ML19211C756

From kanterella
Revision as of 03:47, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Updated LER 79-107/03L-1
ML19211C756
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1980
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19211C757 List:
References
NP-33-79-122, NUDOCS 8001140440
Download: ML19211C756 (1)


Text

,

4 3

[* - J TOLFCO

. x a UDiSDN January 8, 1980 L80-016 FILE: RR 2 (NP-33-79-122)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois t1137

Dear Mr. Keppler:

Enclosed is a copy of Licensee Event Report 79-107 with a supplemental infor-mation sheet, which has been revised. The revision to the report is indicated by a "1" in the left margin.

Please destroy your previous copics of this report and replace with the attached, revised copy.

Yours truly, D

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 30 copies LER 79-107, Rev. 1 Mr. Norman Haller, Director Office of Management Program Analysis i/4J, 306 Encl: 3 copies THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8 0 01140 44Q

.