MONTHYEARML24282A9822024-10-0808 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 Passive Residual Heat Removal Actuation Logic Changes License Amendment Request Project stage: Meeting ML24289A2352024-10-15015 October 2024 Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting ML24290A1582024-10-24024 October 2024 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 & 4 Project stage: Meeting 2024-10-24
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24290A1582024-10-24024 October 2024 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 & 4 ML24292A0022024-10-22022 October 2024 Summary of October 16, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Increase Flexibility in Mode Restraints ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24187A0012024-07-17017 July 2024 Summary of Observation Pre-Application Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Revise TS 3.3.8, Engineered Safety Feature Actuation System for Vogtle Electric ML24179A1592024-07-0202 July 2024 June 27, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24149A0742024-06-0101 June 2024 Summary of May 29, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Steam Generator Tube Inspection Report for Vogtle Electric Generating Plant, Unit 1 ML24122C6202024-05-0101 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos.. 50-424, 50-424, 52-025, and 52-026 Meeting Number 20240471 ML24108A0832024-04-19019 April 2024 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML24093A0612024-04-18018 April 2024 April 1, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Proposed Alternative Requests to the Extend Examination Intervals for Joseph M. Farley Nuclear Plant and Vogtle ML24068A0962024-03-18018 March 2024 Summary of 3-7-24, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Co., Inc., Regarding a Proposed License Amendment Request for TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspection ML24025A1372024-01-31031 January 2024 Summary of Observation Pre-Submittal Meeting Held with Snc., Regarding a Proposed Alternative Request - Explosively Actuated Valves for Vogtle Electric Generating Plant, Units 3 and 4 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23313A0952023-11-16016 November 2023 Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML23275A0882023-10-12012 October 2023 Summary of Meeting with Southern Nuclear Operating Company ML23272A1822023-10-11011 October 2023 Summary of September 28, 2023, Observation Pre Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML23230A0212023-08-30030 August 2023 LAR-22-002 Technical Specification 3.8.3 Summary of 08-17-23 Public Meeting ML23187A5742023-08-22022 August 2023 Summary of June 29, 2023, Meeting with Southern Nuclear Operating Company ML23146A1542023-06-0505 June 2023 Summary of May 25, 2023, Meeting with Southern Nuclear Operating Company ML23132A0412023-05-18018 May 2023 Summary of May 11, 2023, Meeting with Southern Nuclear Operating Company ML23121A1692023-05-12012 May 2023 Summary of Meeting with Southern Nuclear Operating Company Vogtle LAR-23-006 U/3&4 More Restrictive Action for TS 3.1.9 Cvs Isolation Valves ML23115A3282023-05-10010 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have a Pre-Submittal Discussion of Draft License Amendment Request (LAR) for Vogtle Electric Generating Plant (VEGP) Unit 3 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML23090A1422023-04-0303 April 2023 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML23065A0732023-03-17017 March 2023 March 2, 2023, Summary of Meeting with Southern Nuclear Operating Company - Vogtle Electric Generating Plant, Unit 4 ML23055A0902023-03-14014 March 2023 February 16, 2023, Summary of Meeting with Southern Nuclear Operating Company ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23037A0032023-02-0606 February 2023 Summary of February 2, 2023, Public Meeting with Southern Nuclear Operating Company ML23012A0512023-01-17017 January 2023 January 11, 2023, Summary of Public Meeting with Southern Nuclear Operating Company (SNC) Regarding Vogtle Emergency Technical Specification Amendment ML22349A2142023-01-0303 January 2023 Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company ML22336A0812022-12-0505 December 2022 Summary of December 1, 2022, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22335A4922022-12-0202 December 2022 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22319A0132022-11-30030 November 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on November 10, 2022 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22271A0182022-10-0404 October 2022 Summary of Public Meeting with SNC on Lessons Learned Final ML22257A2362022-09-19019 September 2022 Summary of September 13, 2022, Partially Open and Partially Closed Pre-Submittal Meeting Held with SNC, Regarding a Proposed OLM License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22243A0302022-09-0909 September 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on August 25, 2022 ML22145A6052022-06-0202 June 2022 Summary of May 24, 2022, Public Meeting with SNC, Regarding a Proposed Alternative Request for Performance-Based Leakage Test Frequencies for the Refueling Water Tank Suction Check Valves for Vogtle, Units 1 & 2 ML22145A4492022-05-27027 May 2022 Summary of May 23, 2022, Public Meeting with SNC, Regarding a Proposed License Amendment Request to Change Technical Specification 3.8.1 and Implement TSTF-163 for Vogtle Electric Generating Plant, Units 1 and 2 ML22131A3422022-05-18018 May 2022 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Requests to Implement Alternate Source Term, TSTF-51, TSTF-471, and TSTF-490 for Vogtle, Units 1 & 2 (EPID No. L-2022-LRM-0033 ML22132A0102022-05-17017 May 2022 Meeting of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding Proposed Accident Tolerant Fuel License Amendment Request and Exceptions for Vogtle Electric Generating Plant, Units 1 and 2 ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML22098A1292022-04-26026 April 2022 Summary of March 31, 2022 Public Meeting with Southern Nuclear Operating Company ML22095A2292022-04-11011 April 2022 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22077A5432022-04-0404 April 2022 Summary of Meeting with Southern Nuclear Operating Co ML22028A0462022-02-0101 February 2022 MTS - Meeting Summary - Pre-Submittal Meeting on January 27, 2022 - Vogtle ATF LAR and Exemption 2024-08-05
[Table view] |
Text
October 24, 2024
LICENSEE: Southern Nuclear Operating Company, Inc.
FACILITY: Vogtle Electric Generating Plant, Units 3 and 4
SUBJECT:
SUMMARY
OF OCTOBER 15, 2024, OBSERVATION PRE-SUBMITTAL MEETING HELD WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC.,
REGARDING A PROPOSED LICENSE AMENDMENT REQUEST TO CHANGE TABLE 3.3.8-1 FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 (EPID L-2024-LRM-0116)
On October 15, 2024, an Observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company, Inc. (SNC, the licensee). The purpose of the meeting was for SNC to describe its plan to submit a license amendment request (LAR) for Vogtle Electric Generating Plant (Vogtle), Units 3 and 4.
SNC is proposing to add to Technical Specification (TS) Table 3.3.8-1 a new T cold - High function to for passive residual heat removal (PRHR) actuation logic at Vogtle, Units 3 and 4.
A list of attendees is provided as an Enclosure.
On October 1, 2024 (Agencywide Document s and Access Management System (ADAMS)
Accession No. ML24275A131), the meeting wa s noticed on the NRC public webpage.
The NRC staff opened the meeting with introductory remarks and a roll call of the attendees.
The SNC representative presented slides contained in ML24282A982 and ML24289A235.
SNC representatives discussed the following topics: (1) background - reason for the proposed change, (2) PRHR heat exchanger (HX) actuation logic, (3) TS 3.3.8 planned change, (4) schedule, and (6) discussion.
=
Background===
SNC representative stated that the reason for the proposed change is to address the Haiyang, Unit 2, event that occurred on October 17, 2018. SNC representative said that the Haiyang, Unit 2, feedwater pump tripped that led to a reactor trip, and a subsequent start-up feedwater (SFW) initiation; this resulted in a decrease in the cold leg temperatures. The Haiyang, Unit 2, operators attempted to prevent a safeguards signal from being generated on T cold - Low-2. This resulted in Low-2 Steam Generator (SG) Narrow Range (NR) level coupled with Low-2 SFW flow, which generated an automatic PRHR HX actuation, reducing T cold further leading to a safeguards actuation.
PRHR HX Actuation Logic
Vogtle, Units 3 and 4, TS 3.3.1 is Reactor Trip System (RTS) Instrumentation. The limiting condition of operation (LCO) 3.3.1 states:
The RTS instrumentation for each Function in Table 3.3.1-1 shall be OPERABLE.
Vogtle, Units 3 and 4, TS 3.3.1 is Engineered Safety Feature Actuation System (ESFAS)
Startup Feedwater Flow Instrumentation. The LCO 3.3.11 states:
Two channels of ESFAS Startup Feedwater Flow - Low 2 instrumentation for each startup feedwater line shall be OPERABLE.
Vogtle, Units 3 and 4, TS 3.3.8 is Engineered Safety Feature Actuation System (ESFAS)
Instrumentation. The LCO 3.3.8 states:
The ESFAS instrumentation channels for each Function in Table 3.3.8-1 shall be OPERABLE.
TS Table 3.3.8-1 has, in part, the following functions:
Number Function 11 RCS [Reactor Coolant System] Cold Leg Temperature (T cold) - Low 2 20 SG [Steam Generator] Narrow Range [NR] Water Level - Low 2 21 SG Wide Range Water Level - Low 2
SNC stated that the current PRHR HX actuation logic is coincidence of 2-of-4 channels below SG NR Water Level - Low-2 in either SG, after a preset time delay, coincident with 1-of-2 SFW flow - Low-2 feeding same SG. SNC said that the current PRHR HX actuation logic is coincidence of 2-of-4 channels below SG Wide Range Water Level Low-2 in either SG.
TS 3.3.8 Planned Change
SNC stated that it planned to add an RCS Cold Leg Temperature (T cold) - High to TS Table 3.3.8-1. SNC said that the proposed P RHR HX actuation logic would be coincidence of 2-of-4 channels below SG NR Water Level - Low-2 in both SGs, after a preset time delay, coincident with 1-of-2 SFW flow in both SGs and coincidence of 2-of-4 channels above T cold -
High in either loop.
SNC stated that no hardware changes are required, except for sequence of events (SOE) cards added in non-safety SOE cabinets. SNC said that it looked at the safety impacts of the loss of a normal feedwater event.
Schedule
SNC representative stated that the proposed LAR is expected to be submitted to the NRC in December 2024 with a request for NRC staff approval within 12 months after the acceptance review. SNC plans to implement the LAR during the spring 2026 refueling outage (RFO) for Vogtle, Unit 3, and the spring 2027 RFO for Vogtle, Unit 4.
Discussion The NRC staff asked the following questions:
Will the addition of Function 11b affect other limiting conditions for operation?
Can SNC describe how the system works?
Can SNC describe other events that are credited for wide range level as referred to on slide 6?
Is the loss of emergency alternating current power and feedwater line break affected by the proposed TS change?
Does the Safety Injection actuation occur for the analysis of the loss of normal feedwater event?
Which Chapter 15 events would be affected by the proposed TS change?
What is the supporting rationale for any assertions that those events are not affected by the proposed TS changes?
For the events that were affected by the proposed TS changes, what are results to demonstrate applicable acceptance criteria are met?
Will the addition of Tcold - High meet single failure criteria?
Will SNC provide its setpoint calculation and uncertainty analysis for T cold - High?
What are the required software changes for T cold - High?
Will SNC use Interim Staff Guidance #6 (ISG-6) for the proposed change?
Can SNC identify any applicable precedent LARs and that the proposed submittal considered?
Did SNC consider precedents (e.g., a simple software-only change to a Common Q (preferably) or any other digital protection system) and the resolution of requests for additional information for those precedents?
Closing Remarks
There were two members of the public in attendance. One public member asked about the decay heat for AP1000.
The NRC staff did not make any regulatory decisions during the meeting. Once received, the NRC staff will perform a thorough review of the proposed LAR. The NRC staff will make any regulatory decisions in writing in a timely manner. Public Meeting Feedback forms were available, but no comments were received.
The meeting adjourned at 11:24 am Eastern Time (ET).
Please direct any inquiries to me at John.Lamb@nrc.gov or 301-415-3100.
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch, II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos.52-025 and 52-026
Enclosure:
List of Attendees
cc: Listserv
LIST OF ATTENDEES
OCTOBER 15, 2024, PRE-SUBMITTAL MEETING WITH SOUTHERN NUCLEAR COMPANY
REGARDING A PROPOSED LICENSE AMENDMENT REQUEST TO CHANGE TABLE 3.3.8-1
VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4
ATTENDEE REPRESENTING
John G. Lamb U.S. Nuclear Regulatory Commission (NRC)
Mike Markley NRC Summer Sun NRC Jo Ambrosini NRC Ravi Grover NRC Bill Truss NRC Scott Egli NRC Michael Fitzgerald NRC Nichols Soliz NRC Angelo Stubbs NRC Brian Griman NRC Theo Fanelli NRC Norbert Carte NRC
Ken Lowery Southern Nuclear Operating Company (SNC)
Ryan Joyce SNC Jim Chamberlain SNC Chris Sommer SNC Michael Coker SNC Kimberly Yennerell SNC Dan Williamson SNC Eddie Grant SNC Neil Haggerty SNC
Thomas Joseph Westinghouse Daniel Wise Westinghouse Kyle Freiberger Westinghouse Ryan Rossman Westinghouse Natalie Rodgers Westinghouse
Yan Peng Chinese Atomic Energy Susan Sterrett Public
Enclosure
PKG, ML24290A166 Meeting Notice, ML24275A131 SNC Slides, ML24282A982 SNC Slides, ML24289A235 Meeting Summary, ML24290A158 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DSS/SNSB/BC DORL/LPL2-1/BC DORL/LPL2-1/PM NAME JLamb KGoldstein PSahd MMarkley JLamb DATE 10/15/2024 10/17/2024 10/22/2024 10/24/2024 10/24/2024