wO roteoO
%m ED! SON March 27, 1979 JAMES S. GRANT Docket No. 50-346
["*;"["';,
License No. NPF-3 Serial No. 1-51 Mr. Jaces G. Keppler Regional Director, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Under separate ccver, we are transmitting two (2) copies of the 1978 Annual Environmental Operating Report for the Davis-Besse Nuclear Power Station Unit No. 1.
The data collected are generally consistent with 1977 and earlier data and do not indicate any unusual conditions for Western Lake Erie and the area surrounding the plant site. None of the operating limits as set forth in the Davis-Besse Unit No. 1 Technical Specifications were e:<ceeded.
Yours very truly, 1303M00%
/sn CC: Director, Office of Inspection and Enforcement USNRC, Washington, D. C.
(20 copies)
Director, Office of Management and Program Analysis USNRC, Washington, D. C.
(2 copies)
Ronald L. Ballard, Chief
/
'"ision of Safety and Site Analysis l
US a Ifashington, D. C.