Monthly Operating Data for November 1975
ML18347A831
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/03/1975
From: Vernick H
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A831 (4)


Text

... .1

  • consumers Power company Palisades Nuclear Plant: Route 1, Box 178, Covert, Michigan 49043 December 3, l975 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C. 20555 RE: License Reports of Monthly Operating Data DPR-20, Docket No. 50-255 Gentlemen:

DEC--81975 U.o. A1"; ... c:*1tiHil'

,,..,.\ COMMISSION

  • . ft **"i'iarory Enclosed is a copy of the Monthly Operati.ng Data for the Palisades Nuclear Plant for the month of November l975. Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 13648
. . .-. .

-.... *. APPENDIX D* . ' Palisades UNIT--------

DATE __ . COMPLETED BY H. R. Vernick DOCKET

___ _ OPERATING STATL'S . I. REPORTll'\G PERIOD: 75110i THROUGH __

HOURS IN REPORTl:'\G PERIOD: ___ 7_2_0 __ -_,---------------------,,..,,..,...--

2. CUR RE NTL Y ACTHORIZED POWER LEVEL 2200 MAX. DEPENDABLE CAPAC6TY (MWe-NET) 684 3.. LOWEST POWER LEVEL TO Wl!ICI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET):

__ 3_0 _______ _ .4.

FOR J3.ESTRICTION (IF AN_Y): s. 6. 7. 8. 9 *. 10: 11. 12. 13. 14. 15. 17. 18. THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL.

...* : *******. REACTOR RESER VE SHUTDOWN HOURS ******* HOURS GENERA TOR ON LINE.* .. .*. ******* \JNJT RESERVE SHUTDOWN HOURS . * .. : .**. * ** .'

GENERA TED

.**** ; ***************

GROSS.ELECi:RICAL ENERGY <;EXE RA

... , .......*..****.

  • ** NET ELECTRICAL ENERGY GENERATED (MWll) ***.******.*.**.*.********

-** REACTOR AVAILABILITY FACTOR (1) *********

UNIT AVAILABILITY FACTOR (2) .**..*******.

l 1 NIT C'AP.-\Cl"!Y FACTOR (3) .....*.********

l'NIT FORCED Ol!T.AGE RATE (4) .......*****

720 720 0 1,212,960 368,220 341,+48. 1QO% 100% 69.3% 0% YR TO DATE 5;386.5 0 5,189.1 0 8,367,432 2,487,550 2,289,375 67.2% . 64*.1% 41. 8% 34.5% CUMULATIVE TO DATE 15 ,623. 4--". 0 -----14,510.2 0 22,48ci,992 6,991,800 6,543,080

45. 5% . 42.3% .. * . 3i. 5% sm:TDOWNS SCllEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE. AND DURATION OF EACH): IF SllCT DOWN .-\TEND OF REPORT PERIOD, ESTlll!ATED DATE OF STARTUP: ____________

_ UNITS IN TEST ST.-\ TL'S" RIOR TO OPERATION)

REPORT THE FOLLOWING:

INITlr\l CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION DATE LAST FORECAST DATE ACHIEVED (I) . R,EAC'TOR r\ \'AILABILITY FACTOR HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 (2) l:NIT AVAILABILITY FACTOR U-ilT FORCED Ol'TAGE RATE HOURS GENERATOR ON LINE ---*----------XlOO HOURS IN REPORTING PERIOD NFT El.F.CTRICAL PO\\TR

  • MAX. Dl*.l'ENl>ABLE CAPACITY X HOURS IN REPORTING l'ERIU() FORCED QL:TAGE llQL:RS HOliRS GENERATOR ON LII"'E +FORCED OUTAGE HOURS 1.16-D-l I *-, .

t"*** a Cs h'ir *ntr 0 01°t"t tr; . tt'Mh 0 . \ TYPE F*FORCED DURATION NO. DATE S*SCHEDULED (HOU.RS) Nori.e --°' rr. -. ' * . : . .. '.

  • .

*--*

.........

-_. ...... _. ------------

...

  • -0 APPENDIX E UNIT SHUTDOWNS .o. DOCKET NO. 50-255 --------------

UN IT NAME Palisades Nuclear Plant

  • DATE J2/3/75 .COMPLETED UY H'. R. Vernick . . . ' -. , REPORT MONTH November, 1975 ' . METHOD OF DOWN REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS/COMMENTS

' ,' '. . I -, ,, : . : '. "--' (1) REASON (2) MF.TH OD . A--EQUIPMENT FAILURE"(EXPLAIN) 1-MANUAL B-MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM I . 0-REGULATORY RESTRICTION 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION

.. F-ADMINISTRATIVE

--". G-Ol'ERA TIONAL ERROR (EXPLAIN)

. ' *-H-OTHER (EXPLAIN)

,, '. ; . " : *' ., I ., . SIJjJIMARY:

The un::\.t operated at* 70..,.80%

for the *month of Nb'lremper . -* *' : ' . ' . ' .. '. t'

..... .. . .. -* " APPENDIX C ,.

  • DOCKET NO. 50-255 . . UNIT Palisades*

Nuclear Plant DATE 12/3/75 COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWc-nct)

DAY (MWe-net) 1 .. 191 17*. *485 2 . 438. 18. 487 / 3 --47:1 .. .19' 487 4 479 20 486 5 483 21 487 6' 485 .* *22 489 '" 7 478 23 488 . 8 *485 24 * .... .490 9 .481 25 484 10 484 . 26 . 484 1r 486 27. . 487 12 488 28 490 13 488 29. 483 __ , 14 489 30 486 1'5 488 31 487 . ... 16 DAILY UNlTPOWER LEVEL FORM INSTRUCTIONS

  • .On this form, list the average daily unit power level in M\Ve-net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usii1g maximum dependable capacity for the net dcctric.::il rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level* line). fo such cases, the . .. average daily unit power output sheet should be footnoted to explain the apparent anomaly. ( . . . . ... ... ..... 1

  • l . . * . . . * . * . . . . . .. '

'.'-

... c :;y:;zi;t ti 5Y,J&

.. Q

-. . ' ! '