ML19270F878

From kanterella
Revision as of 19:30, 25 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Annual Environ Operating Rept,1978.
ML19270F878
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/27/1979
From: Jeffery Grant
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19270F879 List:
References
NUDOCS 7903290094
Download: ML19270F878 (1)


Text

wO roteoO

%m ED! SON March 27, 1979 JAMES S. GRANT

- . - . . . . . ,

Docket No. 50-346 ["*;"["';,

License No. NPF-3 Serial No. 1-51 Mr. Jaces G. Keppler Regional Director, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Under separate ccver, we are transmitting two (2) copies of the 1978 Annual Environmental Operating Report for the Davis-Besse Nuclear Power Station Unit No. 1.

The data collected are generally consistent with 1977 and earlier data and do not indicate any unusual conditions for Western Lake Erie and the area surrounding the plant site. None of the operating limits as set forth in the Davis-Besse Unit No. 1 Technical Specifications were e:<ceeded.

_

Yours very truly, ,

1303M00% -

/sn CC: Director, Office of Inspection and Enforcement USNRC, Washington, D. C.

(20 copies)

Director, Office of Management and Program Analysis USNRC, Washington, D. C.

(2 copies)

Ronald L. Ballard, Chief /

'"ision of Safety and Site Analysis l

'

US a Ifashington, D. C.

THE TOLEDO EDISCN COMPANY EDISON PLAZA 300 MADISCN AVENUE TO'. ~00, OHIO 43552