A TOLEDO
% EDISDN LOV'ELi. ti. ROE Docket No. 50-346 va ern.~
License No. NPF-3 Serial No. 541 October 3, 1979 Director of Nuclear Reactor Regulation Attention:
Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Reid:
Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for amendment to Facility Oper-ating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.
This application requests that the Davis-Besse Nuclear Power Station Unit No. 1 Technical Specifications be revised as described below.
The proposed changes in Appendix A include:
- 1) deletion of secondary water chemistry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) icgarding impicmentation of a secondary water chemistry monitr ring program.
This amendment request is a Class III request.
Enclosed is $4,000.00 as required by 10CFR170.
The attachment identifies the proposed change, its safety evaluation and schedule required to implement the change after NRC approval.
Yours very cruly, j
l
/
g
- n Enclosure bj c/9 q
q li.
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OH:0 43652 9
79101603 b
APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are forty-three (43) copies of the requested change to the Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3 tegether with the safety evaluation for the requested change.
The proposed changes include 1) deletion of the secondary water chem-istry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) regard-ing the implementation of a secondary water chemistry monitoring program.
By __
Vice President, Tacilities Development Sworn to and subscribed before me this third day of October 1979.
bct+-~
//
Notary Public WILLIAM L WINDNAGLE Nctary Public, State of Ohio My Commission Expires October 24.1980
?
PROPOSED LICENSE CONDITION 2.(F)
Toledo Edison Company shall maintain in effect and implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. The program shall include:
1.
Identification of a sampling schedule for the critical parameters and control points for these parameters; 2.
Identification of the procedures used to quantify para-meters that are critical to control points; 3.
Identification of process sampling points; 4.
Procedure for the recording and management of data; 5.
Procedures defining corrective actions for off control point chemistry conditions; and 6.
A procedure identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.