Advises That Application for Amend to License NPF-3 Is Being Forwarded Under Separate Cover.Amend Revises Tech Specs, App a Re Implementation of Secondary Water Chemistry Monitoring Program.Class III Fee Encl
ML19253B526
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/03/1979
From: Roe L
TOLEDO EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
541, NUDOCS 7910160366
Download: ML19253B526 (3)


Text

A .

TOLEDO

% EDISDN LOV'ELi. ti. ROE Docket No. 50-346 va ern .~

License No. NPF-3 " * * " " "

Serial No. 541 October 3, 1979 Director of Nuclear Reactor Regulation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Reid:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for amendment to Facility Oper-ating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit No. 1 Technical Specifications be revised as described below. The proposed changes in Appendix A include: 1) deletion of secondary water chemistry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) icgarding impicmentation of a secondary water chemistry monitr ring program.

This amendment request is a Class III request. Enclosed is $4,000.00 as required by 10CFR170.

The attachment identifies the proposed change, its safety evaluation and schedule required to implement the change after NRC approval.

Yours very cruly, j g /

- n l Enclosure bj c/9 ,, q q li. -

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OH:0 43652 9 79101603 b

APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are forty-three (43) copies of the requested change to the Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3 tegether with the safety evaluation for the requested change.

The proposed changes include 1) deletion of the secondary water chem-istry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) regard-ing the implementation of a secondary water chemistry monitoring program.

By __ _

Vice President, Tacilities Development Sworn to and subscribed before me this third day of October 1979.

bct+-~ // -

Notary Public WILLIAM L WINDNAGLE Nctary Public, State of Ohio My Commission Expires October 24.1980

?

PROPOSED LICENSE CONDITION 2.(F) Toledo Edison Company shall maintain in effect and implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. The program shall include:

1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
2. Identification of the procedures used to quantify para-meters that are critical to control points;
3. Identification of process sampling points;
4. Procedure for the recording and management of data;
5. Procedures defining corrective actions for off control point chemistry conditions; and
6. A procedure identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.