ML20207B364
| ML20207B364 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/24/1999 |
| From: | Campbell G CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 2585, NUDOCS 9903080092 | |
| Download: ML20207B364 (4) | |
Text
n 1
4 e
s==
DaWs-Sesse Nuclear Pbwer Stafion mE=
gn 5501 North State Route 2 Oak Harbor. ohio 43449-9760 Docket Number 50-346 License Number NPF-3 SerialNumber 2585 February 24,-1999 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
- Semiannual Fitness-For-Duty Report, July - December,1998 Ladies and Gentlemen:
Pursuant to 10 CFR 26.71(d), "Recordkeeping Requirements," Toledo Edison submits its semiannual Fitness-For-Duty (FFD) report for the period of July through December 1998, for the Davis-Besse Nuclear Power Station, Unit 1.
' provides Toledo Edison's FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.
Should you have any questions or require additional information, please contact Mr. James L.
Freels, Manager - Regulatory Affairs, at (419) 321-8466.
)
Sincerely, i
- Guy G. Campbell Vice President - Nuclear
/
BJS/s :
g Attachments l
r cc:
A. G. Hansen, NRC Project Manager -
p l-J. E. Dyer, Regional Administrator, NRC Region III do K. S. Zellers, DB-1 Senior Resident Inspector (Acting)
Utility Radiological Safety Board 9903080092 990224 7 PDR ADOCK 05000346 R
PM L
Docket Number 50-346 License Number NPF-3 Serial Number 2585 1
Toledo Edison l
Fitness-For-Duty Report July - December 1998 l
i
)
i i
i 1
i l
l
)
l-l I
- Dpcket Number 50-346 License Number NPF-3 Serial Number 2585 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Toledo Edison December 31.1998 i
Company 6 Months Ending Davis-Besse (419) 321-8466 Location Phone J. L. Freets. Manaaer - Reaulatorv Affairs Contact Name Cutoffs: Screen / Confirmation (na/ml) '
Aooendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04 1
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 89 Unescorted Access 768 0
l Categories Tested Positive Tested Positive Tested Positive Pre-Access 12 0
36 1
)
Post Accident 0
0 1
0 Observed Behavior 0
0 2
0 Random 229 0
20 0
i Follow-up 2
0 5
0 Other 80 0
1 0
Total 323 0
l 65 1/1 Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines clidine to test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short Term Contractors 0
0 0
0 0
1 0
Total 0
0 0
0 0
1 0
1 e
-m
___-._..._.______.__-_.-....m t
l-r
. Docket Number 50-346 i
l*..'
' License Number NPF-3 f
Serial Number 2585 L -
l l
1 6
i l
i TOLEDO EDISON MANAGEMENT ACTIONS f
t RELATING TO FITNESS-FOR-DUTY 1
i I
Toledo Edison Contractor l
Personnel Personnel.
Referred to EAP 0
0 j
Management Sanctions 0
0 j
Toledo Edison does not perform onsite initial drug screening tests; therefore there are no unconfirmed
]
positive results on which to base management actions.
-]
1 1
~!
TOLEDO EDISON i
FITNESS-FOR-DUTY-REPORTS j
There were no Fitness-For-Duty reports submitted during this reporting period (July December 1998).
1-
!1 i
l
-