.

~UNIT1 PROCEDURE NO. _ \........ \?_D___-~\__..4(?...._.='.......*-0_0__..s:;;...._*_ _ _ _ _ REV. NO. _ _ o__ CHANGE No._.....__

[31UNIT2 PROCEDURENO.__;.;l.,.;__\)_..;~~--'..;......;~;:;_"l\.....:....._;:o~o.;;.....:S:::;.__ _ __ REV. No: _ _ o_____ CHANGE No. _ __.\_ _

PROPOSED CHANGE: \>P..~<!.... \.~

~Q..Q. s ~~i' <\. \ J,_

~v......_.,...,_{" -\-c.."("\-1°\\~~\.-S

\~\

...\.\.-..~ C.-c.-...; .\-'f'c \.- C,~.,,z_r'>A ~{

'5 ~~~-u <" $\...\ ~ '°" £v....~ ~T".hsocJ s'-'*, \- >r- c::; . . . . . ~ ..... *C\J\ ~-er REASON FOR CHANGE:

    • ACTION TAKEN FOR OTHER UNIT:

AUTHORIZATION:

    • SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES D

NO a~t/wLb___

D MEETING NO.

cru~ /f/:#~

/I I I MANAGER* SALEM GENERATING STATION

~/;;jj~*

RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE

\..: ..

ACTION TAKEN:

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORM AP-3*1 REV. 9

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE: lPD-18.4.005 - RESPONSE TIME TEST OF SSPS LOGIC -

R'EMARKS: Rx 'l'RIP ; TRAIN II B II EEO QA PERF. ENGR. SORC STA. SUPT.

REV SUBMITTED APPROVED REVIEWED APPROVED REVIEWED APPROVED _

l!?JJ~ -:!_ yO!~ 1,~ ~JV....-~yz.:l

~ L..I. ~

I~A>r/ i'i.. ~..?-73 ¥$ffl,-

.A *- WA ...

  • ui.~ '7/'2.1/8'2.

0 "";v\. c .. n. ~/fl\

-~ lkrf/*-~ ... J

  • -**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,.. ......-..-.. ..............._......-......... ._~- . . . ....--~.....*-*"--** - -* **-----*--- --- -- *..

x

  • SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE .

PAGE --=l__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

  • Rx Trip, Train B

1.0 Purpose

1.1 To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil.

1. 2 To obtain the response tim~ from the UV coil to the
  • To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.

2.0

References:

  • ~..-

2.1 Performance Department Manual.

2.2 Reactor Protectio'n System Logic Diagrams - 221050 thru 221065.

2.3 Westinghouse Instruction Manual - Solid State Protection.

2.4 Hagan Interconnection Diagrams - 220000 thru 220092 .

1111 c -001

x lPD-18.4.005 SALEM GENERATING STATION NUMBER -

REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TESTPROCEDURE PAGE _2__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

3.0 Precautions

3.1 Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.

3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive

  • paper is wasted.

4.0 Limitations and Actions:

4.1 None stated

  • I & C
  • 001

. .**.:*o..J--::**.-*r*_.**<."'!*;:**'""" .... "*'T.""**'*.**-*********~* .. - ... -~- . ~ .; .. , , ..

x

  • SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C) REV.NO. ~O~~~~~~~

DATE 5/3/82

~~~~~~~~

TEST PROCEDURE PAGE

- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 5.0 Test Equipment:

Device

  • PD No. Recal. D*ate Visicorder Model 1912 Test Leads & Jumpers N/A N/A Test Resistor for Hagan Input Signals N/A N/A

. Toggle Switches (4) N/A N/A Latern Type 6VDC Battery (2) or Equiv. N/A N/A I & C - 001

      • - * ., ..,.-*** * "<'".; ~ '*' '-.r,*.,-***,-* -~'"* \ ... *-~-,* __ .,,.- .,._,, ~ ,. ,**r-* *",-* ** "'"* *** * ~ ~

x SALEM GENERATING STATION NUMSER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE ~4~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx. Trip, Train B

6.0 Prerequisites

6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).

Senior Shift Supervisor/Shift Supervisor Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The individual assigned to perform this procedure is qualified- to do so in accordance with the Solid State Protection System Qualification Card *

  • Job Supervisor I & C -001
    • * ** - ... ~ *,** .... -. * * ,,_ .. !""_,,.. *;~-**. **:r- .... ,.- -- -.. ---*-- . . . . *' ...... .. - ._,. .. *.. **-** . ....... .. ~;, - ..

X'

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE -"'5__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx.Trip, Train B

6.0 Prerequisites

(Continued) 6.4 The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the i?erformance of this procedure. Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel

. Indication, and Steam Generator Level from the Wide Range Indication.

Control Operator 6.5 Have the Control Operator place the pressurizer level controller in Manual.

Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions *

  • Job Supervisor I & C
  • 001

.. x SALEM GENERATING STATION NUMBER- __;l=P_D_-~1~8~*~4~*~0~0~5~

PERFORMANCE DEPARTMENT (I & C)

REV. NO. 0 DATE 5/3/82 TEST PROCEDURE PAGE _.;..6~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 7.0 System Line-up:

7.1 None stated

  • I & C - 001
  • r ' . * .* ., ,* ** . ' * ~ *~ . * * **

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE* _..7~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

Initial 8.1 Lift the following leads at the NIS cabinet:

8.1.1 Rack 78 - TB123-l 8.1.2 Rack 79 TB223-l

(.s.R, \.\, '-'. ~ \oc. 't:... ~v-T)

  • c.

8.2 Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.

C

~~ 'c~:

\.. .

\..:, C\- \J;:)~\'~<;;; ~ \1~~.,.;::i-

-.-, . * ~

, '"{""'""'~\~ Y1\I\.'\ lo~ eN~""j~"L~~- ~s*e oQ r .,a..__,

~=le.:*.,..,-*

/~:<;*,,.pC...

-*TY't"\\1\i ~\.--

~c c*1-,

.._1:.."'j ~-

A G \~~.-~ - \<.. 1c:,...c\ °T"-T-m:'N'A.\.... 'll;li;;.. C\ B 0Q\.'-.'("C..,._ ~~,..,;,~,.:>- ~'j~ \=\~~ \:>-,.\- '$\.,....,,,,' "0*~-.-.1 ~~~ ?-.\,.:1,_.l'M) 8.3 Place the Input Error Inhibit switch for Train A in the "Inhibit" position.

8.4 Place the Train B Mode Selector switch in the

~Test" position.

8.5

  • Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I.
  • 8.6 Connect Visicorder Channel 1 to the output terminals.

of the Bistable Switch under test as shown in Table 2

    • (115 VAC)
  • I & C
  • 001

., .*. *-*. .. *........ -... *.*~:: '-"""'.- ~;r.~:':'*... *?<*:*:~..-.* *:?. :***,.*:~ .... -.- .... : ... ---... *----.:-- ~ *-** - *** - *. --.. - -~-;- ~

x

    • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE -=8~- OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip,* Train B

8.0 Instructions

(Continued) Initial 8.7 Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.

8.8 Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position

  • 8.9 Adjust the visicorder to obtain a good quality step function trace.

8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.

8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.

8.12 Stop the visicorder after the UV coils are de-energized.

Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference *

  • 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.

I & C -001

~

x SALEM GENERATING STATION NUMBER- lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE __;;_9__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.14 For St~ps 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes *

(Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)

8.14.1 For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633.

. 8.14.2 For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.

NOTE: The UV Coil will remain de-energized for this step.

8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36.

I & C

  • 001

.. x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE ~=5~/3=-<....;/8=2,._~~~

TEST PROCEDURE PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip,* Train B B.0 Instructions: (Continued) Initial B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present. Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes. (Note:

Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when .the power range test signals are above the P7 permissive and reset the rate trip as necessary.)

B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48.

B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.

Increase

.(cloc~wise)

  • the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes. (Note:

Depress BLOCK POWER .RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test

    • signals are above the P7 permissive and reset the rate trip as necessary.)

I & C

  • 001

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE- 11 OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 8.0 Instruction~: (Continued) Initial 8.19 CAUTION: Terminals may be energized (115VAC). Connect channel 3 of visicorder to coil contacts 5 and 6 on K632~ Short terminal 1 to 5 on A.R. timer.

1 8.20 Disconnect the field wires connected to the terminals liste~ in Table 3, Steps 37 through 40 *

  • 8.21 Connect a toggle 'switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.22 Connect visicorder channel 1 across the terminals.

8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40. (For a coincident channel trip, place the toggle switch to OFF.)

8.24 Remove the" toggle switches from termin~ls of Table 3, Steps 37 through 40 and reconnect the field wires.

8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44.

8.26 Connect a toggle switch across each terminal. (Toggle

  • switch in OFF position will produce a trip.)

'8.27 Connect visicorder Channel 1 across the terminals.

I & C

  • 001

I*--

.. x SALEM GENERATING STATION NUMBER -

  • lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C) REV.NO. ~O"--~~~~~~

DATE --=5~/~3~/~8~2~~~~

TEST PROCEDURE PAGE 12 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44. (For a coincident channel trip, place the toggle switch to OFF.)*

8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the

  • field wires.

NOTE: For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the requir~d trip light energizes on the drawer.

8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.

8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56

  • I & C -001

x SALEM GENERATING STATION lPD-18.4.005 NUMBER -

REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial

8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No *.11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power*

Supply M-G Breaker on No. lG 460 VAC bus *

  • Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.

8~34 Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet.

8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the

  • visicorder.

connect a 6VDC latern-type battery.)

(Note: In series with one conductor, I & C - 001

-. **::.****-.:-,***,*:~"'**::: . .

~- ~,, ....-.... ,,,..._.,,_..-.********-***"* ****** . . . . _______ *::.....*_.....:....___,___~-------------

x (_

SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE. 14 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC*-

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56.

To close the trip breaker, place *the Mode Selctor Switch in Operate.

Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33. Place the Mode Selector Switch in Test.

8. 38 CAUTION: Terminals may be energized _( llSVAC)

Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.

-~

~*:r:

8.39 Connect a toggle switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.40 Connect visicorder Channel 1 across the terminals.

8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59. (For a coincident channel trip, place the toggle switch to OFF.)

  • 8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires.

I & C -001

.. x SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C) REV.NO. ~O~~~~~~~

DATE 5/3/82

~~~~~~~~

TEST PROCEDURE PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63.

8.44.Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.)

  • 8.4.5 Connect visicorder Channel 1 across the terminals.

8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63. (For a coincident channel trip, place the toggle switches to OFF.)

8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires

  • I & C
  • 001

x

  • SALEM GENERATING STATION NUMBER-'- lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 16 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal: Initial 9.1 Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.

9.2 Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I

  • 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet.

9.4 Return NIS power range drawers to normal and clear any associated alarms.

9.5 Place the Input Error Inhibit switch for Train B in "Inhibit".

9.6 Place the Mode Selector switch for Train B in the "Operate" position

  • I& c* - 001

.x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18. 4. 005

____;O~~~~~~

___;;5~/~3~/8~2;;__~~~

17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal: (Continued) Initial 9.7 Initiate the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel.

Stearn Line S.I. Block A

  • Pressurizer S.I. Block B

A B

9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.

  • * ' /.J..j1:z.S".;.., ~ n c.~~-"-o~ ~ \"""-:\1,""°N*\.\::. "'f\T-'\ ~.:... ~,-.:;<!~*':)-'"-~ ~ *; c ~c ;"'- A C\.£.\
  • Re.c.cv...>n.:i I!.'--'\- '-.::i~ ..... <_;  : \'.:\ ,,.~*,~ -- o~?> \..?~...u, '"-<t<\~w~*1-.~ e B

El \n:..~,..;;, - \<._ li"J....C\ Tet"r"'~N~\...*'l:r-.L\

9.9 Remove the jumper from TB507-4 and TB507-5 in both TR~IN A and TRAIN B.

9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT .

  • /

I Iii C

  • 001

_ _*_*'_:._** ... *.*::"*~-*-* ,, ...,,.,.:

          • ~-'*--_ .. *_~

~  : '*

x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lPD-18.4.005 0

5/3/82 18 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal: (Continued) Initial 9.11 Reconnect the Leads lifted at the following locations:

9.11.1 NIS Rack 78, TB 123-1 .

9.11.2 NIS Rack 79, TB 223-1

  • C\.\~ i+

S~\:~ \.~ Iv-.; ~-c.C ~\CN

- ~n,~~'"'....._\s

\-"'-.~ 5-y;,\:\-

~ ~'N~ ~

~

\.\cc_\l--..

t f . ._, \i \ s 1:'

C:\'..\ \~

l- \..>-J -M.~o,j \.. ~

\e_ \ N-:O ~\.. ~ .-C.-L 0

'Ce c.s\;o;\\~ ~-)

\ P-.-;-..;,i i

-\-"' '<!_.

')....,.,.,.,~,.;.\

v,.\l.*<i<::... ~\r,.~

Cc"'.:;-\~c \-. 0 \H,. r-.f** ~c'< d:< ~**n.s,. \,\""o.J.L ~ .~. ~s-.:..\-

I & C - 001

- ***.****-*,.*..o:*.****":"-,-.- *.--~*~~---***.---- .. -.... **-~---........... - ' ___ ,, - -.* ~---**

-~- -~

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 19 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx T~ip, Train B 10.0 Remarks: I.O

  • 11.0 Completion:

11.1 Completed By:~~~~~~~~

Technician

  • Date Time
  • 11.2 Approved By: ~~~~~~~~-

Date Time I & C -001 I

x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18. 4. 005

_o_______

5/3/82

~~~-----

20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B.

TABLE I A. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:

I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-421-1 Rack 6 TJ-431-1 Rack 13 TJ-441-1 Rack 15 TJ-412-1 Rack 2 TJ-422-1 Rack 6 TJ-432-1 Rack 13 TJ-442-1 Rack 15 NOTE: To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.

II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-434 *Rack 3 TJ-444 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-435 Rack 7 TJ-445 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 TJ-436 Rack 12 TJ-446 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l TJ-456 Rack 10 TJ-457 Rack 12 TJ-474 Rack 14 IV. STEAM GENERATOR LEVEL

  • TJ-517 Rack 31 TJ-518 Rack 11 TJ-519 Rack 8 TJ-527 Rack 31 TJ-528 Rack 11.

TJ-529 Rack 4 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C

  • 001

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE I (Continued)

B. Install the following Jumpers in SSPS INPUT RELAY BAY:

I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2

  • TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C
  • 001

.X

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lPD-18. 4. 005 5/3/82 22 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERA TURE DELTA T 1 BS-411C 2 TB 1-11&12 BS-441C 15 2 BS-421C 6 TB 2-5&6 BS-441C 15 3 BS-431C 13 TB 3-3&4 BS-441C 15

.4 BS-441C* 15 TB 3-3&4 BS-431C 13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1 TB 1-7&8 BS-474A 14 6 BS-456C 10 TB 2-9&10 BS-474A 14 7 BS-*457C 12 TB 4-1&2 BS-474A 14 8 BS-474A 14 ~B 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9 BS-455A

  • 1 TB 1-1&2 BS-474C 14 10 BS-45 fiA 10 TB 2-3&4 BS-474C 14 11 BS-457A 12 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13 BS-414 3 TB 2-7&8 BS-416 12
  • BS-424 3 BS-425 7 14 BS-415 7 TB 2"".'7&8 BS-416 12 BS-424 3 BS-425 7

.5 BS-416 12 TB 2-3&4 BS-414 3 BS-424 3 BS-425 7 I & C -001

-- .. .............. ~*- *..... -*._ ...*---- _...... ***-**** .. - _.,_ --**-* -- -* .. ** *-*- -* . . .* .

.x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE 0

lPD-18.4.005 5/3/82 23 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL 16 BS-424 3 TB 2-11&12 BS-426 12 BS-414 3 BS-415

. 7 17 BS-425 7 TB 2-11&12 BS-426 12

  • 18 BS-426 12. TB 2-7&8 BS-414 BS-415 BS-424 BS-414 3

7 3

3 BS-415 7 19 BS-434 3 TB 3-3&4 BS-436 12 BS-414 3 -

BS-415 7 20 BS-435 7 TB 3-3&4 BS-436 12 BS-414 3 BS-415 7 21 BS-436 12 TB 2-11&12 BS-434 3 BS-414 3 BS-415 7 -

22 BS-445 7 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7

~

BS-444 3 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 24 BS-446 12 TB 3-3&4 BS-444 3 BS-414 3 I & C -001

x  !

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE. 24 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

.rr'ABLE II STEP ,

BISTABLE RACK TERMINALS COINCIDE~T RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K633 BS-415 7 STEAM GENERATOR WATER LEVEL LOW-LOW 25 BS-517B 31 TB 1-9&10 BS-519B 8 26 BS-518B 11 TB 1-3&4 BS-519B 8 27 BS-519B 8 TB 2~s&6 Bs...:.511B 31 8 BS-527B 31 TB 2-3&4 BS-529B 4 29 BS-528B 11 TB 1-11&12 BS-529B 4 30 BS-529B 4 TB 1-3&4 BS-527B 31 31 BS-537B 31 TB 2-9&10 BS-539B 4 32 BS-538B 11 TB 2-7&8 BS-539B 4 33 BS-539B 4 TB 1-7&8 BS-537B 31 34 BS-547B 31 TB 3-3&4 BS-549B 8 35 BS-548B 11 TB 3-3&4 BS-549B 8 36 BS-549B 8 TB 2-9&10 BS-547B 31

{

I & C

  • 001 I

.* "-*- ..* - ...*.. *-- ****** *******-.:."-...**. '**- "'"'*. ** .: . ~ __ .,_..... _ ....... -~ - . ---~*****--~ .:.-.... ..:. .......:.-~.~ ._::_;._, ** _.,, *.'--~'-~>: :...., .*. *-~-:...:. .***. ~.... ._ .... -.** *:.*

.*x

  • SALEM GENERATING STATION -

PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-1 S. 4. 005

_o_______

5/3/82 25 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE

~

UNDER TEST HAGAN RACK CHANNEL UV COIL K634

-. STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP 25A

  • BS-517B *31 TB 1-9&10 BS-519B 8*

BS-549B* 8 BS-548B 11 6A BS-518B 11 TB 1-3&4 BS-519B 8 BS-549B 8 BS-548B 11 27A BS-519B 8 TB 2-5&6 BS-Sl 7B 31 BS-549B 8 BS-548B 11 28A BS-527B 31 TB 2-3&4 BS-529B 4 BS-549B* 8 BS-548B 11 29A BS-528B 11 TB 1-11&12 BS-529B 4 BS-549B 8 BS-548B 11 3*0A BS-5.29B 4 TB 1-3&4 BS-527B 31 BS-549B 8 BS-548B 11 31A BS-537B 31 TB 2-9&10 BS-539B 4

., BS-538B 11 TB 2-7&8 BS-549B BS-548B BS-539B BS-549B BS 546B 8

11 4

8 11 I & C -001

'x

  • SALEM GENERATING STATION NUMBER- lPD-18.4.005 REV.NO. _O_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE __5~/~3/~8_2________

TEST PROCEDURE PAGE 26 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

  • Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK .CHANNEL UV COIL K634 STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP 33A BS-539B 4 TB 1-7&8 BS-537B 31 BS-549B 8 BS-548B 11 34A BS-54 7B 31 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 35A BS-548B 11 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 36A BS-549B 8 TB 2-9&10 BS-547B 31 BS-529B 4 BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37 BS-414 3 TB 2-7&8 BS-416 12 38 BS-415 7 TB 2-7&8 BS-416 12 39 BS -.A-2-4-"'. L\ I le 12 TB 2- 7-&'S' 3-t L. BS-~'-h</ 3 40 BS-424 3 TB 2-11&12 BS-426 12 41 BS-425 7 TB 2-11&12 BS-426 12J 42 BS-426 12 TB 2-7&8 BS-424 3 43 Bp-434 3 TB 3-3&4 BS-436 12 44 BS-435 7 TB 3-3&4 BS-436 12 5 BS-436 12 TB 2-11&12 BS-434 3 BS-444 3 TB 3-7&8 BS-446 12 47* BS-445 7 TB 3-7&8 BS-446 12 48 BS-446 12 TB 3 -t&-B:-3-\.\ BS-444 3*

I & C *001 \?- <!.

..J c

  • c\-\ \ ..,
x SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)

REV.NO. _o_______

DATE _5~/_3~/_8_2_______

TEST PROCEDURE PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus R TB 109-5 TB 109-6 Channel 3 (F) 38 Bus E TB 209-5 TB 209-6 Channel 3 (F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 40 Bus G TB 407-5 TB 407-6 Channel 1 (H)

~

UNDER FREQUENCY (ABOVE P7)

Bus H TB 108-9 TB 108-10 Channel 3 (F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 Bus F TB 307-9 TB 307-10 Channel 1 (H) 44 Bus G TB 409-1 TB 409-2 Channel 1 (H)

POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202..:7 TB 202-8 --~- N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49 N41 TB 102-9 TB 102-10 N42 so N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41 I & C--001

SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)

REV.NO. _o_______

TEST PROCEDURE DATE

-5/3/82 PAGE' 28 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1

  • TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57 1 TB 109-1 TB 109-2 2 58 2 TB 209-1 TB 209-2 3 59 3 TB 308-1 TB 308-2 1 TURBINE STEAM STOP VALVES 60 1 TB 109-3 TB 109-4 2, 3, 4 61 2 TB 209-3 TB 209-4 1, 3, 4 62 3 TB 308-3 TB 308-4 1, 2, 4 63 4 TB 407-3 TB 407-4 1, 2, 3 I & C *001