ML17208A571

From kanterella
Revision as of 00:22, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1978
ML17208A571
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 05/14/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A566 List:
References
NUDOCS 8005120425
Download: ML17208A571 (4)


Text

0'oosiso ~~~

SUMMARY

OF OPERATXNG EXPERIENCE DOCKET NO.- 50-250 Turkey Point UNXT Unit No. 3 DATE Ma 14, 1978 COMPLETED BY V. T. Chilson TELEPHONE 305/552-3824 QEPORT MONTE'pril, 1978 Turkey Point. Unit No. 3 operated at approximately 100% R.P. during the month, except for the outage of Apr'il 19-20, 1978 and the load reductions on April 26 and 28, 1978. Refer to the Unit Shutdowns .

and Power ReductionsSection of the Operating Status report for details.

Major safety-related maintenance performed during the month included inspection of the Rod Control System.

~

SUMMARY

OF ORERATXNG EXPERXENCE DOCKET NO. 50-251 Turkey Point Unit Ho. 4 DATE May 14, 1978 COMPLETED BX V. T. Chilson TELEPHONE 305/552-3824 REPORT MONTH A rxl 1978 Turkey Point Unit No. 4 operated at approximately 100% R.P. during the month except for the load reduction'on April 24-25, 1978 to perform the periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.

No Major safety-related maintenance was performed during the month.

$ Ui~ia 1ARY OK'PERATING EXPERlENCE DOC YiET NO. .50-335 St. Lucie UNIT Unit No. 1 DATE May 14, 1978 COMPLETED BY V. T. Chilson TELEPHONE 305/552-3824

,QEPORT tlONTH April, 1978 St. Lucie Unit No. 1 remained out of service during the month for scheduled refueling, maintenance, and inspection.

Major safety-related maintenance included:

Performance of Steam Generator Tube Inspection Program.

Refueling operation continued. during the month.

0 . w