09/26/2019 Summary of Public Meeting with Southern Nuclear Operating Company to Conduct Technical Discussions on License Amendment Request (LAR)19-001 and LAR 19-017
ML19270G587
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/01/2019
From: Jennivine Rankin
NRC/NRO/DLSE/LB2
To: Jennifer Dixon-Herrity
Office of New Reactors
Rankin J, NRO/DLSE/LB2
References
LAR 19-001, LAR 19-017
Download: ML19270G587 (10)


Text

October 1, 2019 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Jennivine Rankin, Project Manager /RA/

Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON SEPTEMBER 26, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on September 26, 2019. The purpose of the meeting was to conduct technical discussions on License Amendment Request (LAR)19-001, Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification Revision and LAR 19-017, Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML19207A050. The meeting notice was posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:

J. Dixon-Herrity Summary of Meeting:

Technical Discussion on Draft LAR Supplement for LAR 19-001 On September 26, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss a draft LAR supplement for LAR 19-001 regarding protection and safety monitoring system (PMS) surveillance requirement reductions. SNC staff explained the changes that were made as a result of the regulatory audit. In addition, SNC described rescinding the deletion of the channel check surveillance for several PMS functions because they are not fully covered by self-diagnostics. NRC requested clarification of certain changes and provided the following observations:

1. Consider using consistent terminology when referring to self-diagnostic features and functions.
2. Consider clarifying the TS Bases of 3.3.17 to clarify what is normally energized.
3. Consider clarifying which functional requirements are being referred to in TS Bases 3.3.1.8.

In addition, during the discussion, SNC agreed to include the following in the LAR supplement.

1. Provide a summary of the four Component Interface Module CIM self-diagnostics.
2. Correct the proposed language in the Updated Final Safety Analysis Report (UFSAR)

Section 7.1.2.11 to specify applicability to the faults which are detected by diagnostics.

3. Provide additional information on any review of system logs.

SNC noted they intend to submit the formal supplement by October 4, 2019.

In the closed portion of the pre-submittal discussion, SNC discussed the proprietary technical details of the PMS system in relation to the LAR.

Technical Discussion on Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation (LAR 19-017)

On September 26, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss the progress of the staffs acceptance review of LAR 19-017. The LAR requests a change to remove the natural circulation test of the passive residual heat removal (PRHR) heat exchanger, which is conducted during preoperational testing, from the scope of the initial test program. The NRC staff explained that during the acceptance review, the NRC did not find adequate justification for the proposed removal of an initial test and related modification to an Inspection, Test and Acceptance Criteria (ITAAC) requiring the SNC to conduct a PRHR heat exchanger natural circulation test. Staff clarified that natural circulation flow rate was a key system performance parameter and verification of this parameter was important in satisfying Title 10 Code of Federal Regulations (10 CFR) Part 50, Appendix A, General Design Criterion (GDC) 37, Testing of Emergency Core Cooling System, and LAR 19-017 did not justify how this parameter was confirmed for the as built condition. The NRC staff noted that this is important for confirming safety-related natural circulation cooling of the

J. Dixon-Herrity core during a design basis accident not involving loss of coolant and all AP1000 plants are required to do it as part of the initial test program (i.e., this is not a first-of-a-kind test). Although the applicant noted (and the staff agreed) that the forced circulation test is used for continued operability justification to meet GDC 37, initial demonstration represents an important part of meeting GDC 37. The proposed removal of the test would not provide a clear means for demonstrating natural circulation flow.

SNC took an action to reexamine the LAR and determine their next course of action.

Docket Nos.: 52-025 52-026

Enclosure:

As stated cc w/encls: See next page

ML19270G587 *via e-mail NRC-008 OFFICE PM: DLSE/LB2 LA: DLSE/LB2 PM: DLSE/LB2 BC: DLSE/LB2 NAME JRankin* (c) RButler* CPatel* JDixon-Herrity DATE 9/27/19 9/30/19 9/30/19 10/01/19 OFFICE PM: DLSE/LB2 NAME JRankin (s)

DATE 10/01/19

AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, September 26, 2019 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED. (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, September 26, 2019 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Chandu Patel Jennivine Rankin NRO/DLSE Robert Taylor Jennifer Dixon-Herrity Boyce Travis Becky Karas Kevin Coyne NRO/DSER Malcolm Patterson Hanry Wagage Jack Zhao Dinesh Taneja NRR/DE William Roggenbrodt Nancy Salgado Molly Keefe Greg Galletti NRR/DIRS Kerri Kavanagh*

Andrea Kiem Craig Harbuck NRR/DSS Vic Cusumano Representing Industry John Wiesmann*

Bob Hirmanpour Pareez Goloub Adams Quarles*

Michael Elmer*

Amy Chamberlain Stephanie Agee Mark Humphrey*

Neil Haggerty*

Yasmeen Arafeh*

Southern Nuclear Company Eddie Grant*

Dan Williamson*

Steve Merkiel*

Ron Scanlon*

Jonathon Hartmann*

Michael Yox*

Steve Leighty*

Nick Kellenberger*

Steven Unikewicz*

Pamela Fergen*

Enclosure 2

Name Organization Zach Harper*

Rick Paese Westinghouse Electric Company Warren Odess-Gilett*

Members of the Public Marv Lewis Public Georgia Public Service Doug Cheshire Commission

  • = participated via teleconference

Vogtle Units 3 & 4 Mailing List (Revised 08/13/2019) cc:

Southern Nuclear Operating Company, Inc. Resident Inspector Document Control Coordinator Bin N-226-EC Vogtle Plant Units 3 & 4 3535 Colonnade Parkway 8805 River Road Birmingham, AL 35243 Waynesboro, GA 30830 Office of the Attorney General Mr. Barty Simonton 40 Capitol Square, SW Team Leader Atlanta, GA 30334 Environmental Radiation Program Air Protection Branch Resident Manager Environmental Protection Division Oglethorpe Power Corporation 4244 International Parkway, Suite 120 Alvin W. Vogtle Nuclear Plant Atlanta, GA 30354-3906 7821 River Road Waynesboro, GA 30830 Brian H. Whitley 3535 Colonnade Parkway, Bin N-226-EC Anne F. Appleby 42 Inverness Center Parkway, BIN B237 Olgethorpe Power Corporation Birmingham, AL 35243 2100 East Exchange Place Tucker, GA 30084 Mr. Michael Yox Site Regulatory Affairs Director County Commissioner Vogtle Units 3 & 4 Office of the County Commissioner 7825 River Road, Bin 63031 Burke County Commission Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Page 2 of 3

Vogtle Units 3 & 4 Mailing List Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)

MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)

Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)

William.Birge@hq.doe.gov (William Birge) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)

Page 3 of 3